Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Online FTIR analysis for improved efficiency in alumina productionBy K Haroon, J D. Speed, S P. Wood
Online analysis of continuous and batch processes has seen a dramatic increase in recent years, with examples ranging from petrochemicals to pharmaceuticals, to industrial biotechnology and food and d
Aug 24, 2022
-
Reconciliation – Outcomes and ExpectationsBy W J. Shaw
Mining operations must become more predictable to overcome the volatility that has characterised the mining industry. Comparisons of production against predictions will become more consistent as minin
Aug 18, 2014
-
Preparation of Mine Fill and Disposal of Residue at Zinc Corporation New Broken Hill Consolidated, Broken HillBy Johns AS
Comissioning of a new residue disposal tcluding upgraded classification for none backfill preparation, new variable speed pumps and a new residue dam took place in 1¦76. The system is described.
Jan 1, 1978
-
Resource Estimation for the Aurukun Bauxite DepositBy C Grobler, M Recklies, G Jiang, I Taylor, M Morgan, G MacDonald, L Smith
The resource estimation of lateritic deposits, such as Aurukun, presents specific issues related to the lateral changes in thickness and elevation of the various horizontal layers (or zones) within th
Jan 1, 2009
-
Diesel Exhaust and the Underground Miner in Western AustraliaBy O Jones
Longstanding occupational health challenges of the underground hard-rock mining sector require both an analysis of historical data to assess evidence of linkages between the source of the problem and
Aug 31, 2015
-
The Fan Installation at Laleham CollieryUnderground mine ventilation is now com monly simulated on a digital computer. Such a programme, incorporating natural ventilation has been modified by others to account for methane emission and el
Jan 1, 1983
-
Lessons learned from attempts at minimising CO2 emissions in process metallurgy – pyrolysed secondary raw materials, bio-coke, and hydrogen as alternative reducing agentsBy F Diaz, G Hovestadt, B Friedrich, D Latacz, M Sommerfeld
The metallurgical sector significantly contributes to the global carbon footprint and encounters the challenge of developing more sustainable production methods. This study introduces novel approaches
Jun 19, 2024
-
Localised Indicator KrigingBy I Douglas, L Allen
Localised indicator kriging was developed following a similar approach used by Marat Abzalov (2006) in his paper titled æLocalised uniform conditioning (LUC): A new approach for direct modelling of sm
Sep 26, 2011
-
Applications of Advanced Remote Sensing Systems during a Mine LifeBy B P. Banerjee, S Raval
In the recent past there have been dramatic advancements in the development of remote sensing platforms (satellite, aircraft and unmanned aerial vehicles – UAVs) as well as sensor systems (multispectr
Jun 28, 2016
-
Experimental Validation of the Discrete Element Method (DEM)By W Wu
The prospect of discrete element modelling (DEM) being used as an everyday design tool for transfer chutes in the iron ore mining industry is becoming more and more probable. However, much care needs
Jan 1, 2007
-
The design and implementation of the Kibali gold mine off-shaft developmentBy T Peters
The Kibali Gold Mine is currently comprised of several open pits, a 3.5 Mtpa underground mine and a 7.5 Mtpa processing plant. Development of the underground operation commenced in December 2012, with
Mar 29, 2023
-
Sensor-based Real-time Resource Model Reconciliation for Improved Mine Production Control – A Conceptual FrameworkBy M W. N Buxton, M S. Shishvan, J Benndorf
The flow of information, and consequently the decision-making along the chain of mining from exploration to beneficiation, typically occurs in a discontinuous fashion over long timespans. In addition,
Nov 24, 2014
-
One Orebody ù Two Tenements ù Multiple Owners: How to Apportion Costs and Production Equitably Over the Mine Life?Production sharing and cost apportionment in joint ventures is commonplace in Australasia today and elsewhere. It is a recognised convention that, with the exception of a free carry situation, joint v
Jan 1, 2002
-
Evolution of a Structural Framework for High-grade Iron Ore DepositsBy A R. Cruden, M S. Egglseder
The formation of banded iron formation (BIF)-hosted high-grade iron ore deposits in the Hamersley Province, Australia has been debated for decades. Although a structural control on their formation is
Jul 13, 2015
-
Mt Wright – geotechnical learnings from a sub level shrinkBy P Wilson
The Mt. Wright Underground Mine is located near the town of Ravenswood in North Queensland and is operated by Carpentaria Gold – a wholly owned subsidiary of Resolute Mining Limited. The establishment
Nov 30, 2018
-
A Managed Approach to Project InsuranceHistorically the insurance industryÆs involvement in any project has been relatively late in the process. Often it was a case of the last item to be ticked off the checklist has been to ensure that th
Jan 1, 2007
-
The Barrier Mines-A Historical OutlineThe "Line of Lade", a generic term by which the great Broken Hill orebodies are collectively known, lies in the County of Yancowinna, New South Wales (NSW) at the south eastern extrenity of the Ba
Jan 1, 1983
-
Real-time Methane Detection – Modern Digital Laser Spectroscopy for Hostile EnvironmentsBy D Chalmers, C C. Harb
The detection and control of gas levels in mining is a continuing challenge for the industry. Standard detectors have many problems that could be overcome with laser based spectroscopic instruments, b
Aug 31, 2015
-
Is Truck Queuing Productive?By P Malkin, S Thomas, P M. Stone, D Kostyuk
In open pit mining, it is common that the bottleneck to productivity and profit lies in the truck-shovel mining operation, especially as strip ratios and mining intensity have increased with resource
Nov 24, 2014
-
Design and Construction of Tunnels for Northern Gateway Project, New ZealandBy M Behrens, A McPhee, B D. Hegan
This paper describes the design and construction of twin 400 m long road tunnels as part of the Northern Motorway Extension Project in Auckland, New Zealand. Construction of the tunnel civil works is
Jan 1, 2008