Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Influence of Pyrite on Galena Oxidation and Subsequent Flotation

    Folklore suggests that oxidation is detrimental to sulfide mineral flotation, and in many instances is the reason given for values reporting in the tailing. However, while a considerable body of work

    Jan 1, 2005

  • AUSIMM
    The Resource Valuation and Optimisation Model Real Impact from Real Options

    By C Tonkin, S D. Howell, P V. Johnson, J Moriarty, P W. Duck

    This paper presents the scientific framework underpinning the resource valuation and optimisation model (RVOM). The RVOM is a partial differential equation based real options software package, which h

    Sep 26, 2011

  • AUSIMM
    Study on Mining Method in Deep Position of Jinchuan Nickel Mine, China

    By C Li, S Wang, L Qiao

    Jinchuan nickel mine is the largest nickel mine in China. Cut-and-fill mining method with high density cementing materials is used in the mine. The original mining design divided the mining operation

    Jan 1, 2000

  • AUSIMM
    Operating Performance of the Phu Kham IsaMill™

    By G Harbort, D Zoetbrood

    "The Phu Kham copper-gold operation in the Laos People’s Democratic Republic (PDR) is owned and operated by Phu Bia Mining Limited. PanAust Limited holds a 90 per cent interest in Phu Bia Mining Limit

    Oct 10, 2016

  • AUSIMM
    Grade engineering at Gramalote gold deposit, Colombia: an example of industry – research collaboration, Part 2

    By N Clarke, J Hunt, A Barros, N Guerrero, L Keeney

    Grade Engineering® (GE) involves a range of integrated technologies and operating protocols for improving effective feed grade through early rejection of low value material prior to costly processing

    Nov 10, 2020

  • AUSIMM
    Design of Segmental Lining for Waterview Project, Auckland, New?Zealand

    By S Pradhan, A Kuras, R Mahajan

    This paper describes the design of the precast concrete segmental lining for the 13.1 m internal diameter and 450 mm thick, 2.4 km long mainline tunnels for the Waterview Connection project in Aucklan

    Sep 17, 2014

  • AUSIMM
    Sensors and Systems for the Measurement of Tunnel Movements During and After Construction

    By W Ward, J Clegg, R Barnes, T Zhong

    This paper provides an overview of methods for measuring tunnel deflection and construction’s effects on the surrounding environment during and post construction. It will also review illustrative case

    Sep 17, 2014

  • AUSIMM
    Approaches to Reporting Grade Uncertainty in High-Nugget Gold Vein Projects

    By W B. Edgar, S C. Dominy

    High-nugget effect vein-gold systems are generally considered to be one of the most challenging of deposit types to evaluate and exploit. To potential investors and mining companies, they are viewed a

    May 24, 2012

  • AUSIMM
    The Role of Historical Research in the Development of the æNew BendigoÆ Gold Project, Central Victoria

    By J Bartlett, P Quigley

    Historical research has played a significant role in the rebirth of the Bendigo Goldfield. The historical research undertaken by the company has been directed to specific areas such as verifying the t

    Jan 1, 2003

  • AUSIMM
    Issues in Capital Raisings and Disclosure

    By B Dodd

    This paper details how the Australian Securities and Investments Commission (ASIC), as a disclosure and conduct regulator, approaches regulation of continuous disclosure, capital raising and control t

    Nov 20, 2012

  • AUSIMM
    Permian and Mesozoic Tectonic and Structural Events in the Bowen and Surat Basins and New England Orogen, Southwest Pacific Rim (89cff146-d60b-4074-bb84-62f6785f9161)

    By Totterdell JM

    The Permian-Triassic Bowen Basin and the Jurassic-Cretaceous Surat Basin evolved in a backarc tectonic setting behind an active convergent plate margin in eastern Gondwana. Several extensional (Early

    Jan 1, 1995

  • AUSIMM
    Embedding Geometallurgy into Mine Planning Practices – Practical Examples at Olympic Dam

    By H Bruyn, K Ehrig, V Liebezeit, A Robertson, M Smith, D Grant

    "The Olympic Dam geometallurgy program has generated a large quantity of data that has been used to create a geometallurgically enabled block model. An ongoing challenge is to convert data into usable

    Jun 15, 2016

  • AUSIMM
    Australian Innovation in African Heavy-Haul Rail

    By K Devencorn

    The development of robust, economical transport infrastructure has been identified as a key driver to sovereign economic growth. Notwithstanding the value of undeveloped mineral resources, unless they

    Nov 22, 2011

  • AUSIMM
    Modelling Blast Movement for Grade Control

    By O Handayani, R Barr, E Isaaks

    The mining industry has focused a great deal of attention recently on the impact of blast movement on grade control. Although the problem of blast movement and its contribution to dilution and ore los

    Aug 18, 2014

  • AUSIMM
    The Design, Installation and Commissioning of an Absorption Refrigeration System at Gwalia Gold Mine in Western Australia

    By J deVries, A Broodryk, P Kyselica, K McLean

    Gwalia gold mine is located close to the town of Leonora in the Goldfields region of Western Australia, some 830 km from Perth. The mine is wholly owned by St Barbara Ltd, an Australian Securities Exc

    Aug 31, 2015

  • AUSIMM
    Training our New Starters – Between a Rock and a Hard Place

    By M Davis

    Increasing growth in the minerals industry over the past decade has raised the question of whether the standard of training for new geologists has been negatively impacted. This hypothesis was tested

    Aug 22, 2011

  • AUSIMM
    Breadth and Depth – Ground Breaking Shafts for Melbourne Sewer Projects

    By N Lewis

    Recent major urban trunk sewer infrastructure projects in Melbourne have involved construction of nearly 10 km of tunnel boring machine (TBM) driven tunnels in a range of geological conditions varying

    Mar 8, 2011

  • AUSIMM
    Knelson Continuous Variable Discharge Concentrator: Analysis of Operating Variables

    By I Grewal, B Klein

    The Knelson Continuous Variable Discharge (CVD) is a continuous centrifugal gravity concentrator for high-mass yield recovery applications. It has four operating variables that enable control of mass

    Jan 1, 2001

  • AUSIMM
    Development of a visual measurement system of geomaterials under triaxial compression

    By D Asahina, T Endo, H Hosono, T Takemura

    Changes in the stress field around faults due to the excavation of underground space or the extraction of underground resources induce fault reactivation. To understand the mechanism of fault reactiva

    Nov 29, 2022

  • AUSIMM
    Petrology of the Zinc Lode, New Broken Hill Consolidated Ltd., Broken Hill, New South Wales (1b1fdba3-cb7d-447a-a5a8-98ac9ed727eb)

    Dr. F. L. Stillwell. Segnit's article puts forward the views that the rocks associated with the Broken Hill lode are simply highly metamorphosed sediments, tbat metasomatism on a large scale was

    Jan 1, 1962