Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Rock Mass Classification as an Aid to Estimating the Strength of Coal Pillars

    By Tyler DB, Thin LGT

    Coal mass strength properties must be estimated to obtain realistic estimates of coal pillar strength. The limitations of existing techniques for approximating these properties are discussed. The c

    Jan 1, 1992

  • AUSIMM
    Engaging Generation Y with the Minerals Industry

    Following a decline in direct and indirect employment in the minerals industry between 2000 and 2003, the situation reversed in 2004 and employment rose by 12 per cent. Furthermore, there are forecast

    Jan 1, 2005

  • AUSIMM
    Cratering Theory Evolves into New Underground Mining Technique

    The introduction of large diameter holes to underground mining has provided the first opportunity to apply near spherical charges in production scale blasts instead of the convent- ional long cylind

    Jan 1, 1978

  • AUSIMM
    Paper No. 126. Silver-Lead Ore Mining And The Various Systems of Stoping And Timbering Employed in Broken Hill, New South Wales.

    As this district is so far distant from the other mining centres and its mode of approach so circuitous, I am afraid that many residents of other portions of the Commonwealth never think of paying thi

    Jan 1, 1903

  • AUSIMM
    Some Bosh and Hearth Features of Blast Furnaces in India Operating with High Ash Coke

    By Singh BN, Chakravarty PK, Chatterjee LM

    Indian blast furnaces operate with coke gener- ally containing 24 to 28% ash compared to 10-15% ash in coke in most other parts of the world. The operating problems are further aggravated by the hi

    Jan 1, 1981

  • AUSIMM
    Flotation of copper sulfide minerals and pyrite with new and existing sulfur-containing collectors

    By Wang SS, Frattaroll DR

    In the development of novel sulfide collectors, especially for the low-lime and acid circuits, flotation of chalcopyrite, chalcocite, covellite and pyrite was studied with both new and commerciall

    Jan 1, 1986

  • AUSIMM
    Changehouses and Equipment at North Broken Hill Limited

    The scheme of rehabilitation of surface plant commenced in 1936, included the provision of improved and more hygienic changing and bathing facilities for the employees.At that time the Thompson's

    Jan 1, 1940

  • AUSIMM
    Recovery of Iron Ore Fines and Ultrafines from Tailings by Using Wet High-intensity Magnetic Separation – JONES WHIMS

    By M Gerards, M Steinberg, T Graham

    The quality and quantity of Australia’s secondary deposits, which include tailings streams and tailings dams, are higher than most countries’ primary deposits. In addition, these secondary deposits ha

    Jul 13, 2015

  • AUSIMM
    A Safety Man Car for Use in Inclined Shafts

    By Drain P, Dibdin T. R

    THE completion of the Linda incline man and supply haft at the Mount Morgan Gold Mining Oompany's mine led to an investigation of the various safety gears in general use in mining shafts. One of

    Jan 1, 1911

  • AUSIMM
    Geotechnical Investigations for New Strip Mines

    With increasing depth of mining, geotech nical factors assume increasing importance in the design and operation of open pit coal mines. Dragline strip mines are particularly sensitive to stability

    Jan 1, 1981

  • AUSIMM
    A New Mining Method For Thick Seam Coal Mining

    By O. J. RICHARDS

    The Wongawilli system of mining has been in use for over 30 years and has enabled high production rates and acceptable extraction ratios to be achieved in seams less than 4 m in thickness. A modifi

    Jan 1, 1980

  • AUSIMM
    Centrifugal and Positive Displacement Pumping of Titanomagnetite Ironsand (The AuslMM Annual Conference Rotorua New Zealand)

    By Hustwick I

    New Zealand Steel Mining Limited operates two independent sand mining operations on the West Coast of the North Island of New Zealand. (Fig. 1)Waikato North Head 30km south of Auckland supplies ironsa

    Jan 1, 1990

  • AUSIMM
    Diversion decision making with an integrated approach to design for operations and mine closure

    By M Rafty, A Markham, S Atkinson

    Australia contains some of the most productive mining areas and is characterised by ancient landscapes and highly variable hydrology. Historical mining of iron ore, coal and other minerals has targete

    Jul 25, 2018

  • AUSIMM
    A Study of Floor Heave in the Mines of the Southern Coalfield of New South Wales by Two Dimensional Finite Element Modelling

    By Seneviratne SP

    The excessive displacement of the seam floor in headings (i.e. roadways) called 'floor-heave' is often experienced in the underground mines of the Southern Coalfield of New South Wales. A

    Jan 1, 1992

  • AUSIMM
    Looking for an Adequate Drilling Spacing and Heterotopic Sampling û An Iron Ore Example

    By D T. Ribeiro, J F. C L Costa, J C. Koppe

    Drilling and sampling are responsible for most of the costs during mineral exploration, especially in multi-elements and polymetallic deposits, such as iron, manganese and bauxite deposits. On these d

    Sep 26, 2011

  • AUSIMM
    Cobalt, copper tailings and the circular economy – a case study from the Capricorn Copper Mine, north-west Queensland minerals province

    By L Nicholls, A Parbhakar-Fox

    Reprocessing Queensland’s historical copper tailings for critical minerals is an opportunity to circularise the state’s mining industry by converting waste liabilities into assets. Mine waste valorisa

    Aug 2, 2023

  • AUSIMM
    Wet grinding, settling and filtering characteristics of Australian and Brazilian iron ores

    By Q Zhou, J Pan, D Q. Zhu, C C. Yang

    Oxidised pellets have become an indispensable high-quality charge for blast furnaces (BF) due to their uniform particle size, high iron grade, high mechanical strength, good metallurgical performance,

    Sep 18, 2023

  • AUSIMM
    Development of New High-Strenght Zinc Alloys

    By Kubo H, Ninomiya R, Ojiro T, Sato T

    New high-strength Zn alloys for moulds are demanded from the automobile and electric industries in Japan, because the s rength of Zn moulds is still not high enough for the mass production. There ar

    Jan 1, 1993

  • AUSIMM
    Agglomeration – The Key to Success for the Murrin Murrin Ni Laterite Heap Leach

    By D Readett

    The most critical variable in the successful establishment of the Murrin Murrin Heap Leach plant was the effective agglomeration of the Ni laterite ore. This paper describes the test work undertaken t

    Aug 8, 2011

  • AUSIMM
    Virtual Reality Scientific Visualisation – A Solution for Big Data Analysis of the Block Cave Mining System

    By J Tibbett, A Colebourn, B Hebblewhite, F Suorineni

    The concept of Big Data refers to data sets that are so large, variable and/or complex that traditional data processing applications struggle to integrate the data for effective investigation, analysi

    Nov 4, 2015