Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Evaluation of Low Profile Electric Loader in Conjunction with Electric Monorail Haulage System in Narrow Vein Mining

    By B Besa, E K. Chanda

    It has long been recognised that narrow vein mining needs innovative approaches to mine access and mining methods in order to improve the economics of this vital part of the mining industry. The minin

    Mar 26, 2012

  • AUSIMM
    Bulk Explosives go Tunnelling in Hong Kong

    The constructionhunnelling industry in Hong Kong has taken an upturn during the last few years due to the commencement of works to relocate the International Airport to Chek Lap Kok Island. The Airp

    Jan 1, 1994

  • AUSIMM
    Geomechanical modelling of the Ernest Henry iron oxide copper gold deposit – identifying fluid pathways to predict potential mineralised zones

    By J G. McLellan, B Miller

    Copper and Gold mineralisation at the Ernest Henry deposit is bound by two controlling shears along the hanging wall and footwall margins. The shear zone geometries have been influenced by a large dio

    Sep 20, 2017

  • AUSIMM
    Meeting Reporting Requirements for Very Low Concentration Ore Reserves

    Ore reserve estimates form a basis for strategic mine planning at Argyle Diamonds open pit and alluvial operations. Most ore reserve statements are mainly concerned with resource tonnage and grade.

    Jan 1, 1990

  • AUSIMM
    Presentation of the Institute Medal, 1977 to Howard Knox Worner, C.B.E.

    By J. K. A. McLEOD

    Address by the President of the Institute (Mr J K A McLeod) in presenting the Institute Medal to Howard Knox Warner, C.B.E. Address by Howard Knox Warner after accepting the award.

    Jan 1, 1978

  • AUSIMM
    Upgrading of Indonesia's Bauxite by Washing Method

    Upgrading of Indonesia's Bauxite by Washing Method There were eight bauxite samples used in this research, three samples from Kijang contain total SiO2 18.36 - 29.16 per cent, Al2O3 40

    Sep 13, 2010

  • AUSIMM
    Integration of Oil Sands Mine Planning and Waste Management Using Goal Programmin

    By E Ben-Awuah

    Mine planning is the backbone of all mining enterprises and determines the profitability or otherwise of any mining investment. Providing high quality ore and tailings containment at the right time ar

    Sep 26, 2011

  • AUSIMM
    Planning Of Exploratory Drilling Programs, Logging And Sampling Of Explotary Drill Holes For Coal

    By Svenson D

    For fully effective information to be obtained from exploratory drilling for coal, drilling programs should be planned systemati- cally in successive stages, on the basis of existing geological crit

    Jan 1, 1977

  • AUSIMM
    Australia's First and Second Nickel Booms: The Similarities and Contrasts

    Between 1966 and 1976, Australia moved from being a non-producer to a position of meeting more than ten per cent of world nickel demand. New mine developments beginning the early-1990s have the prom

    Jan 1, 1996

  • AUSIMM
    Risk Assessment for New Technology in the Open Cut - Wambo Dragline

    By Lumley G. I, Duffy W. J

    The risk involved with incorporating new/unfamiliar technology into mines has, in the past, largely been evaluated by the supplier of the technology. The implications on safety and productivity has be

    Jan 1, 1992

  • AUSIMM
    A fundamental investigation on welding flux tunability geared towards high heat input submerged arc welding for shipbuilding applications

    By H Yuan, H Tian, Y Zhang, Z Wang, C Wang

    Submerged arc welding (SAW) is one of the significant metal-joining processes for manufacturing marine vessels, steel pipes, and offshore structures with high deposition rate and engineering reliabili

    Aug 21, 2024

  • AUSIMM
    Acid Rock Drainage Prediction and Waste Rock Segregation Plan for Ankerite-Containing Mine Waste ù Restigouche Mine Case Study

    By R Carreau

    The results of a detailed acid rock drainage (ARD) prediction program were used to revise the waste rock segregation criteria at the Restigouche open pit mine. Waste rock at the site was predominately

    Jan 1, 2003

  • AUSIMM
    Effective Use of Mine Waste in the Design of a Residue Storage Facility, Pilbara Region, Western Australia

    By A Wanninayake, E Novello, I Gillani

    A residue storage facility (RSF) was designed to cater for Davidson Creek Area and Robertson Range Area operations under the FerrAus Pilbara iron ore development project in the Pilbara Region, Western

    Aug 12, 2013

  • AUSIMM
    Ultramafic Mine Tailings to Treat Acidic Mine Water and Lock Away Carbon through Mineral Carbonation

    By S Bouzalakos, W Timms, H Malli

    Combining ultramafic mine tailings and acidic mine drainage via mineral carbonation to sequester carbon dioxide, presents an opportunity to minimise waste on mine sites. Low pH mine water with trace e

    Jul 27, 2015

  • AUSIMM
    Assessments of Ground Conditions for Exploration Prospects and Mines

    Mining software systems have provided a basis for integration of resource, survey, and design functions. They can similarly provide a basis for incorporating ground conditions into the process.Explora

    Jan 1, 1993

  • AUSIMM
    Phosphorous Removal from Iron Ore with a Low Temperature Heat Treatment

    By R R. Lovel, G J. Sparrow

    Currently there are large reserves of good quality iron ore near to existing infrastructure that are not being developed because the phosphorous levels are above acceptable market specifications. Sinc

    Jan 1, 2009

  • AUSIMM
    Mechanisms on the impacts of basicity on hydrogen-rich gas-based direct reduction of pellets

    By J Pan, C M. Tang, D Q. Zhu, C C. Yang, S W. Li, Z Q. Guo

    The short process of electric furnace steelmaking with direct reduction iron (DRI) as raw material is an important process for smelting high-quality and special steels. In order to prepare high-qualit

    Sep 18, 2023

  • AUSIMM
    Sustainability in New Projects - Achieving Outcomes Which are Beyond 'Business as Usual'

    Many mining companies aim to integrate sustainability principles into their new projects. There is an intention for improvement, but frequently this results in little more than 'business as usual

    Jun 1, 2010

  • AUSIMM
    Flocculant Selection for Coal Process Streams

    By Loo C. E

    Thirty two polyacrylamide flocculant samples were selected from the wide range offered to the Australian coal industry. An extensive test program was conducted to consider the properties of the flo

    Jan 1, 1989

  • AUSIMM
    A New Rock Bolting Concept for Underground Roadways

    The Skybolt is a new bolt concept, point anchored with resin in large diameter holes of specific sizes 38 mm and 45 mm. The new design achieves the optimum annular spacing required for mixing the

    Jan 1, 1992