Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Perspectives on the Long-term Outlook for Iron Ore

    By J P. Barkas

    World demand for iron ore is far from peaking, and the substantial price decline that has captivated commentators since early 2014 is not the result of widespread misreading by producers of the prospe

    Jul 13, 2015

  • AUSIMM
    Integrated Optimisation of Grinding and Flotation Circuits

    By P Holtham, K C. Runge, E Tabosa

    Traditionally, comminution and flotation have been surveyed, analysed and optimised separately. This often results in less than optimal outcomes because of the complex interactions between the two pro

    Sep 1, 2014

  • AUSIMM
    Continuously Cast Zinc Alloy Bar Stock - Applications and Benefits

    The continuous casting of zinc alloys has been of fundamental importance for many years in the production of a number of products, including sheet for architectural applications, battery cans for dr

    Jan 1, 1993

  • AUSIMM
    The development of DRI pellets for green steelmaking

    By C R. Ure

    To substantially reduce, if not eliminate, carbon dioxide (CO₂) emissions from ironmaking it is necessary to convert from blast furnace (BF) ironmaking using coking coal as the reductant to direct r

    Sep 18, 2023

  • AUSIMM
    No. 3 Headframe

    To finalise the arrangement and details of the headframe to be erected over the new No. 3 Shaft, the haulage and winding equipment requirements were first determined, then tentative designs were prepa

    Jan 1, 1957

  • AUSIMM
    Gold Deposits in Highly Metamorphosed Terranes

    By A G. Tomkins

    "Approximately 32 per cent of the worldÆs total gold production has come from greenstone belts (Frimmel, 2008). In these regions numerous small to large, quartz vein-associated gold deposits are hoste

    Sep 26, 2013

  • AUSIMM
    Paper No. 185. Presidential Address. Statistics And Economics.

    GENTLEMEN, I have to thank you very much for the honour you have conferred upon me by electing me President of the Institute for this year. On behalf of resident members, I have to offer the visitors

    Jan 1, 1911

  • AUSIMM
    Viscosity evaluation of hot metal containing vanadium and titanium via a novel measurement technology and the thermodynamic analysis method

    By J Wen, P Hou, W Yu, M Hu, Z Jiang, C Bai

    Vanadium titano-magnetite (VTM) is one of the important iron ore resources in the world. High viscosity and low fluidity are the basic characteristics of hot metal containing vanadium and titanium dur

    Aug 21, 2024

  • AUSIMM
    Improving the Performance of Precipitator Tanks in an Alumina Refinery Using CFD Modelling

    By A Manzoori, M T. Shadloo

    This paper describes a CFD modelling study which was carried out to investigate possible improvements in the design of an alumina precipitator tank at the Jajarm plant of Iran Alumina Company. In part

    Jan 1, 2006

  • AUSIMM
    Project Evaluation – A Non-Executive Director’s Perspective

    By R Knight

    "In project evaluation there are two matters of keen interest to non-executive directors: the process by which an investment recommendation is reached, as well as the investment itself, as presented.

    Mar 8, 2016

  • AUSIMM
    Field Measurement of Transient Pore Pressures within Co-disposed Processing Rejects Placed in a Spoil Dump

    By R Van Laeren, G Langerak, S Fityus, K Koosmen

    Co-disposal of partly-dewatered mixed-plant rejects (MPR) from coal processing into spoil dumps is gaining favour amongst Australian coalmine operators in preference to conventional tailings disposal

    Jul 27, 2015

  • AUSIMM
    Field Parametric Geostatistics Geostatistical Rigorous Solutions Dealing with Extreme Grades During Resource Estimation

    By M Armony, J F. C L Costa, J C. Koppe

    Linear kriging methods fail to estimate local grades and local reserves for highly skewed variables due to three reasons: it uses only part of the available data information, it has no physical princi

    Sep 26, 2011

  • AUSIMM
    Are Your Megaproject Schedules and Costs Under – or Out of – Control?

    By P Mitchell, S Pushpan, G Ferres, K Bobbermien, L Hudson

    "Falling commodity prices and a rising supply surplus have ushered in a period of restraint in capital project investment across the global mining and metals sector. Competition for capital project fu

    Mar 8, 2016

  • AUSIMM
    TiRON – A New Process for the Production of High-Grade Feedstock for TiO2 Pigment Manufacture

    By J M. Shekiro

    In the chloride process to manufacture TiO2 pigment, feedstocks containing higher TiO2 contents (high-grade ores or HGOs) are favoured in order to minimise production of undesirable by-products. Most

    Oct 5, 2011

  • AUSIMM
    The Newcrest Telfer Hoisting System ù A Very Large Friction Hoist Installation

    The hoisting system at the Newcrest Telfer mine is designed for a final duty of 7.35 million tonnes per annum at a hoisting distance of 1450 m. In terms of hoisting capacity (t/h) times hoisting dista

    Jan 1, 2005

  • AUSIMM
    Australian and Global Setting for Gold in 2013

    By G N. Phillips

    Global annual gold production has been remarkably constant over the last decade at ~2500 t/a3. The major producers today are China (annual production over 350 t and rising), Australia (250 t), USA (24

    Sep 26, 2013

  • AUSIMM
    The Nickel-Copper Deposit at Radio Hill, Karratha, Western Australia

    By Wightman D, Hoyle M. W H, Peters W. S

    The Radio Hill nickel-copper deposit is located 30 km south of Karratha. It is a new discovery in an area where similar mineralization had been previously discovered at Mt. Scholl and Ruth Well. Radio

    Jan 1, 1987

  • AUSIMM
    Primary vertical Crafter Retreat Mining at the Zinc Corporation, Limited

    By Hebbard GJ

    Vertical crater retreat mining is being used at Zinc Corporation, Limited and New Broken Hill Consolidated, Limited for pillar recovery between previously mined and filled stopes. In order to increase

    Jan 1, 1985

  • AUSIMM
    Ore Dilution Versus Mine to Mill Optimisation at KCGM

    By M Spiteri, S Woth, J Caratti, K Henley

    Blasting is an essentially violent process aimed to disrupt and loosen rock for productive excavation and downstream processing. Dilution of the orebody to some extent is the inevitable result, partic

    Jan 1, 2001

  • AUSIMM
    Gold mineralisation on Woodlark Island, Papua New Guinea

    By Shatwell DO, Hayward SB, Leach TM

    Following acquisition of the Woodlark Island tenement by Highlands Gold Limited, an exploration programme using extensive diamond drilling has confirmed that the style of gold mineralisation is simila

    Jan 1, 1994