Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Modelling the Impact of Rockmass and Blast Design Variations on Blast Fragmentation

    By S S. Kanchibotla, I Brunton

    Most blast fragmentation models assume the rock mass properties, explosive properties and blast design variables to be constants and uniformly distributed within a blast. However, in reality all these

    Jan 1, 2001

  • AUSIMM
    Analysis on composition and physico-chemical property change of PbO-bearing slag in Pb smelting

    By G Cao, Y R. Cui, J X. Zhao, H P. Gui, G H. Wang, Z M. Wang, M M. Ren, B Li

    Pyro-metallurgy is still the main process for lead production and a lot of lead direct smelting processes have been developed in recent years. All the processes will experience two steps in common. Th

    Aug 21, 2024

  • AUSIMM
    Development and Implementation of the Garford Dynamic Bolt at the Kanowna Belle Mine

    By R Lachenicht, J Player, A Thompson, E Villaescusa

    Kanowna Belle Gold Mine is a deep, high-stress, sublevel open stoping mine located near Kalgoorlie. Seismic activity during the development cycle presented problems, including concerns regarding the e

    Jan 1, 2008

  • AUSIMM
    Stratigraphy of the Marra Mamba Iron Formation within the Chichester Range and its Implications for Iron Ore Genesis at Roy Hill - Evidence from Deep Diamond Drill Holes within the East Fortescue Valley

    By P Hawke, J Hurst, B KrapeP

    Hancock Prospecting Pty Ltd (HPPL) drilled two deep diamond stratigraphic holes (ECD0001 and RHD0296) within the eastern Fortescue Valley in the Pilbara of Western Australia. Located south of the Roy

    Aug 12, 2013

  • AUSIMM
    Monitoring Design and Data Management for a Multiwell CO2 Storage/Enhanced Coalbed Methane Test in a Stacked Coal Reservoir, Buchanan County, Virginia, USA

    By S J. Schafrik, C Keles, C Schlosser, E S. Gilliland, A K. Louk, N S. Ripepi, S Keim, J Amante, E Diminick

    Three legacy coalbed methane production wells have been converted to injection wells for a one-year carbon dioxide (CO2) injection test to evaluate the potential for CO2 storage in the coal reservoir

    Nov 4, 2015

  • AUSIMM
    Olympic Dam open stope observations, tactics and characterisation

    By G Capes, L Morizzi, N Mitkas, E Jones, D Grant

    This paper describes the mining setting for the sub-level open stoping (SLOS) mining method used at Olympic Dam (OD), and investigates the range of stope performance conditions encountered over 30 yea

    Mar 15, 2021

  • AUSIMM
    Modification of Some Failure Criteria for Rock and Coal

    By V S. Vutukuri, K Shariar

    This paper present a modification of selected strength criteria for coal and rocks containing weakness planes. The three strength criteria, namely, Murrell (1965), Bieniawski (1974a, 1983) and Hoek a

    Jan 1, 1999

  • AUSIMM
    Evaluation of the impact of modifying froth launders in an industrial flotation bank using novel flotation models

    By A Yáñez, P Vallejos, R Grau, J Yianatos

    In flotation cells, especially in large flotation units, froth management is a crucial variable that should be considered during the design phase or optimised to improve the performance of existing fl

    Aug 24, 2022

  • AUSIMM
    An Overview of Geotechnical Issues in Narrow Vein Mining

    By M P. Sandy, J B. Albrecht

    "Narrow vein mining can be loosely defined as mining operations involving orebodies with a true thickness of less than 4 m. Some authors have limited the term to steeper-dipping orebodies where the or

    Mar 26, 2012

  • AUSIMM
    Assessing Erosion and Run-Off Performance of a Trial Rehabilitated Mining Landform

    By G Hancock, J Lowry, W D. Erskine, D Jones, T Coulthard, M J. Saynor, P Lu

    An 8 ha trial landform was constructed in late 2009 at the Ranger Uranium Mine, located 250 km east of Darwin in the wet-dry monsoonal tropics of northern Australia. The objective of the trial, which

    Jul 10, 2012

  • AUSIMM
    The Use of Glass-Fibre Reinforced Plastic on the Northern Sewerage Project Stage 1 – Design and Construction Considerations

    By S Goff

    The Northern Sewerage Project (NSP) is a $650 M infrastructure project that will increase the capacity of the sewerage system for Melbourne’s growing northern suburbs while also helping to protect the

    Mar 8, 2011

  • AUSIMM
    Lighting up the dark – the use of 3D seismic to optimise mine plans at structurally complex Blackwater mine

    By N Pranoto, E Lawell, T Dean, M Grant

    The Goonyella Riverside Mine is located 30 km north of Moranbah in Central Queensland, Australia. Recent mining activities have exposed the north–south striking Kenya and Zimbabwe thrust Faults. These

    Mar 22, 2022

  • AUSIMM
    Admixture use in cemented rock fill

    By B Roache, J O’Brien, M Gray

    Admixture use in cement products is commonplace in the construction and mining industries. Many Australian mines have an operational concrete batch plant and stock hydration control and water reducing

    Nov 29, 2022

  • AUSIMM
    Strategic short-term geotechnical design

    By K T. Mandisodza, T J. Cartledge

    The principal objective of Geotechnical Engineers supporting operating mines is to provide safe working conditions and ensure that pit designs are geotechnically optimised to site conditions and pre-d

    Jun 22, 2022

  • AUSIMM
    Project Development and Regulation Red Tape – A Comparative Analysis: Does It Need to Be So Complex?

    By C Pope, M Tannock

    Mining exploration and development projects in Australia are being negatively affected by the highly complex regulatory and bureaucratic processes at all levels of government. These processes affect m

    Jul 13, 2015

  • AUSIMM
    OMEN - An Approach to the Optimisation of Methane Drainage Systems

    By Schofield D, Denby B, Stout F, Moli A

    This paper documents the development of a user-friendly computational program, which has been constructed to assist the mine ventilation engineer in the optimal design and operation of methane drain

    Jan 1, 1995

  • AUSIMM
    Ranger - The 5 Star Mine

    By Resta S. A

    Energy Resources of Australia Ltd - Ranger Mine is located about 255 kilometres east of Darwin in the Alligator Rivers Region of the Northern Territory. The Ranger project is surrounded by Kakadu Na

    Jan 1, 1994

  • AUSIMM
    Investigation on Collector Optimisation in the Reverse – Iron Ore Flotation

    By M S. Cassola

    It’s expected that the world economy will face a stable and continuous growth in the demand of iron ore, reaching more than two billion tonnes per year within the next year. After decades exploiting r

    Jul 11, 2011

  • AUSIMM
    Vibration Reduction to Presere the Integrity of an Aboriginal Rock Shelter Near Blast Operations

    By D P. Blair

    Rio Tinto’s Hope Downs Operations are currently mining iron ore in their South Central Pit. Prior to the commencement of mine operations, Hope Downs carried out an extensive archaeological investigati

    Nov 8, 2011

  • AUSIMM
    Safety of a Tailings Storage Facility against Dam Instability

    By D Veneziano, J Van Dyck, R Snow, W Pytel, O Zanoli

    Best practice standards generally recommend assessment of the environmental and societal risks posed by tailings storage facilities, but they rarely specify how the analysis should be made. As a case

    Jul 27, 2015