Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Minimising Blast Damage to the Extraction Level of Northparkes Mine's E26 Block CaveOptimal drill and blast design is a process often neglected by many underground hard rock mines. This is even more important to the new mine where ring designs need to be implemented and refined in
Jan 1, 1995
-
Reverse stoping using wireless initiation at CSA MineBy B Small
CSA Mine, named after the nationalities of the mines first owners being Cornish, Scottish, Australian, is one of Australia’s deepest and highest-grade copper mines. A combination of the modified Avoca
Mar 29, 2023
-
Modular SAG mill discharge trommel for maintenance flexibility and performanceBy K Katov, S T. Ciutina, J D. Pyke
The development and optimisation of mill discharge trommels, and specifically their screen panels, can be a neglected area in the complex operation of a minerals processing plant. Trommels are often s
Aug 29, 2018
-
Optimisation of an Image Analytical System for Bulk Materials Using the Theory of SamplingBy K H. Esbensen
Optimisation of a real-time at-line monitoring system for control of industrial granule coating quality is presented. The system is based on a fluorescence imaging system, because fluorescence origina
Jan 1, 2005
-
Deployment of Self - Contained Self Rescuers in Coal MinesBy Baafi EY, Sun Y, Tague I
Field trials at three New South Wales and one Queensland coal mines were carried out to gather data on oxygen "run out" times of Self-Contained Self Rescuers (SCSRs), time taken to escape from the min
Jan 1, 1998
-
Tailings governanceBy T Alexieva
Since the early 1900s the geotechnical community has investigated every significant failure of a tailings dam, improved our knowledge of the behaviour of the tailings storage facilities, developed ana
Jul 23, 2018
-
Inferred Mineral Resources and Gold Veins - Discussion and Case StudiesClassification within the Inferred Resource category is based on geological judgement and the balance of extrapolation versus interpolation that the Competent Person is prepared to accept. These resou
Jan 1, 2006
-
Selection of an Optimum Truck and Shovel Fleet Based on Effective Flat Haul and Capacity Constraint ModellingBy P Hagan, S Campbell
A study was undertaken using various methodologies to determine the optimum loading and hauling configuration for different haul routes at Callide Mine, a coal mine located in central Queensland. The
Sep 18, 2012
-
Behaviour-based Safety with a Foreign-based WorkforceBy R Brown
The Singapore Land Transport Authority Contract C917A is for the design, construction and completion of all outstanding works under the original Contract 917, including taking over the design and cons
Sep 17, 2014
-
Development of mine operation value chain flowsheets fine-tuned and constraint based on the process information (PI) data to evaluate proposed operation strategies and ore pre-treatment technologiesBy E Amini, N Beaton
Application of ore pre-treatment technologies such as Grade Engineering and in-pit ore treatment require comprehensive analysis to show proven value is being generated by switching away from the curre
Nov 10, 2020
-
Ethics in the Minerals IndustryBy L Brodie-Hally
In the early-1990s, Tad Golosinski, the former the head of mining department at WASM participated in a review mining engineering courses in Australia. The review team asked various industry executives
Jan 1, 2002
-
Stacking And Reclaiming Facilities At The Thiess Bros. PTY. LTD., South Blackwater Coal Mine From Conception To Operation (51496ec7-c204-47bc-8733-52538534c7c3)By Hoskings R
Conceptual studies of the run of mine stockpiling and reclaiming requirements com- menced in 1975. Final selection of equipment was made in 1978 and the equipment was commissioned in June, 1979. Equ
Jan 1, 1980
-
The Influence of Impurities on the Properties of LeadFrom time to time failures occur in structures made of lead, and the failure may be due to corrosion involving a definite thinning of the lead sheet, or it may be of such a nature that cracks develop
Jan 1, 1932
-
An Investigation of the Corrosive Impact of Groundwater on Rock Bolts in Underground CoalminesBy P Craig, A Crosky, P C. Hagan, E Elias, B Hebblewhite, S Saydam, D Vandermaat
"Premature failure of rock bolts has been recorded at twelve underground coalmines over the past 15 years in Australia. Over the last four years, UNSW Australia has been conducting an Australian Resea
Nov 5, 2014
-
Using Scenarios to Investigate the Long-term Future of Copper Mining and Guide Exploration Targeting StrategiesBy J P. Sykes, A Trench
"The common-held view of the future of copper mining is one of declining quality of mineral resources and increasingly limited long-term development options. This decline, in turn, is viewed as inevit
Jun 22, 2016
-
PIMS ù The Road to Efficient, Cost-Effective Plant OperationBy D Hunter
A production information management system (PIMS) was recently implemented at Queensland NickelÆs Yabulu Refinery. Although a strong business case was developed to justify the significant investment i
Jan 1, 2003
-
The Behaviour of Barium, Strontium, Aluminium, Chromium and Molybdenum when Leaching Fly Ash with Acid Rock DrainageBy M BSckstr÷m
Acid rock drainage (ARD), commonly found in vicinities of sulfidic mines, possess properties capable of widely affecting the surrounding environment by acidification and heavy metal pollution. In most
Jan 1, 2008
-
The Coolest Job There Ever WasI once read an æarticleÆ in FHM Magazine entitled æThe Coolest Jobs There Ever WasÆ. It was about a group of guys who were pursuing careers that any person on the planet would just kill for. I distinc
Jan 1, 2005
-
Tailings process optimisation through automation and controls integrationBy R Williams, M Baxter, D Zink, R Cunningham
The purpose of this paper is to discuss the efficient operation of a tailings dewatering circuit comprising a thickener and filter press through proper control and automation. It is common to see thi
Jul 23, 2018
-
Project Sustainability Assessment - Matching Method to Enterprise SizeProject Sustainability Assessment - Matching Method to Enterprise Size Sustainable development requires managing natural resources, including minerals, in a way that is conducive to long-term wealth
Sep 13, 2010