Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Incorporating Cycle Time Dependency In Truck-Shovel ModelingBy A. Anani
The need to optimize surface mining operations has led to the use of discrete event simulation (DES) modeling of truck-shovel systems. Often, these models assume truck cycle times are independent and
Feb 27, 2013
-
Acid mine drainage prevention and control optionsBy N. Kuyucak
"Acid mine drainage (AMD) is one of the most significant environmental challenges facing the mining industry worldwide. It occurs as a result of natural oxidation of sulphide minerals contained in min
Jan 1, 2002
-
Environmental Costs (and benefits) of Planning and Developing Mines and QuarriesThe consideration of environmental constraints and issues is a fundamental component of all stages of planning, development, operation and decommissioning mining and quarrying projects. Provision n
Jan 1, 1990
-
History And Present Status Of Piles And Their Installation In The United States - Expanded From A Presentation At The Deep Foundations Institute Annual Meeting Williamsburg, Virginia, December 1982By Hal W. Hunt
Steel and concrete piles and power-actuated hammers have developed almost entirely within the past 100 years. Prior to that time, piles were mostly timber, driven with a drop hammer or a maul. The Eng
Jan 1, 1984
-
Probabilistic practical optimization of production scheduling for multi-element depositsOptimizing production scheduling in open pit mines is important for managing cash flows of mining operations. This paper describes a new, probabilistic, mixed integer programming (MIP) formulation whi
Jan 1, 2006
-
Design Of Drilled Shafts Supporting Sound WallsBy Ke Yang
Drilled shafts are widely adopted as the foundation for sound walls. However, there has been a lack of uniformity in design and analysis methods and design criteria, in terms of factor of safety again
Jan 1, 2007
-
Blast Optimization of Hard Ores at Phu Kham Open PitBy Wayne Rogers, Kell Monro, Arthur Pacunana
The Phu Kham Copper-Gold Operation (PKM) is a large-scale open pit mine located in northern Laos. It was developed and is operated by Phu Bia Mining Limited (PBM) a Lao-registered subsidiary company o
Jan 1, 2018
-
Driving And Testing Of 75 M Long H-Piles In Shanghai - 1 . SynopsisBy Lucien Weber
In the Shanghai area, the soil conditions are such that bearing piles have become an essential foundation part of the new highrise buildings. In order to reduce the settlements under the high working
Jan 1, 1987
-
IC 7413 Approval of Newly Developed Self-Contained Breathing Apparatus, Instructions in its Care and Use, and Training ProcedureBy G. W. Grove, E. E. Quenon
"INTRODUCTION During September, October, and November 1946 the Safety Division of the Bureau of Mines, off' the United States Department of the Interior, Pittsburgh, Pa., tested four new types of self
Jul 1, 1947
-
The Mineral Industry Of Other Countries Of The Near East - Afghanistan (bc272fcd-f72f-40aa-bda0-f1cd2fcb3cb9)By E. Shekarchi
A year after the Soviet Union invaded Afghanistan and replaced President Amin with their choice, President Karmal, Afghanistan remained in turmoil. In some respects, the political and economic situati
Jan 1, 1982
-
Innovative Technology for Optimised Thickening SedimentationInnovative Technology for Optimised Thickening Sedimentation
Sep 13, 2010
-
Flambeau And Ridgeway Mines – Lessons LearnedBy F. D. Fox
The Flambeau and Ridgeway Mines, both owned and operated by wholly owned subsidiaries of Kennecott Minerals Company, were located very close to populated areas having initial concerns about health, sa
Jan 1, 2003
-
Application Of Computer Programs For Rock Pressure ControlBy V. M. Shick
For practical purposes of the use of information resources in the field of geomechanics and mine surveying with accepted mining technology in mines, the authors have developed the packaged software pr
Jan 1, 1996
-
The True North orebody, Fairbanks District, AK: A distal Intrusion-related Au deposit. Kinross Gold CorporationBy P. W. Jensen
Gold deposits in Interior Alaska are commonly coincident in time and space with reduced, mid-Cretaceous granitoids. The True North deposit of the Fairbanks district is several km from such granitoids,
May 1, 2003
-
Keynote Address: Population And Poverty, Energy And Technology: Coal, Mining And A Proper Start For The CenturyBy R. L. Lawson
I?ve been asked to appraise the global role of coal and mining, and the best place I can think of to begin is with the World watch Institute, which purports to monitor all things global. Last fall the
Jan 1, 2001
-
Technical Note: The Palabora High Reach Rig - IntroductionBy D. P. Penswick
The Palabora open pit is scheduled to cease operations in 2002. While the ore body continues below the bottom of the final pit shell, the stripping ratio precludes further economic open pit mining. Pa
Jan 1, 1997
-
RI 7130 Application Of Filiform Tungsten To Reinforce MetalsBy A. G. Starliper
The Bureau of Mines made laboratory investigations to determine the feasibility of utilizing fine tungsten wires to reinforce a number of nonferrous metals and alloys and a superalloy, S-8l6. The comp
Jan 1, 1968
-
The Dwight-Lloyd Blast Roasting Section for Sintering Lead Ores at The Broken Hill Associated Smelters Proprietary Limited, Port Pirie, South AustraliaThis Department handles all ores prior to blast-furnacing, the object of the operations being to mix the lead-bearing material with fiuxes, eliminate sulphur from the mixture, and produce a homogeneou
Jan 1, 1937
-
IC 8174 Mining Methods And Costs, Deep Creek Zinc-Lead Mine, Goldfield Consolidated Mines Co., Stevens County, Wash.By Galen G. Waddell
The Deep Creek zinc and lead mine afforded an excellent example of a relatively small underground mine operation that approached the low mining costs of large, highly mechanized mines, An open stope m
Jan 1, 1963
-
The Geotechnical Input into the Mining Process at George Fisher South MineGeotechnical input is interwoven into the mining process at George Fisher South Mine from the planning and design of working areas to the closure of worked out areas and maintenance of life of mine an
Nov 25, 2010