Search Documents

  • NIOSH
    OFR-92-82 Feasibility Of Using Cemented Backfill In Active Underground Coal Mines To Prevent Subsidence

    By D. V. Gaffney

    This report presents the results of a three-phase investigation of the feasibility of using cemented coal waste in active underground coal mines to prevent mine subsidence. Coal caste was broadly defi

    Jan 1, 1981

  • IIMP
    Benchmarking : La Comunidad Minera Virtual, un concepto hecho realidad

    By Fernando Cillóniz

    Benchmarking es un proceso de comparación y medición de los procesos de negocio de una organización, con aquellos que lideran el mercado. De forma que se obtiene información para mejorar el desempeño

    Aug 25, 2002

  • AIME
    Reservoir Engineering - General - Three-Phase Reservoir Simulation

    By E. H. Herron, J. H. Perry

    Mathematical simulation of reservoir behavior may be used to help understand reservoir processes and to predict reservoir behavior, thereby leading to the most economically desirable form of exploitat

    Jan 1, 1970

  • SAIMM
    Reconstruction time of a mine through reliability analysis and genetic algorithms - Synopsis

    By M. Kumral

    A mining system consists of many sub-systems such as drilling, blasting, loading, hauling, ventilation, hoisting and supporting. During mining operation, these sub-systems may experience various probl

    Jan 1, 2009

  • SAIMM
    Bateman Mega DMS Modules- Successes And Challenges - Introduction

    By N September, R Abate

    Bateman Modular (previously Van Eck and Lurie) has been building and supplying the mining industry with modular DMS plants for the last 30 years. These DMS modules range in capacity from 1 tph to 200

    Jan 1, 2006

  • NIOSH
    RI 5263 Estimate Of Known Recoverable Reserves And The Preparation Characteristics Of Coking Coal In Hamilton County, Tenn. ? Conclusions ? Reserves

    By Robert E. Hershey

    1. Estimates of reserves were made for three coal beds in Hamilton County the - Lantana, Sewanee, and Richland. Nine coal beds have been mined at one time or another in the county, but not enough info

    Jan 1, 1956

  • CIM
    Slurry Pump and Pipeline Performance Testing at the Georgia Iron Works Hydraulic Laboratory

    By G. R. Addie

    "In February, 1975, the President of Georgia Iron Works Company, Mr. Tom Hagler decided to build a new hydraulic laboratory to water performance test all of the companies' centrifugal slurry pumps.Equ

    Jan 1, 1980

  • DFI
    Soil Improvement Using Soil Mixing – An Alternative Way for the Indian Market

    By Franz-Werner Gerressen

    "The use of soil improvement to utilize areas, which are not suitable for foundation purpose, has a long tradition. Due to the increasing demand of foundation works in areas of unsuitable soils, the i

    Jan 1, 2017

  • SAIMM
    Metallurgy From Above ? A Google Earth Perspective

    By Q. C. Reynolds

    Keywords: Pyrometallurgy, plant, photography, GIS, satellite images, Google Earth Google Earth is a piece of software able to display an interactive three-dimensional map of the world, combining a

    Jan 1, 2006

  • AUSIMM
    Features of the New Lead Refinery at Port Pirie

    A new lead refinery with a capacity of 230,000 tons per year commenced operation at Port Pirie in October, 1959. This plant superseded the refinery which had operated from 1933 with the advent of the

    Jan 1, 1963

  • DFI
    Bearing Capacity And Slope Instability Solved By Novel Ground Engineering Solutions

    By T. J. Snell

    Bolnore Village in Haywards Heath, Sussex, England, is a large development covering 8 to 10 hectares and expected to provide 1500 homes in five phases to assist in the continuing demand for new homes

    Jan 1, 2006

  • AUSIMM
    The Influence of Composition on the Properties of Lead Part VIII

    By Orr C. W

    Continuing the systematic investigation of the influence of elements on the properties of lead(1). If the effects of additions of copper (up to 0.3%) on Port Pirie lead have now been determined in so

    Jan 1, 1938

  • CIM
    Meeting Recruiting Challenges - Victor Project

    Project Schedule ?Construction 2005 ?2008 (3 years) ?Operations mid 2008 ?2020 (12 years) ?Closure 2020 ?2023 (3 years) ?Post-closure monitoring Victor Economic Facts ?$982 million investment;

    May 1, 2006

  • SAIMM
    Ore Pass Rehabilitation - Case Studies From Impala Platinum Limited

    By L. J. Gardner

    Ore pass systems play a critical role in moving broken rock from the workplace to surface, and the integrity of the ore pass excavations is crucial. Over the life of the mine, ore pass integrity deter

    Jan 1, 2006

  • SAIMM
    Evaluation Of A Limit Equilibrium Model To Simulate Crush Pillar Behaviour - Synopsis

    By M. du Plessis

    This paper describes the evaluation of a limit equilibrium model to simulate the behaviour of crush pillars in platinum mines. An analytical model was derived to calculate the residual average pillar

    Jan 1, 2011

  • SME
    Laboratory And Field Evaluation Of Dust Collector Bags For Reducing Dust Exposure Of Roof Bolter Operators (77cf6e87-f7a5-4d47-85c2-324b471775be)

    The National Institute for Occupational Safety and Health conducted laboratory and field tests to evaluate the effectiveness of dust collector bags for reducing dust liberation and operator exposure f

    Jan 1, 2008

  • ISEE
    Top Hammer Drilling-The Way Things Work

    By William D. Hissem

    For those blasthole applications which require the use of holes ranging from 1” to 5.5” in diameter, the use of top hammer drills has been the equipment of choice for several generations of drillers.

    Jan 1, 1998

  • AIME
    Design Of Permanent Block Stopping To Resist Strata Convergence

    By R. E. Ray, J. W. Stevenson, J. A. Berry

    Conventional concrete block plastered with a cementitious coating is the most common material used in the construction of permanent stoppings to direct airflow in underground mines in the US. All mine

    Jan 1, 1986

  • SME
    Eddy-Current Separator Technology As A Novel Approach To Alaskan Placer Gold Recovery

    By D. A. Norrgran, J. A. Wernham, D. E. Walsh

    A qualitative test program was sponsored jointly by the University of Alaska and Eriez Magnetics, in order to study placer gold nugget recovery using an eddy-current separator. Various gold nuggets f

    Jan 1, 2003

  • AIME
    List of Meetings (7fb93f0b-7355-4439-a3e6-4daa54538de3)

    LIST OF THE MEETINGS OF THE INSTITUTE AND THEIR LOCALITIES FROM ITS ORGANIZATION Transactions Number Place Date Vol Page 1 Wilkes-Barre, Pa May, ?71 1 3 2 Bethlehem, Pa August, ?71 1 10 3 Troy

    Jan 1, 1923