Search Documents

  • SME
    Gathering And Managing Environmental Quality Data For Mining Projects - Preprint 09-005

    By D. W. Rich

    An environmental management system (EMS) is a key part of a company?s environmental stewardship. Procedures and practices to continually improve environmental performance can provide great benefits in

    Jan 1, 2009

  • SAIMM
    Recent Developments In The Automation Of Mining Analytical Laboratories For Base Metal Analysis - 1.0 Introduction

    By P. K. Hofmeyr

    Base Metal (Cu, Ni, Mo, Zn, Co etc.) analysis traditionally has been very slow in conventional analytical laboratories which can lead to additional costs being incurred in waiting time of drill rigs o

    Jan 1, 2005

  • DFI
    Float-In Cofferdams

    By Robert B. Bittner

    Large diameter piles (2 to 3 m diameter, both driven and drilled) are being used more frequently by designers of bridge foundations. The use of these large piles allows the pile cap to be positioned

    Jan 1, 2013

  • AUSIMM
    Geometric Control for Strategic Mine Planning at El Teniente Mine

    By J Cornejo, A Pinochet, C Caviedes

    The ore extraction rate and the incorporation of new areas are key operational parameters. In massive deposits mined by caving techniques they both control the cave back geometry, which is mostly resp

    May 9, 2016

  • NIOSH
    Review Of The Mineral Industries (Metals And Nonmetals Except Fuels) (8111a13c-5fba-46f4-ad27-90a538b86049)

    By Kung-Lee Wang

    SUSTAINED growth characterized the U.S. economy in 1964. Many new peaks were achieved in production, sales, employment, employee earnings, and business profits. At the end of 1964, the economy had exp

    Jan 1, 1965

  • AUSIMM
    Kinetics of the Gaseous Reduction of Hematite

    The widely accepted kinetic model for the gaseous reduction of hematite is critically examined. The formation of the wustite layer during internal reduction cannot be explained in terms of solid-state

    Jan 1, 1964

  • SME
    Impacts of Geotechnical Issues on Design of the Beacon Hill Tunnel and Station Project

    By Michael S. Kucker, Stuart Warren, Robert A. Robinson, Michael J. Lehnen, David McAllister

    Geotechnical conditions exposed by the phased exploration programs have had a major impact on the selection of excavation and support methods, dewatering requirements, size of openings, vertical align

    Jan 1, 2005

  • ISEE
    Algorithms for Adaptive Solutions: Essential Tools for Operational Blast Optimization

    By Sushil Bhandari, Amit Bhandari

    Blast optimization in open-pit operations is a task that often remains at a theoretical stage. Indeed, when it comes to operational blast design and onsite implementation, time restrictions and field

    Jan 1, 2019

  • NIOSH
    IC 8208 Loading And Transportation At Zinc-Lead Mines, The Eagle-Picher Co., Jo Daviess County, Ill. And Lafayetie County, Wis.

    By William A. Beck

    This report describes the loading and transportation practices employed at the zinc-lead mines of The Eagle-Picher Co., Jo Daviess County, Ill., and Lafayette County, Wis. The report also gives a brie

    Jan 1, 1964

  • NIOSH
    EM Rescue (Location) System For Deep Mines Phase II - Build And Test Breadboard Equipment

    By I. D. Schleicher, L. H. Rorden, F. B. Curry, T. C. Moore

    The purpose of this program is to extend electromagnetic (EM) techniques for use in locating miners trapped in mines as deep as 1000 m. A previously developed EM system is considered adequate for use

  • AUSIMM
    The History of Ore Treatment Processes in Broken Hill

    WHEN mining and treatment first started at Broken Hill only oxidised ores were available. These ores were rich in silver and lead-the silver mainly existing as chloride and the lead as carbonate.Treat

    Jan 1, 1928

  • AIME
    Drilling - Equipment, Methods and Materials - A Laboratory Investigation of Borehole Stability

    By H. C. H. Darley

    The principal causes of unstable boreholes* have been known for many years. For example, in a paper published in 1938, Halbouty and Kaldenbachl listed nearly all the classes of troublesome shales that

    Jan 1, 1970

  • CIM
    Andritz Metals Spray-Roast Acid Regeneration Pilot Plant

    By S. K. Mitterecker, T. Hofbauer, F. Baerhold

    "Acid regeneration is a very important process step in each acid leach circuit. It is required to recover dissolved metals and HCl from spent leaching acid. Andritz Metals presents its recently commis

    Jan 1, 2016

  • TMS
    Application Study on Technology of Reducing Copper Content in Discarded Slag

    By Zhi-xiang Cui

    Effects of flux, vulcanizing agent and reductant on slag cleaning in new-type slag cleaning furnace (Φ3.6 × 8.1 m) were investigated under the conditions including smelting temperature of 1200 and 125

  • CIM
    Development of Processing Alternatives for Frankfield East Deposit Using Selective Arsenopyrite-Pyrite Flotation

    By R. Jackman, D. Koningen, G. Wilcox

    "Gowest Gold Ltd. is in the process of developing the Frankfield East gold deposit located along the largely undeveloped Pipestone fault northeast of Timmins, Ontario. In addition to resource developm

    Jan 1, 2012

  • DFI
    Influence Of Urbanization And Geology On Deep Foundation Design And Construction

    By Hiren J. Shah

    The urban environment and geology create unique challenges for design and construction of deep foundations. The effect of these is prominently experienced in New York City. Three such project case his

    Jan 1, 2011

  • NIOSH
    Practical Application Of A Partial Cab To Reduce The A-Weighted Sound Level At The Operator’s Station On Surface Drill Rigs

    By D. K. Ingram, P. Jurovcik

    The National Institute for Occupational Safety and Health (NIOSH) identified hearing loss as the most common job-related disease in the United States in its 1996 National Occupational Research Agenda.

  • CIM
    Modelling and Design of Undercarrage Components of Large-Scale Earthmoving equipment in Tarsand Operations Part I?Dozer Applications

    OBJECTIVES ??REDUCE OPERATING COSTS ??INCREASE LIFE COMPONENTS ??EXTEND LIFE of THE DOZER ??REDUCE MAINTENANCE COST ??REDUCE DOWNTIME ??IMPROVE DURABILITY & RELIABILITY ??IMPROVE BOLD JOINTS

    May 1, 2004

  • SME
    Improved Leaching Performance Of Chalcopyrite By Microbial Cultures Subjected To Mutation

    By J. Kang

    To obtain microbial cultures with the ability to efficiently leach copper ion from chalcopyrite, microbial samples from acid mine drainage sites were mixed and then subjected to mutation using sodium

    Jan 1, 2008

  • AUSIMM
    A Model Study of the BHP New Zealand Steel Ironmaking Melter

    By C Garlick, O Gregory, H Rogers, B I. Winters, Z C. Ye

    BHP New Zealand Steel produces iron from titaniferous ironsand by a direct reduction process comprising multihearth furnaces/rotary kilns/electric iron melters. The electric iron melter is a six-in-li

    Jan 1, 1995