Search Documents

  • AUSIMM
    Characterisation of Computer Printed Circuit Boards for Hazardous Properties and Beneficiation Studies

    Characterisation of Computer Printed Circuit Boards for Hazardous Properties and Beneficiation Studies

    Sep 13, 2010

  • SME
    Selecting and Using Large Walking Draglines for Deeper Overburden Stripping

    By N. B. Pundari

    Proper selection of large walking draglines, based on sound engineering principles and field experience, has not kept pace with the large capital expenditures needed to buy these stripping machines. T

    Jan 4, 1981

  • DFI
    Capacity Of Piles And Settlement Of Pile Foundations

    By M. Mets

    Pile foundations have been used in Estonia since the beginning of 1960's. To evaluate the capacity of piles nearly 2,500 pile tests and 1,800 pile loading tests Have been carried out. The pile fo

    Jan 1, 2000

  • SAIMM
    The Huntsman Approach to Flotation Frothers

    By Nobuzwe Makhotla, Sasha Boskovic, Steve Hearn

    "Mineral separation efficiency in flotation depends, to an extent, on the type of frother used. Huntsman develops and manufactures unique frothers which are suited for mineral processing applications.

    Jan 1, 2015

  • CIM
    Indexes of Mine Microseismic and their Application in Safety Assessment by Statistical Evaluation at Luomu Mine

    By J. Hu, F. Lin, R. Chen, F Peng, S. Yang, W. Yu

    "Microseismic monitoring technology has become one of the most effective method of mine ground pressure monitoring after decades of development. But safety assessment of mine ground pressure by using

    Jan 1, 2015

  • NIOSH
    IC 9223 Intrinsically Safe 5-V, 4-A Rechargeable Power Supply

    By John J. Sammarco

    The U.S. Bureau of Mines has developed a regulated, intrinsically safe, rechargeable power supply for portable electronic equipment for underground use. The regulated output is ideal for microprocesso

    Jan 1, 1989

  • SME
    Ventilation On Demand - Study For Room And Pillar Mining In Flat Seams

    By S. Noll

    Ventilation is an essential part of any underground mining operation. It provides fresh air for workers and machinery, keeps up an adequate mine climate and dilutes and dissipates noxious gases. Possi

    Feb 27, 2013

  • AUSIMM
    Case Study Comparison of Teleremote and Autonomous Assist Underground Loader Technology at the Kanowna Belle Mine

    By G B. Smith

    Barrick (Australia Pacific) Limited initiated a trial of Caterpillar’s Minegem autonomous loader technology in 2009 at the Kanowna Belle mine in Kalgoorlie. Autonomous loader technology offers the pot

    Mar 21, 2011

  • AIME
    Minerals Beneficiation - Countercurrent Decantation: When and Why

    By E. J. Roberts

    Hydrometallurgical operations and many processes in the chemical industry require the separation of dissolved material from solids. One of the decisions which has to be made in designing a plant for s

    Jan 1, 1961

  • AUSIMM
    The Processing of a Tantalite Ore and The Preparation of The Carbides of Tantalum and Columbium

    By Greenwood J. N

    This is the fourth paper in the series on Australian w,ar materials and the work was undertaken as part of the programme for producing hard carbides. It had been intended to determine the influence of

    Jan 1, 1943

  • NIOSH
    RI 4594 Petroleum-Engineering Study Of The New Hope Oil Field Franklin County, Tex.

    By Charles B. Carpenter

    The New Hope field was selected for study by; Bureau of lanes engineers because many problems met by, the operators during development and operation were unique to petroleum-engineering experience. So

    Jan 1, 1949

  • AUSIMM
    Managing Challenges Faced in the Brownfield Commissioning of an Ultra-Fine Hematite Processing Circuit at ArriumÆs Iron Duke Ore Beneficiation Plant

    By E Selvapandian, R Barr

    Arrium (previously OneSteel) initiated a desktop study into the performance of its hematite ore beneficiation plant in early 2010. The beneficiation plant utilises jig concentrators and spirals to upg

    Aug 12, 2013

  • NIOSH
    RI 6065 Factors Influencing The Design Of Hydraulic Backfill Systems (In Two Parts) 1. Friction-Head Losses Of Sand Slurries During Pipeline Transport ? Summary

    By William R. Wayment

    The objective of this investigation was to obtain data on friction-head losses of sand slurries during their transport in pipelines. The data ultimately will be used in designing hydraulic transport s

    Jan 1, 1962

  • SAIMM
    A Practical Application Of Geostatistical Methods To Quality And Mineral Reserve Modelling Of Cement Raw Materials ? Synopsis

    By T. Y. Yunsel

    Estimation techniques such as polygonal, triangular prism, trapezoid, isopach maps, and inverse distance methods are often used in ore or industrial minerals deposit evaluation. These techniques do no

    Jan 1, 2012

  • AUSIMM
    Development of a Theoretical Approach to The Heap Leaching of Copper Sulphide Ores

    Heap leaching of copper sulphide and oxide ores' has been conducted at Rum Jungle since the end of 1965.A review of operations was made and this led to an examination of some theoretical aspects

    Jan 1, 1969

  • NIOSH
    RI 7082 An Electrolytic Process For Separating Nickel And Cobalt

    By T. A. Sullivan

    Refining in a molten salt electrolyte was investigated as a means of recovering nickel containing less than 1 percent and preferably less than 0.2 percent cobalt from nickel products containing up to

    Jan 1, 1968

  • NIOSH
    OFR-41(1)-74 Trapped Miner Location And Communication System Development Program - Volume I - Development And Testing Of An Electromagnetic Location Systems ? Part I - Development And Testing Of A CW Electromagnetic Location System ? 1.0 Introduction

    By A. J. Farstad

    The principle objective of the research effort described herein was to identify as rapidly as possible a practical trapped miner location system. Much effort has been expended in the past on the devel

    Jan 1, 1973

  • AUSIMM
    Building and Calibration of a Geotechnical Model for Sublevel Open Stope Design at Olympic Dam

    By I Thin, L Morizzi, C Seymour, G Mungur

    Olympic Dam has been investigating mine design options for the South Mine Area (SMA), which will continue using the existing sublevel open stoping (SLOS) method. The SMA is an undeveloped mining area,

    May 9, 2016

  • NIOSH
    IC 8099 Use Of High-Speed Data Reduction And Processing In The Mineral Industry ? Summary And Introduction

    By Richard F. Hewlett

    The purpose of this Bureau of Mines paper is to provide the mineral industry with current information on high-speed data processing and to illustrate how some of these techniques can be applied to the

    Jan 1, 1962

  • CIM
    Explore the Future of Mining

    By Joe Shoemaker

    Automated Spot Generation ? No Operators below the Highwall ? No Operator Wear and Tear ? Reduced Swing Time ? Single and Double Sided Loading ? Minimized Bench Width

    Aug 1, 2013