Search Documents

  • NIOSH
  • AIME
    Brief History Of Metallurgical Practice In Cannon-Making With Particular Reference To The Cast-Iron Gun

    By Job Goostray

    IN THIS paper, as in so many other discussions of historical nature, there is little chance for original material and much has had to be rewritten from older papers, documents, accounts, reports, and

    Jan 3, 1925

  • SME
    Designing the Alaskan Way Tunnel to Withstand a 2,500-Year Earthquake

    By Gordon T. Clark, James R. Struthers, Celal Kirandag

    INTRODUCTION Project Background The Washington State Department of Transportation (WSDOT) hired the Seattle office of Parsons Brinckerhoff to lead a team of consultants to produce an Environ-men

    Jan 1, 2007

  • TMS
    High Aspect Ratio Nickel Structures Fabricated by Electrochemical Replication of Hydrofluoric Acid Etched Silicon

    By Xi Zhang

    A technique for fabricating free-standing, high-aspect-ratio porous and pillar-type Ni structures has been developed using wet Si processing. A wafer of (100) Si was initially etched in HF solution to

    Jan 1, 2006

  • ISEE
    Mine Blasting Safety in the USA---Progress and Technology Advancements

    By Harry: Lobb Verakis

    Mining operations have made tremendous strides in improving the safety of blasting as shown by the significant and continual decrease in fatalities and serious injuries. Advances in blasting technolog

    Jan 1, 2010

  • SME
    Characterization Of Hydrothermally Dried Low-Rank Coals – Preprint 97-75

    By O. Noirot, H. C. Owens, P. D. Rao, D. E. Walsh, J. R. Mokka

    Over a period of seven years (1989-1996) the Mineral Industry Research Laboratory (MIRL) University of Alaska Fairbanks, has investigated the effects of temperature, residence time, and particle size

    Feb 24, 1997

  • SAIMM
    Rapid Installation Of Support In A Partially Raise Bored Shaft Using Sky Jacks. ? Synopsis (80e0c6d7-bb8a-4f50-8633-f573ee75745a)

    By D. Strachan

    Installation of support in known poor ground intersections during reaming operations requires rapid access to stabilize the shaft wall and thus to prevent the loss of the shaft through scaling. This i

    Jan 1, 2009

  • AUSIMM
    Some Experiences and Recent Developments in Sintering Australian Iron Ores

    In common with general experience in the iron-making industry overseas, Australia has in recent years suffered a deterioration in the physical quality of her iron ores in their suitability as a direct

    Jan 1, 1957

  • NIOSH
    OFR-47(9)-83 Ecological Studies On The Revegetation Process Of Surface Coal Mined Areas In North Dakota - 9. Viability And Diversity Of The Seed Bank

    By Louis R. Iverson

    Analysis of seed numbers present in topsoils (a grazed area, an ungrazed area, and two stockpiles) indicated that seeds of the most prevalent colonizers (e.g., Kochia scoparla, Setaria virdis, and Sa

    Jan 1, 1982

  • DFI
    Drilled Piers In The Piedmont - Introduction

    By Stanley A. Schwartz

    In the Piedmont, heavily loaded structures are generally supported by either drilled piers or one of several pile types. The choice of drilled piers or piles is typically one of comparative costs. The

    Jan 1, 1988

  • SME
    Risk Management in Action—Controlling Difficult Ground by Innovation (dbc5f12b-b47f-4e14-bceb-0a19e2c07d89)

    By A. Moergeli

    The Swiss are currently building the world’s longest tunnel, the 35-mile long Gotthard Base Tunnel. At Sedrun, for the first time in tunneling, four Roadway Support Machines will drive through most di

    Jan 1, 2005

  • SAIMM
    Risk In Project Preparation - ?Determining The Project Needs And The Effects On The Management Strategy?

    By A. M. Clegg

    In general, overall experience has shown that the approach to the appointment of a project manager is given much attention, but little specific attention is given first to the risk associated with the

    Jan 1, 2005

  • IOM3
    Catalytic effects in CaO-enhanced reduction of copper sulphide: Cu2S-CaO-C system

    By M. Moinpour, Y. K. Rao

    The catalysed direct reduction of copper sulphide with carbon and lime was investigated in the range 850-1000 degrees C using Cu2S-CaO-C and Cu2S-4CaO-4C reaction mixtures. The effects of the catalyti

    Jul 1, 1991

  • SME
    Investigation of Stability of an Unconventional Water-Obstruction Gate Pillar with a Curved Boundary in Mining Inclined Ultra-Thick Coal Seams

    Because of complex geological environments, a number of coal reserves occur in inclined or dipping coal seams in certain parts of the world. Longwall top coal caving using split-level a singleentry pa

    Jan 7, 2020

  • CIM
    Industry Requirements for Introduction of Alternate Energies with Emphasis on Hydrogen Fuel Cells

    By Fred Delabbio

    There are presently several issues that the mining industry is facing, such as underground air quality, deep mining and green house gas emissions, which could be addressed by the application of altern

    May 1, 2007

  • SME-ICGCM
    New Era in Longwall Top Coal Caving Geomechanics

    By Abouzar Vakili

    Longwall Top Coal Caving (LTCC), as the most attractive method for thick coal seams, has been suffering from insufficient geomechanical understanding for the past few years. Cavability without doubt

    Jan 1, 2007

  • SAIMM
    Continuous improvement management for mining companies

    By M. Mikolás, L. Pomothy, K. Špakovská, M. Vanek

    "Enterprises are faced with increasing economic competition and managers are obliged to look for methods that will ensure a competitive edge in their companies’ markets. These methods include manageri

    Jan 1, 2015

  • AUSIMM
    Introducing HPGR quaternary crushers in a Russian magnetite operation – challenges and solutions

    By B C. Povey, K Lagutin, M Mryasov, V Noll

    The current Stoilensky magnetite concentrator comprises a three-stage crushing circuit followed by three stages of ball milling, grinding and concentration to produce a magnetite concentrate with 66.5

    Sep 11, 2017

  • AIME
    Meetings of the Institute (256b201a-7ae4-4510-8f2f-325f7125fab8)

    Trans No. Place Date Vol. 1. Wilkes-Barre, Pa' May, '71 1 2. Bethlehem, Pa Aug., '71 1 3. Troy, N. Y Nov., '71.. 1 4. Philadelphia, Pa Feb., '72.. 1 5. New York, N. Y.&

    Jan 1, 1928

  • NIOSH
    OFR-62-78 Automated Continuous Miner Preliminary Design - Section I - Introduction

    By K. C. McMahon

    This report is the result of the engineering efforts performed by the Mining Equipment Operations of FMC to develop methods of automating a continuous miner. This work was done as part of modification

    Jan 1, 1975