Search Documents

  • SAIMM
    An Investigation On Underground Transport Roads And Influence On Safety And Productivity At Khutala Colliery ? Synopsis

    By L. Lehasa

    The purpose of the project was to investigate the challenges faced by Khutala Colliery pertaining to underground road construction and maintenance. Furthermore the influence of these challenges on pro

    Jan 1, 2012

  • SAIMM
    Design and Positive Financial Impact of Crush Pillars on Mechanized Deep-Level Mining at South Deep Gold Mine

    By B. P. Watson

    Crush pillars have been incorporated into a mechanized, low-profile trackless system at South Deep Gold Mine. These pillars had to be designed to fail near the face and to ensure that pillar failure i

    Jan 1, 2014

  • SME
    Implications Of Recent NIOSH Tracer Gas Studies On Bleeder And Gob Gas Ventilation Design (57921107-e7df-446a-bf7b-f8e3f9ea0a90)

    By W. P. Diamond, S. L. Cario, F. Garcia, J. D. Byars, T. P. Mucho

    The National Institute for Occupational Safety and Health (NIOSH) has been conducting research at a Pittsburgh Coalbed longwall mine to evaluate and optimize bleeder ventilation and gob gas venthole l

    Jan 1, 2000

  • AUSIMM
    Drill Steel Sharpening Practice at Lake View and Star Gold Mine

    The drill steel' sharpening shop, which stands adjacent to the Chaffers shaft, is built to the dimensions of 110 ft. 9 in. by 58 ft. wide, and is air conditioned in order to maintain reasonable w

    Jan 1, 1941

  • SME
    Using An Integrated Model For Maintenance Strategy Selection Of Load-Haul-Dump Equipment

    By A. Yazadni-Chamzini

    Maintenance strategy selection plays a significant role in mining design. The nature of maintenance strategy selection is a complex multi-criteria decision making (MCDM) problem including both tangibl

    Jan 1, 2012

  • CIM
    Cyanide Recovery and Copper Removal from Gold Plant Effluents using Vitrokele™ - Pilot Plant Results

    By D. Kidby, A. Briggs

    "Vitrokele ™ is a synthetic adsorbent, using chelating groups on large polystyrene beads, developed in Canada over 7 years ago, and first commercialised in 1985 to recover noxious metals from plating

    Jan 1, 1992

  • AUSIMM
    A New Look at Mineral Maps and the Potential Relationships of Extracted Data to Mineral Processing Behaviours

    By R Berry, N Bonnici, K Nguyen, S G. Walters, M Kamenetsky, C L. Evans

    Mineral maps produced via optical and scanning electron microscope û mineral liberation analyser (SEM-MLA) automated mineral identification systems are being used to examine the relationships between

    Jan 1, 2008

  • SME
    Mining Review (8ea836c9-6346-4229-805b-5f63a4114d3f)

    Minerals contribute to the U.S. gross domestic prod-uct (GDP) at several levels?mining, processing and manufacturing finished products. In 2008, the estimated growth rate for the real GDP of the Unite

    Jan 1, 2009

  • CIM
    Application of Mass Blast Principle for Stope Blasting in Deep Mines

    ?? Intro ?? Mass blast principle ?? LaRonde evolution toward mass blast ?? Overview ?? Mining method ?? Longitudinal ?? LaRonde evolution (2002 to today) ?? Drill and blast design ?? Consumpti

    Feb 1, 2008

  • SAIMM
    Loading And Transport System At SMC - Optimization

    By M. M. D. S. Vemba

    Paper written on project work carried out in partial fulfilment of B.Sc. Eng (Mining Engineering) degree Engineering refers to the application of mathematics and other sciences to logically develop

    Jan 1, 2004

  • SME
    Determining The Amplitude Of Certainty For Empirical Rock Failure Criteria

    By K. Oraee

    The empirical rock failure criteria play an important role in predicting the mechanical behavior of rocks, since affecting parameters on the behavioral properties of rocks are complex and numerous. Us

    Jan 1, 2012

  • SME
    Estimating Site Closure Costs A Critical Tool For Reclamation Planning

    By T. Hawthorne, H. Barnes

    Homestake Mining Company has developed an estimating model, based on other closed projects, to audit and prepare new estimating plans. The results of recent closure audits reveal that the original bu

    Jan 1, 2000

  • NIOSH
    RI 8500 Preparation of Platinum-Palladium Flotation Concentrate From Stillwater Complex Ore

    By J. Bennetts

    As part of its mission to develop technology that will help increase the supply of critical and strategic minerals from domestic resources, the Bureau of Mines has investigated methods for beneficiati

    Jan 1, 1980

  • NIOSH
    RI 7576 Structural Deformation Of Green River Oil Shale As It Relates To In Situ Retorting

    By P. R. Tisot

    Structural response and/or deformation was determined for each of four different grade Green River oil shales (27.0-, 34.5-, 45.5-, and 63.5-gal/ton) as they were heated in an inert atmosphere, under

    Jan 1, 1971

  • CIM
    Towards Optimum Value in Underground Mine Scheduling

    By Bryan M. Maybee

    The scheduling of underground mining activities is a complex task, in particular because of the requirement to satisfy a large number of constraints. A Schedule Optimization Tool (SOT) for underground

    May 1, 2009

  • DFI
    New Piling System With Multi-Head Hammer Drill Capable Of Drilling Including 35,000 Psi Rock "Mach Drilling System" And Some Construction Examples - 1. Incentive Of Development

    By J. Nakayama

    For drilling large diameter holes for deep foundations, the common and distressing difficulty of long standing has been in coping with ground containing rocky formations and boulders. Where geological

    Jan 1, 1988

  • AUSIMM
    The Geology of the Golden Cross Orebody - Complex Veining and Evolving Mining Responses

    By W C. Cook, S J. Mathews, A H. Purvis

    The Golden Cross Gold Mine is located at the head of the Waite kauri Ri ver, 8 km northwest of Waihi near the southern end of the Coromandel Range. The mine produces gold and silver from epithermal ve

    Jan 1, 1993

  • SME
    Development Of A Tool To Predict Performance Of Debladed Main Fans At Henderson Mine

    By D. Loring, J. Almgren

    Climax Molybdenum Company’s Henderson Mine is a large panel caving molybdenum mine located about 43 miles west of Denver, Colorado. Three Joy M120-72-880 fans are installed in parallel on the No. 1 ex

    Jan 1, 2007

  • CIM
    Development of the Rainy River Gold Project and Processing Plant

    By Paolo Toscano, Dave Hall

    "This paper discusses the project history, process design and layout of the Rainy River Gold Project mill. The circuit consists of a 55 x 83 primary crusher, 15 MW SAG mill and 15 MW ball mill. Both m

    Jan 1, 2016

  • CIM
    Antiscalants for Calcium Scale Control in Gold Process Circuits

    By Brad Wells, Wayne Bull, Wayne Dickinson

    "Antiscalants were evaluated for control of calcium carbonate (CaCO3) in gold processing applications. Under severely supersaturated conditions, 100 percent inhibition was achieved with 30 ppm antisca

    Jan 1, 2014