Search Documents

  • DFI
    Value Engineering – Design Risk and Reward at Major Sport Arena Projects

    By Peter Faust, Jeremy Zorne, Timothy Siegel, Diane Fiorelli

    Professional sport venue construction follows a very simple rule. Once the decision has been made to move the team to a new place, construction shall begin immediately, so that not more than one or tw

    Jan 1, 2018

  • SME
    NAT Attendees Get A Glimpse Of The Future Of Underground Space Use

    In 1950, about a third of the world?s population lived in cities. That figure has steadily risen throughout the following decades. Now it is believed that about 60 percent of the estimated 8.1 billi

    Jan 1, 2008

  • AUSIMM
    A comparison of X-ray and electron-based analysis techniques for characterising the mineralogy and alumina distribution in iron ores

    By M I. Pownceby, C M. MacRae, A Torpy

    Electron probe microanalysis (EPMA) and quantitative X-ray diffraction (QXRD) techniques are capable of providing high-quality quantitative information regarding the phase mineralogy and distribution

    Jul 24, 2017

  • DFI
    Case History: Augered Cast-In-Place Piles For The Pittsburgh International Airport Midfield Terminal

    By Randy R. Huberty

    Although originally designed with deep foundations consisting of all driven steel H piles and drilled caissons, a unique application of Augered Cast-in-Place (ACIP) piles as an alternate design result

    Jan 1, 2001

  • AUSIMM
    A Few Observations on Mine Surveying and Surveying Instruments

    The principles of geometry and trigonometry are so continuously used by mining engineers for the purpose of accurately and intelligibly recording their measurements, that the writer is prompted to lay

  • AUSIMM
    Modelling the Effect of Gravity Gold

    A model has been developed as part of the AMIRA P420 Gold Processing Technology Project to simulate the recovery of gold by centrifugal gravity devices. The model (which is available online) uses the

    Aug 1, 2010

  • DFI
    Support Of Excavation System - Columbia Heights Metro Station Project - Washington, D.C. - Summary:

    By Robert W. Bergwall

    The $58,000,000.00 Columbia Heights Metro Station project (Section E3-a) forms a part of the Washington Metropolitan Area Transit Authority's (WMATA) Greenbelt Route - Green Line subway system. T

    Jan 1, 1997

  • AUSIMM
    Opening the Doorway to Self Management in the Mining Industry - The Reduced Site Surveillance Programme

    When the HSE Act was introduced in New Zealand in April 1993, one of the prime aims of the Government was to signal to the industry. The Government's recognition of the employer as the key person

    Jan 1, 1997

  • AIME
    Minerals Beneficiation - Magnetic Separation for Mesabi Magnetite Taconite

    By J. E. Forciea, O. E. Palasvirta, L. G. Hendrickson

    AH pilot and commercial plants working with Mesabi Range taconite employ wet magnetic separation. Progress is being made with a dry magnetic process, but this has not yet been applied to taconite exce

    Jan 1, 1959

  • SME
    The Application Of Geotechnical Monitoring To Stability Evaluation And Mine Design

    By H. Maleki

    In this paper, long-term measurements in five underground mines are presented to demonstrate how these measurements can be applied to stability evaluations and design of underground excavations. These

    Jan 1, 2002

  • NIOSH
    Effects Of Repeated Vibration Exposures In Muscle Tissue - Introduction

    By Claud Johnson, G. Roger Miller, Kristine M. Krajnak, Stacey Waugh, Oliver Wirth

    Workers exposed to vibrating hand tools are at risk of developing symptoms such as cold-induced vasospasms, loss of tactile sensitivity, and loss of grip strength in the fingers and hands. These symp

    Jan 6, 2006

  • SME
    A Dissolution Kinetic Model For Metal Powders A Case Of Varying Surface Area

    By Kenneth N. Han, Peter Nam-soo Kim

    A kinetic model for leaching of particulate metals in a batch system has been developed. The leaching mechanism has been analyzed by solving a series of ordinary differential equations relating hetero

    Jan 1, 2005

  • AUSIMM
    Evaluation of Crown Pillar Burst Potential in Cut-and-Fill Vein Mining

    By J M. Marwan, B Tang

    Strain-type rockbursts, or strainbursts, are characterised by a localised violent failure. Their cause is attributed primarily to the sudden release of strain energy, which accumulates in a volume of

    Jan 1, 2001

  • ISEE
    Positioning of Mobile Mining Equipment Using GPS Technology & Mining and Information, Defining the Need

    "AQUILA Mining Systems Ltd. is a Canadian company that designs and develops monitoring, control and navigation systems for the surface and underground mining industries. In 1992, AQUILA Mining Systems

    Jan 1, 1997

  • AUSIMM
    Trends in Mineral Dressing Research at Mount Morgan

    The purpose of this paper is to outline some aspects of the experimental worlr that has been carried out in the mineral dressing laboratory at M'ount. Morgan during recent years.The subject matte

    Jan 1, 1952

  • ISEE
    An Experimental Method for Producing a Micro-Particle Ammonium Nitrate (MP-AN)

    By Christopher Jon Preston

    This paper describes a type of ammonium nitrate (AN) produced in a patented experimental atomization/aerodynamic process. This AN exhibits outstanding properties for use as a main ingredient to a new

    Jan 1, 2015

  • AUSIMM
    Computer-Based Design of Open Cut Mines

    Three stages are involved in the complete design and evaluation of an open cut mine. These are:1. design of the optimu,m ultimate pit, and selectionof the optimum mill capacity,2. development of produ

    Jan 1, 1970

  • AUSIMM
    The Dugald River Zinc-Lead Deposit, Northwest Queensland, Australia

    By Johnson I. R, Muir M. D

    The Dugald River zinc-lead deposit is located 60 km northwest of Cloncurry. It was discovered prior to 1881, and since 1937, has been the subject of several drilling programmcs which have outlined a r

    Jan 1, 1982

  • SME
    Direct Pressure Alkaline Leaching of Scheelite Ores and Concentrates Mining, Metallurgy and Exploration (Springer)

    By António Fiúza, Anthony Danko, Patrícia Leitão, Aurora Futuro, Cristina Vila, Lurdes Dinis

    The average global recovery rates for processing scheelite ores by physical methods are normally in the range 50 to 70%, and it is problematic to attain a minimum grade of 60% WO3 in the concentrates

  • AUSIMM
    Application of Self-Cleaning, Fluidised-Bed Slurry Heat Exchangers: Processing of Laterite Ore Slurries for the Extraction of Nickel and Cobalt in High-Pressure-Acid-Leach (HPAL) Plants

    By B Crossley

    Self-cleaning fluidised bed heat exchangers have demonstrated unparalleled performance internationally for the implementation of indirect heat transfer in severely fouling fluid environments. Recent a

    Jan 1, 2004