Search Documents

  • AUSIMM
    Cyclometer Surveys

    FOR rapidly marking in geological and topographical features on parish plans, the author has used the Veeder cyclometer with very satisfactory results. A simple Veeder cyclometer, usually retailed at

    Jan 1, 1916

  • CIM
    The Shortage of Engineers -Are We Working on the Solution or Are We Part of the Problem?

    During the past decade, the miner-al industries have been faced with an increasing shortage of engineers. The point has now been reached where the shortage may be termed critical. This shortage may be

    Jan 1, 1965

  • SME
    Vendors Show Off Latest in Mining Technology at SME Exhibit

    By Georgene Renner, William R. Yernberg, Steve Kral

    ABB offers complete electrical revamps of mining shovels with ac or dc drives, drive control, frequency converters with insular gate bi-polar transistor technology, intelligent control packages and vi

    Jan 1, 2005

  • SME-ICGCM
    Numerical Analysis of Some Geotechnical Factors Influencing the Application of Longwall Top Coal Caving

    By Dao Hong Quang

    This paper describes the numerical analysis of some geotechnical factors influencing the application of Longwall Top Coal Caving (LTCC) method. The study was aimed at comparing the differences in stre

    Jan 1, 2008

  • CIM
    The Development of a Small-scale Test to Determine Work Index for High Pressure Grinding Rolls

    By Dave Bulled, Khiratt Husain

    "The use of High Pressure Grinding Rolls is gaining significant interest as a replacement for SAG milling in the comminution of hard rock ores because of the potential for reduced costs in terms of en

    Jan 1, 2008

  • SME
    Developments in real time personal diesel particulate monitoring in mines

    Diesel Particulate Matter (DPM) issues are very high profile currently in both Australian coal and metal mines and Australian states are generally moving to acknowledge and to broadly follow US 2008 f

    Jan 1, 2009

  • NIOSH
    RI 3188 A Study of Falls of Roof and Coal Mines in Mines of Lincoln County, Wyoming

    By H. Tomlinson

    "PURPOSE OF REPORTThe purpose of this report, which is the third of a. series on the coal mines of the Western States, is to give the findings of a study of the causes and methods of prevention of acc

    Sep 1, 1932

  • AUSIMM
    Electrum and Gold Fineness of Some Hauraki Epithermal Gold-Silver Deposits

    By G A. Challis, A B. Christiel

    Microprobe analyses of electrum grains in some Hauraki Au-Ag deposits indicate that gold fineness is in the range of 500 - 800 (50 - 80 per cent Au), but for most deposits the range is usually narrowe

    Jan 1, 1992

  • SAIMM
    Computational fluid dynamic modelling of two phase flow in a hydrocyclone - Synopsis

    By M. J. Leeuwner

    Computational fluid dynamic (CFD) modelling is used to research the complex flow structures that exist in a hydrocyclone. By simulation of a two phase (water and air) flow system, the internal flow an

    Jan 1, 2008

  • AUSIMM
    Geophysics in Mineral Exploration

    Interest in those physical properties of minerals which might be used to good effect in prospecting is not new. Early in the nineteenth century attempts were made in th'e Cornish mines to measure

    Jan 1, 1950

  • SME
    Managing Geologic Uncertainty in Pit Shell Optimization Using a Heuristic Algorithm and Stochastic Dominance Mining, Metallurgy and Exploration (444ce330-9c49-45a1-9758-2c54438ceb81)

    By · J. B. Boisvert, O. Leuangthong, T. Acorn

    Optimizing final pit limits for stochastic models provides access to geologic and economic uncertainty in the pit optimization stages of a mining project. This paper presents an approach for optimizin

  • SME
    Managing Geologic Uncertainty in Pit Shell Optimization Using a Heuristic Algorithm and Stochastic Dominance Mining, Metallurgy and Exploration

    By · J. B. Boisvert, O. Leuangthong, T. Acorn

    Optimizing final pit limits for stochastic models provides access to geologic and economic uncertainty in the pit optimization stages of a mining project. This paper presents an approach for optimizin

  • SME
    A New Computer Program For The Design Of Ventilation Emergency Plans ? Introduction

    By Rudolf E. Greuer

    It is undisputed that an interaction between mine fires and mine ventilation systems exists. The ventilation carries the poisonous and sometimes explosive combustion products, which constitute the gre

    Jan 1, 1980

  • CIM
    Rougher Flotation Improvements at P.T. Freeport Indonesia’s Grasberg Operation

    By Harry Siewert

    "The commissioning of the 4th concentrator (C4) at Freeport Indonesia in early 1998 increased total mill throughput from 130k to 230k tonnes per day. The C4 flowsheet consists of a single 38 ft diamet

    Jan 1, 2001

  • SAIMM
    Improving Cfd Analysis Of Dc Furnace Operation By Refining And Addition Of Transportation Phenomena Models

    By M. Shapiro, L. A. le Grange, B. Henning

    A paper was presented by Bateman Minerals and Metals at INFACONX (2004) describing a simplified Computational Fluid Dynamics (CFD) Model for predicting the temperature and velocity distributions in al

    Jan 1, 2007

  • SME
    The Modeling And Simulation Of Bucyrus Shovel, Part 1: Spacial Kinematics And Virtual Prototype Modeling - Preprint 09-122

    In this study, a 3D model of the shovel motion based multi-body system dynamics in the Automatic Dynamic Analysis of Mechanical Systems (ADAMS) environment was developed. The kinematics model of the s

    Jan 1, 2009

  • AUSIMM
    A Simple Coarse Batch Particle Sizer for Plant Use

    Using a cylindrical hydrocyclone with a long vortex finder as the separator, a batch sizer was developed for the fast comparative sizing of the coarse solids normally encountered in mineral pulps.Oper

    Jan 1, 1968

  • SME
    Tunneling Methods Under Low Cover Conditions

    By Terry M. Tilley, Gregory P. Sherry

    Purpose This is a unique project because the mining and tunneling industries have become highly mechanized and cannot normally accommodate a project where surface disturbance must be minimized or e

    Jan 1, 2005

  • ISEE
    Applied to a High Risk Case History

    By C Agreda

    The Cushion Blasting Technique applied to solve the high risk case history represented by a 10,704 TM rock locate at 120 M from the hydroelectrical plants of 350 KV each, is described, analyzed and di

    Jan 1, 2005

  • CIM
    Coarse Gold Recovery Using Flotation in a Fluidized Bed

    By Eric Bain Wasmund, Lance Christodoulou, Julio Jairo Carmona Franco, María Fernanda Castillo, Jose Concha

    "A number of technologies are in practice for selectively removing coarse gold from conventional grinding circuits. These circuits are often designed so that the grinding mill output is size classifie

    Jan 1, 2015