    Numerical Simulations of Jet Break-up Phenomena for the High Pressure Die Casting Process

    By Valerio Viti

    In High Pressure Die Casting a molten metal is injected through a thin gate into the cast cavity. High injection pressures and high gate velocities create atomization phenomena which can negatively af

    Jan 1, 2006

  • DFI
    The Challenges Of Construction In Karstic Limestone: Three Major Case Histories

    By Donald A. Bruce

    The construction of major structures in karstic limestone terrains poses difficult problems to designer and contractor alike. This reflects the inherent variability of such conditions, and also the si

    Jan 1, 2002

  • NIOSH
    RI 7915 Dielectric Constants and Dissipation Factors of Simulated Lunar Rocks

    By Russell E. Griffin

    Dielectric constants and dissipation factors were measured by the Bureau of Mines for 13 simulated lunar rocks over the 20-to 100-megahertz frequency range by means of the susceptance-variation method

    Jan 1, 1974

  • DFI
    Local Use And Design Of Augered, Cast-In-Place Piles In The Southern Piedmont Province ? Introduction

    By Geoffrey C. Hebner

    Augered, cast-in-place piles (ACIP) have become a very common foundation type in Atlanta and the Southern Piedmont Province as well as much of the United States in the past 20 years. Prior to the intr

    Jan 1, 2003

  • CIM
    Les Mines INMET Division Troilus - Objet: Extension de la vie des godets des excavatrices DEMAG.

    Les Mines Inmet ? La Division Troilus exploite une mine d?or à ciel ouvert depuis 1996 et produit un concentré de cuivre. La Division Troilus est localisée à 175 KM au nord de la ville de Chibougama

    Feb 1, 2008

  • AUSIMM
    The Economic Use of Compressed Air in the Elevation of Tailings

    A good deal of experimental work has been done from time to time on the application of compressed air to the elevation of wet pulp. On account of the flat nature of most of our mill sites elevation of

    Jan 1, 1901

  • CIM
    Flotation Process Optimization Using Outotec Frothcontrol Solution

    By M. Mononen, J. Huuskonen, M. Vauhkonen, J. Kourunen, A. Lehikoinen

    "A new approach to measure process conditions in flotation cells is presented. Real scale flotation cells in a Zinc circuit are imaged using Outotec LevelSense sensors based on electrical resistance t

    Jan 1, 2013

  • AIME
    New Trends in Mining Geology

    By George M. Fowler

    EVERY year it becomes more difficult to find new mining districts and new ore deposits. Nearly all of the important discoveries so far can be attributed to surface manifestations overlying the ore dep

    Jan 1, 1935

  • SME
    Modification and Enhanced Testing of Data Mining-Based Algorithm to Detect Subtle Errors in Temperature Sensors in Gold Stripping Circuit Mining, Metallurgy and Exploration (cca8e619-0fb1-422a-925d-6e04d2a067f5)

    By Eduardo Pimenta de Melo, Rambabu Pothina, Rajive Ganguli

    Sensors are everywhere in the mining industry, with sensor information being used to monitor and operate processes. Therefore, when sensor information is wrong, economic losses can occur. Unfortunatel

  • CIM
    On-Site Daily Mineralogy - SIDMIN Program

    By Fuzail Siddiqui

    "The SIDMIN program aims at filling the mineral processor’s need to know the deportment of ‘minerals of interest’ not just ‘elements of interest’ that pass through the processing plants. Generally, ch

    Jan 1, 2000

  • SME
    Carbon-in-Pulp Processing of Gold and Silver Ores - The Experts View the Problems

    What is the preferred electrolytic cell design and why? Hall: Considerable research remains to be done on electrolytic cell design. Studies are presently being conducted to determine optimum voltag

    Jan 10, 1981

  • AUSIMM
    Mining on Narrow Lodes

    THE object of this paper is to review certain features in connection with the mining of narrow lodes, say up to 20 ft. or so wide. The types of ore-body to which it is intended to refer are those whic

    Jan 1, 1912

  • TMS
    A Thermodynamic Model For The Reaction Zone Of Lead Blast Furnace

    By Pengfu Tan

    A thermodynamic model has been developed to predict the distribution behaviors of Cu, Fe, S, O, Pb, Zn, As, and heat balance in a lead blast furnace. The modeling results have been validated by the pl

    Jan 1, 2005

  • AUSIMM
    Remediation of Mine Seepage at Batu Hijau

    Remediation of Mine Seepage at Batu Hijau

    Sep 13, 2010

  • NIOSH
    Review Of Mining Technology (1dc40e31-63f9-4092-a148-2e045745fedc)

    By James E. Hill

    Tremendous improvements in mining technology have been witnessed during the past 100 years. For example, before 1860 all blastholes were drilled manually and blasting was done with low-energy black-po

    Jan 1, 1966

  • NIOSH
    OFR-13-82 Engineering Property Changes And Environmental Effects On Coal Mines Wastes Due To Slaking

    Fresh coal refuse was sampled at 21 US mines. Five of the sites were drilled, sampled and tested more extensively. Field tests included Standard Penetration tests, and in-situ density determinations.

    Jan 1, 1981

  • CIM
    Design and Implementation of Advanced Automatic Control Strategy Based on Dynamic Models for High Capacity SAG Mill

    By Rodrigo Toro, Ivan Yutronic N

    "The Copper Concentrator Plant of Compañía Minera Doña Inés de Collahuasi (CMDIC) is composed of three grinding lines, the third one being the largest. Due to the capacity feature of the third line, s

    Jan 1, 2010

  • AUSIMM
    The Mining Licensing Regime - Current Developments

    By D A. Edmunds

    The most important development that has been taking place recently relating to mining operations in New Zealand would generally be regarded as being the Resource Management Law Reform. This has been w

    Jan 1, 1988

  • AUSIMM
    Geochemical Ore Guides and Techniques in Exploration for Tin (f197bab6-bf99-45ab-8d21-404dd026e852)

    Geochemical data on Australian granites and pegmatites, and the mineral components of these rocks, are compared with that obtained in similar studies in the U.S.S.R. and elsewhere.The geochemical char

    Jan 1, 1963

  • ISEE
    A Review of Rock Slope Development with Explosives Since the 1960's

    By Harry L. Siebert

    Pre-splitting was substituted for line drilling to achieve stable rock slopes and reduce excavation beyond the pay line on a Connecticut highway project in 1962-63. Changes have occurred in developing

    Jan 1, 1998