Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Estimation Of Long-Term Stability Of Mine Pillars In Underground Pit
By S. Yamashita
Recently in Japan, unexpected degradation (surface subsidence) at old underground quarry sites, such as 'Ohya-Ishi' (pumice tuff) pit field has often been occurred. At these quarry sites, th
Jan 1, 1996
-
Effects of Transverse Isotropy on Vertical Stresses When Multi?Seam Mining under Supercritical Longwall Panels
By Anastasia M. Suchowerska
The design of effective ground support requires a sound understanding of the pre-mining state of stress in the stratum to be mined. Irregularities in the stress field encountered during multiseam mini
Jan 1, 2012
-
Evaluation Of Tailgate Ground And Support Interaction In The Illinois Basin For The Development Of A Ground Reaction Curve Based Standing Support Design (b187e562-fd74-46c1-b2f9-93667db20030)
By Dennis Dolinar
Improperly designed support systems have led to unplanned roof falls in longwall tailgates. To prevent such falls requires appropriate support and adequately designed support systems. The National Ins
Jan 1, 2009
-
An Improved Technique of In-Situ Measurement Of Fracture Zones Surrounding Gateroads
By B. G. D. Smart
An understanding of the nature of yield zones surrounding coal mine excavations is fundamental to the design of mine support systems. Various methods have been designed for investigation of undergrou
Jan 1, 1984
-
Problems And Prospects Of Roof Bolting Development At Cuzbass Region Mines
By V. Eu. Anufriev
Despite of significant cost advantages and the positive expierence roof bolting is limited up to 15-20% of all workings at the Cuzbass mines. The low level of application of the technology is the re
Jan 1, 1996
-
Three-Seam Interaction: A Case Study
By N. P. Kripakov
Results of a complex three-seam interaction analysis in a western U.S. coal mine are presented. The physical situation simulated by the models represents the development of a set of entries underneath
Jan 1, 1996
-
A Simple Tool to Measure Stress in Mine Backfill
By A. MacG. Robertson
A cone penetrometer has been used to assess the level of stress existing in hydraulically placed mine backill. The test apparatus was fabricated at the mine and consisted of a steel cone, connector ro
Jan 1, 1986
-
Geomechanical Support Of Adaptive Mining Technology
By I. V. Baklashov
Geomechanical conditions of mining operation are determined by varying in time and space mechanical properties and initial state of the rock mass, by geological and technological factors. We define ad
Jan 1, 1996
-
Stress Variation on Longwall Powered Supports in Upper Seam due to the Presence of Old Mined Out Workings in Lower Seam
By Vedala Sastry
Longwall mining for coal extraction in deeper deposits is gaining momentum in India, due to the increasing stripping ratios and depletion of shallow deposits amenable for surface mining. In longwall
Jan 1, 2007
-
Rock Mechanics Property Data Bank For Coal Measure Strata
By G. C. Sun
Rock mechanics properties, i.e. uniaxial and triaxial compressive strength, indirect tensile strength shear strength, Young's modulus, and poisson's ratio were collected for coal and related
Jan 1, 1993
-
Field Test Results On Dyna-Rok And Dyna-Rok Plus Anchors
By James J. Scott
Research and development has been carried out on the patented Dynamic Rock Anchor, tradenamed DYNA-ROK and DYNA-ROK PLUS Anchors, which are manufactured and marketed by Ingersoll-Rand Company. This pa
Jan 1, 1990
-
Longwall Recovery At Bailey Mine - Ground Control Challenges And Solutions (963204bd-df7d-40f3-9bd2-496636477d24)
By Daniel Su
This paper describes recent ground control challenges encountered at the longwall recovery areas of one of Bailey Mine?s two longwall faces and the proactive measures taken by CONSOL management and en
Jan 1, 2009
-
New Era in Longwall Top Coal Caving Geomechanics
By Abouzar Vakili
Longwall Top Coal Caving (LTCC), as the most attractive method for thick coal seams, has been suffering from insufficient geomechanical understanding for the past few years. Cavability without doubt
Jan 1, 2007
-
Upgraded Comprehensive and Integrated Subsidence Prediction Model CISPM - W
By Yi Luo
In dealing with various subsidence cases, accurate predictions of mining induced subsidence are the basis for correct assessment of subsidence influences and subsequent mitigation efforts. There is a
Jan 1, 2008
-
New Laminated Displacement-Discontinuity Program: Fundamental Behavior
By Keith A. Heasley
In the past, numerous displacement-discontinuity (DD) models of stratified rock masses have been proposed using a homogeneous isotropic elastic overburden. In this paper, it is postulated that a lamin
Jan 1, 1996
-
Application Of A Polymer-Based Sealing Material To Prevent Roof From Weathering
By Peter Zhang
The immediate roof at the test site consisted of laminated clay shale that is likely to be susceptible to weathering. With seasonal dry-wet cycles in the mine ventilation air, the roof in the intake
Jan 1, 2009
-
Outburst Control in Underground Coal Mines,
By Floyd D. Varley
Outbursts, the sudden and violent out- pouring of material into mine openings, is a ground control problem increasingly encountered in the United States as deeper seams are developed. Outbursts, cause
Jan 1, 1986
-
Deriving Input Parameters for Numerical Modeling of Fully Resin Grouted Rock Bolts
By Michael Alber
Resin grouted rock bolts are the major support measure in coal mining. They are rather easy and foolproof to install, take immediately load and are the least time consuming support measure for control
Jan 1, 2006
-
Geotechnical Factors Influencing A Time-Dependent Deformation Mechanism Around An Entry In A Dipping Seam
By M. K. Larson
The U.S. Bureau of Mines and Cyprus Shoshone Coal Corp. conducted a study of deformation mechanisms in strata around a longwall gate road system at two sites in an underground coal mine near Ham, WY.
Jan 1, 1996
-
Pre-Driven Longwall Recovery Room Under Weak Roof Conditions ? Design, Evaluation, and Monitoring
By Peter (Yunqing) Zhang
Longwall recovery under weak roof conditions could have considerable delay if the immediate roof is weak and deteriorates during screening. A pre-driven longwall recovery room is a feasible solution
Jan 1, 2006