Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Project Delivery Models and Risk Allocation for Whole Life Tunnel Management
By D. Caiden, C. S. Covil, P. J. Chamley
The paper describes the background to alternative delivery models, drawing on international experience, and introduces Project Alliancing/Contract Partnering, common risks and risk sharing on tunnel p
Jan 1, 2005
-
Elm Road Generating Station Water Intake Tunnel
By Brendan Reilly, Jon Isaacson, Paul McDermott
Kenny/Shea JV is constructing the water intake tunnel for the new Elm Road Generating Station, a supercritical coal-fired power plant in Oak Creek, Wisconsin, being built by Bechtel Power Corporation.
Jan 1, 2007
-
The Characterization Of Frothers And Frother Blends Based On Dynamic Surface Tension Measurements
By B. Comley, M. C. Harris
There is as yet no accepted method of predicting flotation frother performance in plant processes based on laboratory scale characterisation techniques. This paper investigates the use of dynamic surf
Jan 1, 2001
-
Method To Evaluate Liberation Characteristics Of Feed In A Jigging Plant
By A. K. Mukherjee
The roles of pulsating mechanisms such as the amplitude and frequency of the jig cycle are well established in jigging. Also well established are the roles of the size ratio and the volume fraction of
Jan 1, 2008
-
Design-Build of the Lake Hodges to Olivenhain Pipeline Tunnel and Shaft
By Jon Y. Kaneshiro, Sean A. Menge, M. Luis Piek, Brian Barker
The Lake Hodges to Olivenhain Pipeline project is part of a 40-megawatt pumped storage project linking two reservoirs as part of the San Diego County Water Authority’s $939 million Emergency Storage P
Jan 1, 2007
-
Ground Control of Strip Backfilling Water Conservation Mining in Shallow Coal Seams
According to the classification of water conservation mining in shallow coal seams in China, when the ratio of the impermeable layer thickness to the mining height is less than 18, the mining belongs
Jan 7, 2020
-
Precious Metal Deposits Related to Alkaline Igneous Rocks – A Space-Time Trip Through the Cordillera
By Felix E. Mutschler
Alkaline rock-related precious metal deposits include: • orthomagmatic platinum group elements (PGE) ± gold (Au); • porphyry copper-silver-gold (Cu-Ag-Au, ±PGE); • epithermal Au-only, and Au-Ag-bas
Jan 1, 1991
-
Improving Truck-Shovel Energy Efficiency Through Discrete Event Modeling
By K. Awuah-Offei
Energy efficiency has become significant due to cost and environmental considerations. Comminution and material handling have been identified as the two most energy intensive processes in mining. The
Jan 1, 2012
-
Geotechnical And Structural Design Challenges Of The Fremont Central PARK Subway For The Bart WARM Springs Extension
By Mitchell L. Fong
The Bay Area Rapid Transit (BART) District will be extending BART service south along an 8.7-km (5.4-mile) -long corridor in the city of Fremont, California as part of the Warm Springs Extension (WSX)
-
Industrial Minerals 1986 - Barite, Bauxite and alumina
By R. J. Anderson, A. V. Castelli
In 1986, United States' barite production fell 48.9%, consumption - sold or used by grinding plants - was off 47.3%, and imports were down 63.8%. Meanwhile, world mine production decreased 29.6%,
Jan 5, 1987
-
Drainage Ph, Acid Production, And Acid Neutralization For Archean Greenstone Rock
By K. A. Lapakko, D. A. Antonson
Fourteen samples of pyrite-bearing Archean greenstone rock (d < 6.35 mm, 0.04% < St < 1.22%) were characterized (particle size, chemistry, mineralogy) and subjected to laboratory dissolution testing.
Jan 1, 2002
-
The Mine Safety And Health Act: Legislative, Policy, And Enforcement Initiatives Following The Upper Big Branch Explosion ? Introduction
By L. E. Beverage
In 2006, the Mine Improvement and New Emergency Response Act (?2006 MINER Act?), Pub. L. No. 109-236, 120 Stat. 493 (2006) was enacted in a bi-partisan move to strengthen the 1977 Mine Safety and Heal
Jan 1, 2011
-
Will Geophysical Technologies Return to U.S. Coal Fields?
By Lawrence M. Gochioco
One of the best kept technology secrets in U.S coalmining history involved a robust coal geophysics program used by a local coal company to detect and map various geologic anomalies and man-made struc
Jan 1, 2005
-
Risk Quantification in the Mineral Sector
By K. Bounou, K. Komnitsas
"Risk quantification may be used as a sustainable development index in the mining industry, since it encompasses both economic and social factors. In addition, it may assist in the development of a fr
Jan 1, 2005
-
Utilization of lignite fly ash as hydraulic binder and backfill material
By I. Gombköto, G. Földing, G. Mucsi, B. Csoke, J. Faitli, B. Kovács
This paper summarizes the main achievements of our previous project entitled "Development of a technological system producing quality guaranteed fly-ash based binder". Furthermore, this study deals wi
Jan 1, 2011
-
The Effect of Particles on Surface Tension and Flotation Froth Stability Mining, Metallurgy and Exploration
It is widely accepted that particles stabilise flotation froths and that stable froths result in improved flotation performance. Predicting the effect of particle addition on froth stability is, howev
-
Abstract Page - Site-Specific Prediction of Ground Vibrations Inducedby Blasting
By S. A. Shoop, J. J. K. Daemen
Site-specific blast vibration prediction can be more accurate than using a universal prediction equation. Vibrations from 37 blasts were monitored using three seismographs. Data analysis showed that s
Jan 3, 1985
-
Climate Change For Mine Planners: Some Fundamentals
By R. D. Williams
In spite of the increasingly polarized and politicized view of climate science and climate change in the United States, many of the principles behind the ?theory? of Anthropogenic Global Warming (AGW)
Feb 27, 2013
-
Tunneling for the Eastlink Project, Melbourne, Australia
By Peter Campi, Harry R. Asche, Ian P. Callow, Edmund G. Taylor, P. Scott Smith
The US$1,850 million EastLink project is a 39km tollway and includes twin 3-lane,1.5km long, undrained driven tunnels. The hard rock tunnels are being built to avoid passing the motorway through the M
Jan 1, 2007
-
Rewards and Frustrations of Female Mining Engineers
By Christy Z. Lueders
Introduction More and more women engineers are joining the traditionally male mining industry. Are they successful? Do they encounter special problems? How do men in mining respond? How can the minin
Jan 10, 1981