Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Construction Procedures And Equipment For Drop Shafts Metropolitan Sanitary District Of Greater ChicagoBy Joseph Lynch, John DiPonio
This report refers to the Chicago Deep Tunnel Contract 13A, which was the first contract let in the City of Chicago requiring the construction of deep drop shafts for the transportation of high level
Jan 1, 1997
-
Short-Term Mine Production Scheduling For Industrial Minerals Using Multi-Objective Simulated AnnealingBy M. Kumral
The in-situ mineral characteristics of a deposit are simulated by sequential co-simulation and averaging the simulated characteristics within specified block volumes creates a three-dimensional block
Jan 1, 2002
-
A Primer For Engineering And Technical Professionals Regarding Reclamation And Environmental Surety BondsBy W. T. Gorton
Bonds are required by state and federal law to address reclamation when the permittee defaults. Under various principles of law, a bonding company may propose to perform the obligations of the permit
Jan 1, 2003
-
Wenmec/Outokumpu Technology Update Of Current Developments For Anode Slime Precious Metals TreatmentBy Olli Järvinen
The precious metal refinery process is divided into the five process stages: 1 .copper/nickel leaching in autoclave 2. selenium roasting furnace 3. doré metal smelting furnace 4. silver electrolys
Jan 1, 1995
-
A Dynamic-Programming-Based Algorithm For Optimal Production Planning In Open Pit MinesBy D. D. Lei, H. Sevim
In a recently developed, long-term open pit production planning model, the optimal plan is found by exhaustively searching through nested pits of maximum metal contents. A more efficient, dynamic prog
Jan 1, 1995
-
Carrying capacity in a pilot flotation columnBy M. T. Ityokurnbul, M. P. Trubelja
Concentrate flow rates were measured for the flotation of -100-mesh Lower Kittaning coal in a computer-controlled 0.076 x 3.5-m pilot flotation column. The variables studied were recovery zone height,
Jan 1, 1999
-
Bench Scale Flotation of Sedimentary Phosphate Rock with Hydroxamic Acid CollectorsBy M. Li, J. D. Miller
It has been discovered that water insoluble alcoholic solutions of alkyl hydroxamic acids serve as selective collectors for the flotation of phosphate mineral resources (Miller et al., 2000). The effe
Jan 1, 2002
-
The Brenner Base TunnelBy Michael Rehbock-Sander, Romed Insam
"INTRODUCTIONThe idea of building a summit tunnel under the Brenner occurred to the Italian engineer Giovanni Qualizza as far back as 1847. But it was to be another 160 years to pass before a base tun
Jan 1, 2016
-
Time-Cost, Trade-Off Analyses Of Longwall Face TransfersBy E. Topuz, C. Patrick
Longwall face-to-face equipment transfers or moves are the largest source of nonproductive time in a long wall-mining system. Detailed planning and resourceful thinking are paramount for economical, s
Jan 1, 1996
-
Superconducting magnetic separator and its applications in mineral processingBy R. Houot, C. Leschevin, G. Gillet
In mineral processing, conventional magnetic separators are equipped with traditional magnetic circuits (magnetic iron yoke with copper coils or iron-clad solenoid) that develop magnetic fields of les
Jan 1, 1987
-
The Use Of Blending Piles At Riverside Cement Company ? IntroductionBy George C. Carter
It was just a little over three years ago that the "Go" button was pushed to start operations on the blending piles at Oro Grande. As is usual with any new installation, there were problems that had t
Jan 1, 1962
-
Design and Analysis of a Kind of Centralized Forced Flip-Flow ScreenBy Jida Wu, Zhenqian Wang, Chusheng Liu, Wenqiang Qiu, Mengqi Zou, Wei Zhao
During the dry screening, the hole plugging is a serious problem for most traditional screening equipment sieving the moist fine coal. It would lead to the low preparation efficiency and the low scree
Jan 1, 2017
-
The IMHOFLOT G-Cell– An Advanced Pneumatic Flotation Technology For The Recovery of Coal Slurry From ImpoundmentsBy R. M. Imhof, M. J. G. Battersby, J. V. Brown
There is a plethora of former industrial sites where coal mining operations have left large slurry impoundments. These contain raw washed fines, which have previously been too expensive to process to
Jan 1, 2003
-
IS0 Certification Helps Thiele KaolinBy Lee Ann Arrington-Webb
Thiele Kaolin Co. has invested much time and money in achieving and maintaining its IS0 9002 certification. Through a regimen of process control and documentation, routine audits and a commitment to q
Jan 1, 1997
-
5. Discovery of Bougainville, Papua New GuineaBy R. J. Cornelius
Gold with minor associated copper mineralization in the area of what is now the Bougainville porphyry copper deposit has been known since the 1920s and was probably known in German colonial times, pre
Jan 1, 1991
-
Evaluation of Ion Exchange Resins for the Extraction ofGold from Cyanide Leach SolutionsBy Patricio A. Riveros
Various types of commercial ion exchange resins were evaluated with respect to their ability to extract gold from cyanide leach solutions. Large differences were found among the various resins in term
Jan 1, 1990
-
A Systems Approach For Worker Needs Analysis In Training Program Development (ABSTRACT PAGE)By C. J. Bise
Safety training requirements differ from mine to mine due to changes in the demographic characteristics of the workers or changes in job and organizational characteristics. Accordingly, a microcompute
Jan 1, 1995
-
An Erector Transporter For The Installation And Removal Of Specialized Mining Equipment UndergroundBy J. H. LaVerne Palmer, W. (Bill) C. Cox, Lorant B. Geller
An erector transporter (ET) has been designed and built to lift, carry and erect heavy machinery components, in particular the components of a 7.6 m diameter tunnel boring machine (TBM), within the ac
Jan 1, 1985
-
A Contracting Strategy for Managing Risk on Subsurface Projects Delivered Using Design-BuildBy David Corkum, David Hatem
Subsurface construction projects are risky ventures and the decision to deliver a project using the Design-Build model does not eliminate those risks. Differing site conditions, inadequate design, and
Jan 1, 2003
-
On Microcomputer Monitoring System For Examining Reliability Of Fully Mechanized Mining Equipment - IntroductionBy Fang-tu Wei
The purpose of developing this system is to monitor the operating status of the fully mechanized mining system in order to raise it's reliability. The completely mechanized coal mining system
Jan 1, 1986