Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Diesel Emissions Control Strategies For The Use Of Diesel Engines In Underground Coal Mines – Preprint 97-144
By N. Paas
Diesel powered equipment has been operated in underground coal fir mare than 50 years. According to the Mine Safety and Health Administration (MSHA), there are approximately 3,000 diesel units operati
Feb 24, 1997
-
Maintaining Ring Gears in Ball Mills
By David Kress
Mill crushing drive systems are essential to cement producers. With the increased emphasis on operating efficiency, it is vital that these systems be dependable and reliable. No one needs the costs
Jan 1, 2000
-
Mineral Resource estimation for the Chatham Rock Phosphorite Project
By Ray Wood, Rene Sterk, Robin Falconer, Sean Aldrich, Simon Nielsen
"The Chatham Rock Phosphorite project is situated 450 km east of New Zealand at approximately 350 to 450 m water depth. The deposit occurs as a thin layer of phosphatebearing glauconitic sand at the s
Sep 1, 2014
-
Coal 1986 - Underground mining
Continued market pressure on the US coal industry was the overriding factor affecting developments in underground mining in 1986. An oversupply of coal in the spot market kept prices low throughout th
Jan 5, 1987
-
Mine Power Systems
By Christopher J. Bise
INTRODUCTION A mine's power system represents the driving force behind all of the extraction and auxiliary operations, because the production and transportation of mined material and the oper
Jan 1, 1986
-
Semi-Autogenous Grinding (SAG) Mill Liner Design And Development
By D. Royston
SAG mill liner development draws primarily on practical experience from SAG milling operations supported by computer-based modeling of charge motion in SAG mills and on established good design practic
Jan 1, 2007
-
Optimum Sublevel Height and Drift Spacing in Sublevel Cave Mining Based on Random Medium Theory Mining, Metallurgy and Exploration (6ee2c5d0-4d40-4945-8e70-9bbd8477aa28)
By Fengyu Ren, Ruslan Puscasu, Kunpeng Yu, Gideon Chitombo, Liangliang Kang
Weak rock mass and poor flow of material can cause excessive ore loss and dilution in sublevel caving. This paper proposes a method to establish design parameters for an inclined deposit within a weak
-
Establishing Geotechnical Baseline Values for Deep Soft Ground Tunnels
By John E. Newby
The Brightwater Conveyance System consists of four tunnel segments in three tunnel con-tracts, comprising over 21,760 m (71,400 ft) of pressurized face tunneling in complex glacial and non-glacial sof
Jan 1, 2008
-
National Mining Hall Of Fame To Honor Four (c2bf092c-db9b-40a9-aef1-4f24d0616a10)
Ceremonies for the induction of four mining industry pioneers into the National Mining Hall of Fame will be held Saturday, Sept. 13, 2008 at the Charles F. Barber Pavilion of the Museum Convention Cen
Jan 1, 2008
-
Roadheader Tunneling and Microtunneling in Low Strength Claystone at Standley Lake, Colorado
By Glen Church, Don W. Deere, Christoph M. Goss
The Standley Lake Dam Rehabilitation Project in Colorado included the complete replacement of the outlet works. This required two 1.8m (6 ft) diameter microtunneled wet lake taps, 380m and 186m (1246
Jan 1, 2005
-
Mine Safety Applications Of A Geographic Information System
By S. E. Phillipson
The Mine Safety and Health Administration?s (MSHA) Roof Control Division (RCD) collects a variety of geological and engineering information pertaining to mining conditions in surface and underground m
Jan 1, 2008
-
Pit Optimization on Clustered Realizations: Identifying Functional Scenarios Mining, Metallurgy and Exploration
By Tyler Acorn, Brandon Wilson, Jeff Boisvert
Scenario-level uncertainty is a representation of large-scale differences encountered when considering ultimate mining pits optimized over various subsets of stochastic realizations. Accounting for sc
-
Pit Optimization on Clustered Realizations: Identifying Functional Scenarios Mining, Metallurgy and Exploration (91c0eb25-b83e-4f9f-8ccb-a6f7d555458c)
By Tyler Acorn, Brandon Wilson, Jeff Boisvert
Scenario-level uncertainty is a representation of large-scale differences encountered when considering ultimate mining pits optimized over various subsets of stochastic realizations. Accounting for sc
-
Roof Bolter Rocker Pad Deflector Systems
By Arnold Hammons
Automated temporary roof support (ATRS) systems have been incorporated into roof bolters since the 1970?s. During roof bolting, many injuries have occurred from large pieces of draw rock falling inby
Jan 1, 2009
-
Second Avenue Subway—Tunneling Beneath Manhattan
By Geoffrey Fosbrook, Donald Phillips, Anil Parikh
The Second Avenue Subway is a $16.8 billion project planned by the Metropolitan Transportation Authority (MTA) in New York City. It will reduce overcrowding and delays on the Lexington Avenue Line, im
Jan 1, 2005
-
The Green Precipitate Process For Remediation Of Acid Mine Drainage
By C. Restarick, R. G. Robins, R. M. Taylor, I. Ennis
Lime addition to acid mine drainage waters (AMD), possibly accompanied by aeration, has been the basis for their remediation by precipitation of predominantly metal hydroxides. An efficient novel alt
Jan 1, 2000
-
Cultural Issues Are Important In The Implementation Of Mining Ventures
By Len Harris
Webster?s Dictionary describes culture as: ? The totality of socially transmitted behavior patterns, arts, beliefs, institutions and all other products of human work and thought typical of a popul
Jan 1, 2008
-
Battery Park Trunk Sewer Emergency Tunnel Project
By Mark Rybak
On Aug. 31, 2006, Tropical Storm Ernesto hit the city of Richmond, VA. The Battery Park area was hit particularly hard, as flooding forced an evacuation of the area. A large sinkhole collapsed a sewer
Jan 1, 2008
-
2009 Permeation Test Results For Grouts Made With Ultrafine Cements
By Raymond W. Henn
The 30th annual short course ?Grouting Fundamentals and Current Practice? was held at the Colorado School of Mines, June 22-26, 2009. The field demonstration portion of the course was conducted June 2
Jan 1, 2009
-
BWARI Tunneling Underway
By Thomas L. Richardson, David R. Chapman, Gary W. Gilbert
The two contracts of the Big Walnut Augmentation/Rickenbacker Interceptor(BWARI) sewer project for the City of Columbus, Ohio total nearly 35,000 feet of 14and 12-foot diameter tunnel. EPB TBMs will i
Jan 1, 2005