Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Convection Mechanisms For Geothermal Heat Exchangers In A Vertical Mine Shaft

    By R. Thornton

    Montana Tech is located in the historic mining town of Butte, MT and is adjacent to the Orphan Boy mine. This abandoned underground mine will be the heat source for a down-hole heat exchanger (DHE)/he

    Feb 27, 2013

  • SME
    Direct Measurement And Control Of Sag Volumetric Loads Using Embedded Sensors

    By A. Vien

    Over the past several years, Svedala has developed a continuous charge monitor (CCM) for tumbling mills. It consists of a strain gauge embedded into a rubber lifter and associated electronics. This pa

    Jan 1, 2001

  • SME
    Influence of Iron Ore Sinter Base Mix Fines (− 0.150 mm) Size on Mineralogy and Physical and Metallurgical Properties of the Sinter - Mining, Metallurgy & Exploration (2021)

    By M. SIDDARAJU, Rameshwar Sah, T. Umadevi, K. S. SRIDHARA, B. D. Ganesh Shetty, M. RAJU

    The production of high strength iron ore sinter for blast furnace iron making unit was developed by optimizing the granulometry of less than − 0.150 mm fines in sinter base mix which consists of iron

    Oct 16, 2021

  • SME
    Stochastic Modeling Of Stormwater And Receiving Stream Concentrations

    By R. W. Chappell, M. W. Hills, R. L. Olsen

    A stochastic approach was developed and applied to the Butte, Montana Hillside abandoned mining site for modeling stormwater runoff and subsequent receiving stream loadings. This approach enabled cap

    Jan 1, 2002

  • SME
    An Investigation On The Stability Of A Deep Open Pit Lignite Mine Using Finite Elements Analysis

    By E. Stiakakis

    The paper presents a geotechnical simulation of the "Mavropigi" open pit mine (Western Macedonia Lignite Center, Greece), using the finite element method. The simulation was based on the initial plann

    Jan 1, 2006

  • SME
    Information And Computer Systems In The Gold Mines Of The Industrial Complex "Kazzoloto"

    By L. A. Bakhvalov

    According to the practice of mining management in the system of industrial complexes, the Kazakhstan gold mines are part of the mine processing industrial concerns providing ore-mining and ore-dressin

    Jan 1, 1992

  • SME
    Evaluation Of Ct-Based Coal Washability Analysis System Under Simulated On-Line Conditions

    By J. D. Miller, C. L. Lin

    Appropriate software and hardware necessary to adapt a x-ray CT analyzer for determination of coal washability has recently been developed and sucessfully tested for well characterized samples under l

    Jan 1, 2001

  • SME
    Energy Fuels Prepared To Ride Uranium?s Resurgence

    The two candidates in the upcoming presidential election in the United States each say that they have their own solution to the nation?s energy problems - solutions that will increase the amount of en

    Jan 1, 2008

  • SME
    Stability Prediction And Performance Of Highwall Steepening In Weak Rock

    By D. R. Brox, J. Levell

    The Montana Tunnels Mine was mined out to a depth of 900 feet at the end of 1999. The first signs of instability were recognized in 1996 along the upper slope area of the northwest sector when the pit

    Jan 1, 2001

  • SME
    Political-Risk Management in the Northern Andean Countries

    By W. J. Spat

    Political risk is an integral part of the mining business in northern Andean countries. Peru, Ecuador, Colombia and Venezuela all have a higher than average political risk compared with other South A

    Jan 1, 2000

  • SME
    Mini Symposium - Management Practices In The Mining Industry ? Industrial Relations In The Mining Industry

    By Thomas F. Connors

    The end of an era is here. The pony-express era of industrial relations in the coal industry is ending. Those professionals who know it must end to insure the industry's future are happy, relieve

    Jan 1, 1981

  • SME
    Case History of a Mixed Ground Microtunnel

    By D. Craig Camp

    conditions. The soils included 65 m of rock not exceeding an unconfined compressive strength (UCS) of 200 kgf/cm2, 130 meters of soft clay, silt, and sand not exceeding 30standard penetration test SPT

    Jan 1, 2001

  • SME
    Increasing Availability through Advanced Gearless Drive Technology (581a2310-147b-4546-9b01-72b08d1517e0)

    By C. Dirscherl

    "Declining ore grade, leading to increased material transport and plant throughput requirements, is one of the major challenges in the current mining environment. This is accompanied by rising energy

    Jan 1, 2015

  • SME
    Lyon–Turin Long and Deep Railway Tunnel Project

    By P. Fauvel, V. Nasri

    In January 2001, French and Italian governments signed an agreement for the construction of a new Lyon-Turin railway line. This project includes a tunnel of 53.1 km length and a maximum of 2500 m over

    Jan 1, 2005

  • SME
    Monitoring and Evaluation of Ground Movements Above a Deep Longwall Mine in the Eastern United States

    The prediction and control of ground deformations due to underground mining are important considerations in the permitting, planning, and monitoring of coal mining operations. The prediction of mining

    Jan 7, 2020

  • SME
    Exploration Review (0aa637d4-de3b-49fc-9275-003815a21e5a)

    By D. R. Wilburn

    This summary of international mineral exploration activities for 2008 draws upon available information from industry sources, published literature and U.S. Geological Survey (USGS) specialists. The s

    Jan 1, 2009

  • SME
    Floodplain Aggregate Mining In Western Oregon (2ca5f679-fd59-4011-96c0-926073fa7dc9)

    By E. F. Schnitzer, S. R. Mamoyac, P. J. Wampler

    During 1996 and 1997, Oregon experienced flooding on a scale not seen in many years. Some gravel pits located near rivers experienced erosion and, in several cases, breaches between the gravel pit an

    Jan 1, 1999

  • SME
    Planning And Teamwork Lead To Successful Start-Up At Batu Hijau

    By P. Hickey, J. Spenceley, T. J. DeMull

    Development of the Batu Hijau Project was successfully completed in the fourth quarter of 1999 with the final handover and start-up of ore processing facilities. The development project had started m

    Jan 1, 2001

  • SME
    Mineral resources policies and governance in Indonesia

    By G. Tiess, S. Mujiyanto

    Indonesia is a fast growing democratic developing country comprising more than 17,000 islands, founding member of ASEAN and a member of the G-20 major economies. It is one of the most highly mineralis

    Jan 1, 2011

  • SME
    Financial Evaluation and Risk Assessment of a Placer Gold Deposit during the First Stages of Exploration: A Case Study

    By D. Drymonitis, G. Gialoglou

    "Placer gold mineralizations have been observed in the north-eastern parts of Greece. Some of them have been at first evaluated to be of special interest so, exploration campaigns have been designed a

    Jan 1, 2005