Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Feasibility study of electricity generation from discard coalBy A. Engelbrecht, B. North, B. Oboirien
"There is large electricity generation potential in discard coal, both in stockpiles and current arisings. Power stations with a combined capacity of up to 18 GW electrical (GWe) could be fuelled by d
Jan 1, 2015
-
Management Of Subsidence Associated With The Mining Of The Roof Of The Sishen Cave. An Application Of The Slope Stability RadarBy Glen Mc Gavigan
The roof of the Sishen cave is being mined in order to exploit 6.8Mt of high grade ore. The cavity is filled with quartzite backfill in order to support the roof in the event of collapse. The cave d
Jan 1, 2006
-
Research In Pyrometallurgy At The University Of Pretoria, 1980-2005Keywords: Pyrometallurgy, Pretoria University Substantial research in pyrometallurgy at the University of Pretoria started in 1980 with the appointment of Rian Dippenaar to the Iscor Chair, a posi
Jan 1, 2006
-
The Effect Of Mode Of Occurrence Of Galena And Sphalerite On The Selective Flotation Of Ore Samples From The Rosh Pinah MineBy Petrus Christiaan Pistorius, Makunga Daudet Seke
The flotation response of a Pb-Zn sulphide ore from the Rosh Pinah Mine (Namibia) was studied in the presence of inorganic depressants such as sodium cyanide and zinc sulphate. Poor flotation selectiv
Jan 1, 2005
-
Applied Ergonomics For Operator Compartment Design In An EJC 88 XLP LoaderBy S. Thorley
In engineering design of operator?s compartments, in underground mining equipment, ergonomics principles are often neglected or not given the full recognition they deserve. This paper defines ergonomi
Jan 1, 2006
-
-
The Youga Gold Project - A West African Project Financing Case Study (98dba44f-d023-4a1b-aa5b-2a4dc1105351)By J. Forwood
The Youga gold mine in Burkina Faso, West Africa, is scheduled to produce first gold in the third quarter of calendar 2007. The project is expected to produce 540 000 oz of gold over 6.5 years, from
Jan 1, 2007
-
Information As An Alternative To Mineral Rights TaxationA new system for granting access to mineral rights is proposed in the recently released White Paper, ?A Minerals and Mining Policy for South Africa?. Official policy states that ?Government?s long-ter
Jan 1, 1999
-
Blast optimization at Kriel Colliery - SynopsisBy A. M. Neale
Kriel Colliery has experienced some sub-standard blast results on the overburden. Blast results are considered poor when the fragmentation is too big, back break into the new highwall, capping is expe
Jan 1, 2010
-
Effects Of Slag Chemistry And Temperature On Wetting And Penetration Of Refractories By SlagsBy D. Xie
An in situ gravimetric technique based on wetting and capillary action principles has been used to investigate the wetting and penetration of synthesized alumina samples and commercial magnesia spinel
Jan 1, 2004
-
Processing Of Konkola Copper Concentrates And Chingola Refractory Ore In A Fully Integrated Hydrometallurgical Pilot Plant CircuitBy R. M. Whyte
The Konkola Deep Mining Project (KDMP) seeks to exploit the deep level potential of the Konkola Deeps orebody, producing high grade copper concentrates for treatment at the Nkana Smelter and Refinery.
Jan 1, 2001
-
An effective face support system to minimize rockfalls - SynopsisBy N. D. L. Burger
An effective prototype face support system to minimize rockfalls in rockfall-prone mines was developed and patented during a project sponsored by the Mine Health and Safety Council (MHSC). An experime
Jan 1, 2008
-
Interventions for Ensuring Sustainability of the Minerals Education Programmes at the Polytechnic of NamibiaBy D. Tesh
The mining industry worldwide is facing a tremendous shortage of minerals engineers in all fields of specialization. For instance, in Australia the skills shortage in the mining industry has been iden
Jan 1, 2014
-
Determination Of Optimal Cut-Off Grade Policy To Optimize NPV Using A New Approach With Optimization FactorBy A. Bascetin
One very important aspect of mining is deciding what material in a deposit is worth mining and processing, versus what material should be considered waste. This decision is summarized by the cut-off g
Jan 1, 2007
-
Changing Minds??A White Flag? ? SynopsisBy J. L. Viljoen
t has long been the drive of the industry and all operations to create an environment that is free of injury and illness. We have come a long way; the leaders, executives, managers, supervisors and wo
Jan 1, 2011
-
Some Benefits Arising From The Establishment Of A Mining Infrastructure Prior To The Commissioning Of The ShaftBy H. C. de Wet
The predevelopment and preparation of a total infrastructure in a deep level mining environment, prior to the shaft system being commissioned has major advantages. This paper intends to indicate these
Jan 1, 1997
-
Fire And The Art Of Metals - A Short History Of PyrometallurgyBy F. Habashi
The first documentary evidence for the use of fire to extract a metal was furnished by the wall paintings of the ancient Egyptians showing workers using the blowpipe and bellows to increase the temper
Jan 1, 2004
-
Tailings based pipe-support systemsBy C. E. Hales
In an effort to improve efficiencies and reduce costs, AngloGold has embarked on a process to develop and deliver consistent, high quality, tailings based support or construction products to stopes an
Jan 1, 2003
-
Electrokinetic And Flotation Studies Of Hematite Using Di(2-Ethyl Hexyl) Phosphoric AcidBy B. Das
he flotation studies on hematite were carried out using di (2-ethylhexyl) Phosphoric acid (D2EHPA) as the collector. The possible mineral reagent interaction was studied through electrokinetic and dis
Jan 1, 2003
-
Cyanide Control In The Metallurgical Process Of Gold Extraction In AngloGold (S.A.)By B. J. Vorster
AngloGold South Africa region currently consists of twelve gold plants. These plants use a combined total of $20 million of cyanide per annum. Of this, the major portion (60%) is consumed at two Ergo
Jan 1, 2001