Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
"Journal: 100 Years / Colliery Guardian London January 5, 1906 / Accidents From Explosivesin 1905."
By Robert Hopler
In the annual report under the Explosives Act for 1905, H.M.inspectors state that over 90 percent of the accidents causing death or personal injury occurred in the use of explosives and under miscella
Jan 1, 2007
-
The Neural Net Model of Optimizing Selection on Preparation of Powdery Emulsion Explosives
By Duan Baofu, Wang Xuguang, Song Jinquan
In this paper, the model of optimizing selection on preparation of Powdery Emulsion Explosives(PEE) is established by the Neural Net Theory(NNT). On the basis of some data in the study of PEE, the tra
Jan 1, 2003
-
Back to Basics in Drilling Safety
By John Brown
Let’s talk about things that you, the driIl boss, the pit boss and the driller can do to eliminate the trend in drilling related accidents that have come to plague our industry in recent years. My pap
Jan 1, 2000
-
Tunnel Lining Removal and Excavation by Controlled Blasting
By Jeff Hammer, John McGregor
"The Twin Tunnels, originally constructed in 1964, have become a major choking point for trafficheading up to and returning from the Colorado high country along the I-70 corridor. To increase traffic
Jan 1, 2016
-
Damage Complaints: Damage Potential, Pre-Blast Evidence, Human Response
By David R. Ziegler
The concept and facts concerning "threshold blast damage" are not considered "general knowledge". Perhaps because of a lack of knowledge, understanding, and experience of blasting effects, property ow
Jan 1, 1997
-
Novel Emulsion Explosives Technology and Application
By Dale Ramsey
Emulsion explosives have become the product of choice for many blasting applications and are not limited to just extreme wet hole conditions or special application environments as in the past. Today’s
Jan 1, 2000
-
Future Directions in Ground Vibration and Airblast Control within an Australian Regulatory Context
By A Brodbeck, AT Spathis
Australian regulatory control of ground vibration and airblast arising from mining, quarrying and civil construction operations is spread across a number of federal, state and local authorities and ac
Jan 1, 2005
-
COMPARISON OF IMESAFR DEBRIS DENSITY RESULTS TO ISO-1 and ISO-2 TEST Data
By Amos Bryant, Jesse Davis
This paper compares the predictions of the latest Institute of Makers of Explosives Safety Analysis for Risk (IMESAFR) model versus physical test data recovered from ISO-1 and ISO-2 tests in Woomera,
Jan 1, 2010
-
Daveytronic, Digital Detonator Testing in a Vibration Sensitive Environment
By Douglas A. Bartley, Davey Bickford, Raphael Trousselle
The long awaited arrival of a high accuracy detonator to reach the explosives end user will provide new opportunities the blasting community to become better equipped and able to improve upon the curr
Jan 1, 1998
-
Iron Ore Blast Designs and Cap Testing at the Minntac Mine
By Jack Eloranta
To improve control of blasting, tests were performed to assess non-electric cap accuracy. Simultaneous testing using a Velocity of Detonation Recorder (VODR), Red Lake Lo-Cam and an Instantel DS-677 b
Jan 1, 1992
-
The Didcot Demolition
By R. Alford
In the modern world of demolition safety is paramount and unnecessary or unquantifiable risks are not accepted (FasterCapital, 2024) and all risks must be kept As Low As Reasonably Practicable (ALARP)
Jan 21, 2025
-
Perimeter Blasting in Underground Mining
By Paul Sterk
In underground mining a great deal of time, money, effort, and resources have been used in the effort to minimize blast-induced damage. This damage occurs to the back, ribs, and pillars when the energ
Jan 1, 2003
-
Guidelines for Mining and Quarry Blasting Urban Areas Brazilian Regulation NBR 9653 Under Current Reviewed
By Denise de La Corte Bacci
The Brazilian Regulation NBR 9653 is a guide intended to evaluate mine and quarry blasting effects in urban areas. The first version, written in 1986 by the Committee of the Brazilian Associate of Tec
Jan 1, 2005
-
The Potential for Unifying Drilling, Blasting and Downstream Operations by the Application of Technology
By Lyall Workman
"Many new technologies, useful to the mining and quarrying have recently come to market. Some are applicable to drilling and blasting operations. Others apply to subsequent mining unit operations and
Jan 1, 2001
-
JKVBOC Blast Movement Model Applications for Ore Control at Open Pit Mines
By Constanza Bujes, Mark Jones, Graham Crook, Yansan Jamyanbaatar, Sedat Esen
Tracking ore characteristics such as grade and hardness from its original position into the material handling and processing stages remains one of the key challenges in open pit mining of hard rock de
-
The Role of the Muckpile in the Fumes Produced by Commercial Explosives
By K Taylor
Small scale tests have been conducted in blasting vessels in the laboratory, where the effects of explosive composition, charge diameter, explosive confinement as well as additives to the explosive we
Jan 1, 2014
-
Method of Ground Water Removal from Blast Holes
By I. Petrovsky
Presence of the ground water, especially flowing water, causes limitations in the type of the explosives, which can be used for the blasting development in the open cats and quarries. This presents re
Jan 1, 2003
-
Roadblocks: Increasing Production, Reducing Problems
By Greg Parker
"As the Explosives Industry continues to evolve and condense, those involved, such as Blasters,Contractors, Distributors and Consultants, continue to be challenged by both internal and externalforces.
Jan 1, 1999
-
Wanted: Blaster
By Ron Gilbert
Every day, demand increases with over all population; supply must follow. People must have more food, shelter, and mobility. Raw materials must be mined. Roads, trenches and foundations support the q
Jan 1, 1996
-
Precision Delay Detonators and Their Effect on Blasting Performance in Quarry Blasts
By B Mohanty, M Alam, F Gauthuer
A series of eleven full-scale production blasts has been earned out in a limestone quarry to study the effect of delay interval and its precision on overall blasting performance. The quarry employed A
Jan 1, 1991