Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Priming Procedures Employed at the Tallya Quarry

    By Janos Foldesi, Calvin J. Konya

    The determination of the number of primers necessary to efficiently initiate an explosive column charge is essential to good blasting. If the number of primer is insufficient, the total energy stored

    Jan 1, 1976

  • ISEE
    Powder Emulsion Explosives

    By Shao Li, Chen Zhiming, Wu Jihong

    In this paper,powder emulsion explosives,which have high sensitivity and strong detonation force,have been studied by applying emulsion technology to the production of the present powder ones.Under th

    Jan 1, 1991

  • ISEE
    Blast Optimisation (Oversize Reduction) at the Astec Bluerock Quarry

    By Andrew Drake, Mark Burchard, Peter Bellairs

    The Astec Bluerock Quarry is excavating an extremely difficult to blast rock type due to its highly variable jointing density that leads to excessive oversize. A drill and blast benchmarking exercise

    Jan 1, 1998

  • ISEE
    The Comminution Theory Applied to Rock Blasting

    By Carlos Agreda

    A general review of the comminution theory and also the general differential equation of the comminution are described, analyzed and discussed in order to be applied to rock blasting. Some size distri

    Jan 1, 1994

  • ISEE
    Why the 8MS Rule Doesn’t Work

    By D. Bartley, R. McClure, W. Reisz

    Ever since the 8ms criterion was developed in the early 60’s there has been an ongoing debate among many blasters as to its actual value in controlling ground vibration. The perpetuation of the myth s

    Jan 1, 2006

  • ISEE
    Experimental Investigation of the Fumes Produced by Modern Commercial Explosives

    By P D. Katsabanis, W Roberts

    Commercial explosives exhibit non ideal behaviour which is very difficult to model. The fume spectrum produced by commercial explosives apart from its practical significance for underground mining is

    Jan 1, 1992

  • ISEE
    Benefits of Us DMC_Blast in Open Pit and Underground Mining

    By Dale Preece, Stephen Chung

    Mining and quarrying industries recognize blasting as the most effective method for breaking and removing large volumes of rock. However, the economics of blasting are often offset by the costly trial

    Jan 1, 2002

  • ISEE
    Polyurethane Foam and Sand Barriers Expand Explosive Storage Capacity

    By Theodore C. Hile, Floyd P. Henry, Ken Gragg

    "Conventional explosive-storage methods usually rely on combinations of earth and concrete barriers, along with sufficient distance between limited explosive loads, to avoid accidental conflagration.

    Jan 1, 1999

  • ISEE
    Backstoping with Millisecond Delay Timing at the Sunshine Mine, Kellogg, Idaho

    By Dale Nies

    In the past, cap and fuse has been the only economical and efficient initiation system capable of providing sequential timing, ease of loading and hookup, and unlimited borehole number for backstope r

    Jan 1, 1989

  • ISEE
    Cross Borehole Stress Wave Measurements in Underground Coal

    By Michael S. Wieland

    The stress waves generated during delay blasting in underground or surface mines not only fracture the surrounding coal, rock, or other strata, but also impact delayed charges remaining in neighboring

    Jan 1, 1988

  • ISEE
    Benchmarking Drill and Blast Compliance to Design, A Case Study

    By Alan Tordoir, Mark Roberts

    The drill and blast process is a critical function within the production cycle which significantly impacts the ability of an operation to effectively meet its safety and production targets. Acknowledg

    Jan 1, 2019

  • ISEE
    Application of Underground Pre-Splitting in Butte, MT

    By M. Gebhardt, J. Johnson, S. Rosenthal

    The use of presplitting applications in an underground mine setting is a method of reducing overbreak in the rib and back when blasting occurs. Presplitting performed at the Underground Mine Education

    Jan 1, 2024

  • ISEE
    Blast Documentation Using the Techbase Database Management System at the Eastside Reservoir Project

    By Martin Chenoweth

    The Metropolitan Water District of Southern California (MWD) is undertaking one of the nations largest water management projects. The Eastside Reservoir Project is being built to insure a supply of wa

    Jan 1, 2000

  • ISEE
    A Common Sense Approach to Cutting Drill and Blasting Costs

    By Phil N. Bradbury

    "During a routine belt tightening of all cost centers, the management at the Martin County Coal Surface Mines, located in Martin County Kentucky felt that a thorough investigation of the drilling and

    Jan 1, 1986

  • ISEE
    Simplification of Complex Wiring Circuitry

    By John F. Mitchell

    Large production blasts involving many series in parallel have long been a source of complication. When speed and accuracy are most necessary in blast preparation an efficient and precise method of wi

    Jan 1, 1976

  • ISEE
    Determining TNT Equivalent Energy Magnitudes from Accidental Explosions

    By Karl E. Burgher

    Accidental explosions occur throughout the world. They can happen at chemical plants, fireworks plants, grain depots, or as a result of collisions involving volatile or hazardous chemicals. It is inte

    Jan 1, 1993

  • ISEE
    Fragmentation Control Through the Attenuation of Explosively Produced Shock Waves

    By S B. Richardson, N T. Moxon, A C. Torrance

    In many mining situations the energy released by an explosive is far too high and results in over fragmentation and excessive damage to the surrounding strata. Laboratory experiments have demonstrated

    Jan 1, 1989

  • ISEE
    Prediction of Dynamic Response of Ground due to Blast Loading

    By Chang-Ha Ryu, Hyung Yang, Hyung-Sik Yang

    Ground vibration by rock blasting causes many environmental problems to adjacent structures and human bodies. Growing concerns have been given to the effects of dynamic loading induced by blasting wor

    Jan 1, 2001

  • ISEE
    Problems and Solutions of Sewerline Construction in Residential Areas

    By Bill Runner, James T. Ludwiczak

    During the last few years, there has been a flood of local, state, and Federal government regulations concerning blasting. Many of the laws and regulations were written by individuals who know little

    Jan 1, 1979

  • ISEE
    Determination of Flying Distance of Pieces in Demolishing Blasting

    By Zhang Qi

    For the most part, the flying piece is serious endangerment in the demolition blasting. To prevent the endangerment, a large number of materials are needed as the protection. Therefore, the determinat

    Jan 1, 1994