Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Reliability Of Pile Prediction Methods - Summary

    By M. T. Davisson

    Pile compression load capacity prediction methods are divided into four categories for purposes of discussing their reliability compared to static load test results. The categories considered are: 1)

    Jan 1, 1991

  • DFI
    Numerical Analysis of CFA Piles for High-Rise Building of Administrative Centre Lakeside Park in Bratislava

    By J. Stacho, Frankovská. J.

    "Abstract The use of continuous flight auger (CFA) piles in Slovakia has increased significantly in recent decades. High-rise building of administrative centre Lakeside Park in Bratislava is based on

    Jan 1, 2014

  • DFI
    Deep and Extra Deep Diaphragm Walls in Shanghai – Increasing Demand for Infrastructure in Megacities Drives the Requirement of Increasing Depth for Diaphragm Walls

    By Wu Jie Mei, Li Yao Liang, Franz-Werner Gerressen, Arthur Bi

    Diaphragm walls (D-walls) are known as underground structural elements commonly used for retention systems and permanent foundation elements. In addition, they are also quite often used as deep ground

    Jan 1, 2018

  • DFI
    Use Of Micropiles And Soil Nail Piles In State Of California Earthquake Retrofit Project No.#569 - Deep Foundations Institute Seattle, Washingon October 7-9, 1998

    By Ron Bromenschenkel

    The State of California, Department of Transportation is currently retrofitting a major interchange near the San Francisco area. The project is located in a highly traveled area of Oakland with light

    Jan 1, 1998

  • DFI
    Simbat : High Strain Dynamic Test Of Piles

    By Dominique Vié

    Standards methods covers the procedures for testing deep foundation to determine the force and velocity response to an impact of a pile driving hammer or similar device. The results of analysis genera

    Jan 1, 2002

  • DFI
    250 M Ultra Deep Milled Diaphragm Wall: The New Frontier for the Cut off Wall Depth has Been Doubled by Trevi Group Technology

    By Maurizio Siepi, Stefano Trevisani, Pagliaccim Federico, Daniele Vanni

    "Abstract: The paper describes a large innovative project completed in 2012-20123 by Trevi Group, to develop equipment capable to install ultra-deep diaphragm wall. The project highlights the capacity

    Jan 1, 2014

  • DFI
    Oakland Airport Roadway Project - Synopsis

    By David S. Yang

    The construction of Oakland Airport Roadway Project for the airport expansion requires stabilization of subsurface soils for the construction of three grade separation structures at two roadway interc

    Jan 1, 2001

  • DFI
    Increase In Shear Modulus By Soil Mix And Jet Grout Methods

    By Paul J. Axtell

    The results of in-situ geophysical cross-hole tests on improved soil by soil mixing (SM) and jet grouting (JG) are described. This testing was conducted on soil improved by SM and JG columns construc

    Jan 1, 2008

  • DFI
    New Piling System With Multi-Head Hammer Drill Capable Of Drilling Including 35,000 Psi Rock "Mach Drilling System" And Some Construction Examples - 1. Incentive Of Development

    By J. Nakayama

    For drilling large diameter holes for deep foundations, the common and distressing difficulty of long standing has been in coping with ground containing rocky formations and boulders. Where geological

    Jan 1, 1988

  • DFI
    Case History: Deep Soil-Cement Mixing At The I-90/I-93NB Interchange On The Central Artery/Tunnel Project, Contract C09A7 At Fort Point Channel Site, Boston, MA - Synopsis

    By Robert Jakiel

    The following paper is being presented to provide an understanding of the Deep Soil-Cement Mixing (DMM) performed at Contract C09A7 at the Fort Point Channel Site (FPC), for the I-90/I-93 Interchange

    Jan 1, 2000

  • DFI
    Cement-Bentonite Slurry Cut Off Wall Maxent Lagoon Levee Rehabilitation Orleans Parish, Louisiana - Summary

    By Edmund J. Cardoza

    The paper describes the design, construction and quality control aspects of the installation of a cement-bentonite (CB) cut off wall to impede seepage through a flood control dike. Special emphasis is

    Jan 1, 1992

  • DFI
    Permanent Canal Closures and Pumps Cofferdams – Support of Deep Excavation in Soft Ground Using the Open Cell Sheet Pile System

    By Ryan Higbie, King Chin, Matthew Anderson, Mike Huggins, Rian Johnson, Dave Sinsheimer

    "The Permanent Canal Closures and Pumps (PCCP) project is the capstone piece of New Orleans’ extensive hurricane risk-reduction system constructed following Hurricane Katrina. The project consists of

    Jan 1, 2017

  • DFI
    Optimal Subsurface Investigation Approach for Overhead Transmission Structures

    By Haijian Shi, Drew Pizzo

    This article focuses on the appropriate application of subsurface investigation methods for transmission structures, which are typically designed to resist lateral rather than vertical loads. Currentl

    Jan 1, 2018

  • DFI
    A Novel Approach To The Performance Evaluation Of Driven Prestressed Concrete Piles And Bored Cast-In-Place Piles

    By Sridhar Krishnan

    This paper presents the results of a comprehensive pre-production pile testing programme for the US$ 800 million 1400MW Coal-Fired Jimah Power Plant Project in Negeri Sembilan, Malaysia. The testing p

    Jan 1, 2006

  • DFI
    Axial Pile Analyses For The New East Span Of The San Francisco-Oakland Bay Bridge

    By Jacob Chacko

    The east span of the San Francisco-Oakland Bay Bridge (SFOBB), which is one of the most heavily traveled bridges in the world, will be replaced due to seismic safety concerns. The majority of the new

    Jan 1, 2002

  • DFI
    Dynamic And Static Loading Tests Of Piles For Bridges In Surinam - Introduction

    By W. J. van Niekerk

    Ballast Nedam is in Surinam constructing two bridges that will improve communications in the coastal region. The bridges will cross the Coppenam and Surinam rivers and will be founded on open-ended st

    Jan 1, 2000

  • DFI
    Innovations in the Design and Construction of Marine Foundations

    By Robert B. Bittner

    "AbstractLarge diameter tubular piles offer significant advantages in terms of design performance and economy for major marine structures. This is particularly true for foundations of major overwater

    Jan 1, 2014

  • DFI
    I-880 Replacement Project (Cypress Freeway) Large Diameter Driven Pipe Pile Foundations Test Program And Construction - Program Development - Background - Collapse

    By Darrell L. Beddard

    The Loma Prieta earthquake occurred on October 17, 1989 at 5:04 PM, Pacific Daylight Time. It measured 7.1 in magnitude and was felt from Los Angeles north to the Oregon state line and east to western

    Jan 1, 1996

  • DFI
    Conference Photographs

    [ ]

    Jan 1, 1994

  • DFI
    Deep Jet Grouting Grids for Support of a 42-Story Tower Designed Using Performance-Based Seismic Design

    By Scott A. Walker, Roberto A. Lopez, Lori A. Simpson, David A. Shook

    500 Folsom Street is part of the new Transbay neighborhood in San Francisco, which is being redeveloped after the 1989 Loma Prieta Earthquake damaged a freeway viaduct; removal of the viaduct created

    Jan 1, 2018