    Construction of Long Deep Mixing Columns by Low-Height Rig

    By Shigenori Horikawa, Nobutaka Tanaka, Toshiro Hara, Kengo Yamamoto

    "The CDM-LODIC method(Low Displacement and Control method), a modified the CDM(Cement Deep Mixing) method, reduces the ground displacement through the removal of in-situ soil equivalent to the amount

    Jan 1, 2015

  • DFI
    Diplomacy And Innovation: Octakong And The Hong Kong-Zhuhai-Macau Bridge Project

    By David White

    When finished (projected completion in 2016) the Hong Kong-Zhuhai-Macau Bridge Project will comprise three cable-stayed span bridges and a 4.15 mile immersed tube tunnel - linking Hong Kong to Macau a

  • DFI
    Diplomacy and Innovation: Octakong and the Hong Kong-Zhuhai-Macau Bridge Project

    By David White

    "When finished (projected completion in 2016) the Hong Kong-Zhuhai-Macau Bridge Project will comprise three cable-stayed span bridges and a 4.15 mile immersed tube tunnel - linking Hong Kong to Macau

    Jan 1, 2017

  • DFI
    Trencher Method Vs. Slurry Trenching: A Pros & Cons Comparison Of Case Studies

    By Daniel Ruffing, Charlie Krug

    In recent years, the chain-style trencher has been proven a valuable tool for installing vertical walls on challenging sites where conventional methods may be less desirable. Like many tools, trencher

  • DFI
    Field Testing of Energy Piles at Virginia Tech (eec8519c-b3f5-4281-8615-91be67ef6c77)

    By C. Guney Olgun, Charles Elks, Sherif L. Abdelaziz, James R. Martin, Christopher Fox, Pier Luigi Iovino, Fatih Catalbas, Pierre Gouvin

    "Energy piles are a new innovative renewable energy technology to access and exploit the relative constant temperature of the ground for efficient heating and cooling of buildings. Examples of energy

    Jan 1, 2017

  • DFI
    Design, Specification And Installation Of Square Shaft Helical Piers In Expansive Soils

    By John S. Pack

    The application of square shaft helical piers in expansive soils is a standard of practice in many areas of the United States. Over 20 years of performance monitoring show exceptional performance and

    Jan 1, 2007

  • DFI
    Full Scale Uplift Load Testing of Micropiles in Cohessionless Soil

    By M. Hesham El Naggar, Maged A. Abdlrahem

    "Hollow bar micropiles have constructional advantages such as: fast and low-noise and low vibration installation process and small installation equipment, which allow access to tight places. In additi

    Jan 1, 2016

  • DFI
    Cut-Offs in Temporary Coffer Dams As Seepage Barriers for Concrete Dam Construction –A Case Study of Teesta –V H E Project in Sikkim (India)

    By I. D. Dayal, Anil Kumar Jain

    "Cutoff walls are frequently used to slow down or prevent seepage of water through and/or around dams. Cutoff wall is a type of seepage barrier structure designed to reduce the flow of water underneat

    Jan 1, 2016

  • DFI
    Monotonic And Cyclic Lateral Full-Scale Testing Of Reinforced Helical Pulldown Micropiles

    By M. Meckkey El Sharnouby

    In this paper, the results of full-scale field testing of reinforced helical pulldown micropiles (RG-HSP) installed in clayey till soils and resting on sandy soils are presented. Piles were tested und

    Jan 1, 2011

  • DFI
    Keynote Lecture 5: Giovanni Lombardi Grouting of Rock Masses

    By Giovanni Lombardi

    In order to get a clear overview of the grouting works carried out, to avoid misinterpretations of the data and functions shown on the display of the grout monitoring device, it is recommended to keep

    Feb 10, 2003

  • DFI
    Deep Drilling at Mica Dam, British Columbia

    By Douglas G. Baker, Jason K. Braund-Read, Megan R. Sheffer

    "Mica Dam, owned by British Columbia Hydro, is an 820 ft high earthfill embankment dam that was completed in 1973. The dam consists of a thin central impervious till core supported by upstream and dow

    Jan 1, 2017

  • DFI
    TBM Recovery Shaft Construction - SR-99 Tunnel

    By Lance Rasband, Richard Hanke, John Starcevich

    "The 17.4 meter (57 ft) diameter tunnel boring machine (TBM), the world’s largest at the time of her launch in 2012, locally referred to as “Bertha,” is stuck. Incapacitated due to mechanical failure

    Jan 1, 2016

  • DFI
    Session 24 "Compaction Grouting and Consensus Guide"

    By Richard Berry

    The spacing of grout injections is typically about 2 to 2 V½ meters if the purpose of the grouting is densification of the in-situ soils. Hole spacing will vary with the in-situ soil properties and th

    Feb 10, 2003

  • DFI
    Design Build & Failure: Perils at a High Risk Shoring and Retaining Wall Project.

    By Mark Spence, Tom Lardner, Matthew Janes

    "IntroductionThe design-build method streamlines project delivery through a single contract between the Contract manager and the design-build team. The design-build method places emphasis on collabora

    Jan 1, 2015

  • DFI
    Research on Strength Characteristics of Cement-Treated Soils at Construction Joints

    By Naoyuki Hanawa, Takeo Asanuma, Tatsuo Nagatsu, Sachihiko Tokunaga, Daisuke Nakagawa, Yoshiyuki Morikawa, Kazuhiko Ueno

    "In the cement deep mixing (CDM) method, one approach to joint construction is creating a surface-contact joint. In this study, an unconsolidated-undrained triaxial compression test was performed on c

    Jan 1, 2015

  • DFI
    Ultimate Lateral Load of a Pile in Cohesive Soil under Static Loading

    By Dileej M. Dewaikar, Poonam A. Patil

    "In this paper, the ultimate lateral resistance of a long, flexible, unrestrained vertical pile in a cohesive soil is computed under static loading condition using py curves. A simple and improved met

    Jan 1, 2005

  • DFI
    Design And Construction Of A Micropile Wall To Stabilize A Railway Embankment.

    By Jim Bruce

    This paper presents details of a slope stabilization scheme built in late 2003 at a 16m-high railway embankment in southern Ontario, Canada. The owner, faced with continuing maintenance and safety iss

    Jan 1, 2004

  • DFI
    Geographic Information Systems Technology Use in Tracking Quality Control in In Situ Barrier Wall Construction (50051f21-259c-48c8-b98a-08fa9c39001e)

    By Michael Arnold, Robert Bachus, Michael Bracher, Jamey Rosen, Robert Roff

    "For a high hazard USACE facility, the Center Hill Dam in Tennessee, several disparate streams of data were compiled into a single geospatial and relational enterprise data management system to store,

    Jan 1, 2017

  • DFI
    Soil Mixing And Jet Grouting Ground Improvement Under Tanks

    By Lisheng Shao

    Soil mixing and jet grouting have been widely used to support heavy structures such as tanks, cement silos, and storage buildings. Although the installation methods vary between soil mixing and jet g

    Jan 1, 2010

  • DFI
    UHE Peixe Angical: Secant Cutoff Wall in Uncertain Geology

    By Dario Libano, Armando Caputo, Francisco Caputo

    "UHE Peixe Angical is a 452 MW hydroelectric power plant located on the Tocantins River in Tocantins, Brazil. In 1999, geologists began feasibility studies to estimate the river’s hydroelectric potent

    Jan 1, 2009