Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Design and R&D Progress of China’s Largest Underground Nonferrous Mine—Pulang Copper Mine

    By Zhang Wei

    "Pulang Copper Mine is located in Shangri-La county, Diqing Prefecture, Yunnan Province, with currently defined copper reserve of 4.8 million tonnes of copper metal and an average grade of 0.34% Cu. T

    Jan 1, 2016

  • CIM
    Recovery of Rare Metals from Spent Hydrodesulphurization Catalyst

    By J. Shibata, K. Manabe, A. Fuji, N. Matsunaga, D. Murakami, Yamaguchi University, T. Suzuki

    "Spent hydrodesulphurization (HDS) catalyst contains rare metals such as cobalt, nickel (Ni), molybdenum (Mo), and vanadium (V). The overall objective of this project is to develop a hydrometallurgica

    Jan 1, 2016

  • CIM
    An Approach to Observe Fractures Induced by Hydraulic Fracturing

    By S. Yano, S. Takagi, Y. Nagaya, T. Akai, T. Ishida, Z. Bennour, T. Suzuki

    "It is often reported that the concept of single-plane-fracture is not sufficient to account for the productivity from shale gas/oil wells. Many researchers introduce the concept of the stimulated res

    Jan 1, 2015

  • CIM
    Electric furnace matte tap hole developments at Falconbridge Limited

    By I. A. Cameron, F. Ham, R. Sriram

    "Planned increases in electric furnace productivity and higher matte temperatures needed for the Sudbury Smelter's S02 Abatement Plan, require an improved matte tap hole. Since startup in 1978, t

    Jan 1, 1995

  • CIM
    The Distribution of Ni Between Slag and Copper Metal in Copper Fire Refining Conditions

    By A. Malfliet, A. Van den Bulck, D. Willems, M. Guo

    The feed stock of copper fire refining processes consists of two major constituents: blister copper and high-Cu secondary scrap. A large fraction of this secondary scrap, originating from urban mining

    Jan 1, 2019

  • CIM
    The Behaviour of Iron in the High Pressure Acid Leach Process

    By Takao Oishi, Go Ohara, Toru Kitazaki, Masahiro Tanaka

    "The High Pressure Acid Leach (HPAL) plant for nickel-cobalt mixed sulphide production at Coral Bay Nickel Corporation (CBNC) in the Philippines has been in operation since 2005 with a capacity of 10,

    Jan 1, 2016

  • CIM
    A Cost Penalty Associated With Ferrocyanide in Gold Processing Using Cyanide

    By Mariam Melashvili, Chris Fleming, Rene Jackman

    "A study was undertaken to develop a flowsheet for treating a high grade silver/gold ore body by cyanidation, CCD and Merrill Crowe precipitation, with tailings detoxification to meet stringent limits

    Jan 1, 2016

  • CIM
    Technological changes at Les Forges du Saint-Maurice, Quebec, 1729-1883 (5d9787b8-46e4-4772-8e39-8f61c7739ae4)

    By André Bérubé

    "IntroductionSince the disappearance of Les Forges du Saint-Maurice at the end of the last century, many historians have taken an interest in the lengthy past of this enterprise. They considered the p

    Jan 1, 1983

  • CIM
    The beneficiation of Canadian garnet ores at CANMET

    By P. R. A. Andrews

    "Garnet occurs in schists and gneisses in all provinces of Canada, all mainly in Quebec and Ontario. There is currently a renewed interest in exploration for economic sources of garnet for abrasive ap

    Jan 1, 1995

  • CIM
    Microstructural Evolution during the Annealing of Hot Worked Magnesium Alloy AZ31

    By A. G. Beer

    The evolution of microstructure is examined during the annealing of hot worked magnesium alloy AZ31. The influences of deformation and annealing conditions on the developed microstructures are assesse

    Jan 1, 2006

  • CIM
    Heavy water-the CANDU moderator

    By R. J. Twigg, S. D. Chang

    "The production of heavy water, the moderator in a CANDU reactor, is examined following a flow sheet of a typical Canadian plant. The process involves the extraction and concentration of deuterium fro

    Jan 1, 1983

  • CIM
    Deportment of Toxic Trace Elements in the CIP/CIL Cyanidation Process

    By K. Bunney, R. Pleysier

    The deportment of a suite of elements through representative gold ore processing unit operations in cyanidation has been investigated. Chromium and lead are not soluble in alkaline cyanide solutions.

    Jan 1, 2011

  • CIM
    Consolidation of mine fill by freezing

    By Rachel S. Prudhomme, Michael L. Jeremic

    "The consolidation of mine backfill by free zing is a concept which has been under study in the mining engineering laboratories at Laurentian University during the past three years. The proposed under

    Jan 1, 1985

  • CIM
    The Settlement Properties of Fine Multi-metals Tailings Modified by Flocculants in Shizhuyuan Mine of China

    By He Zhexiang

    The settlement properties of tailings modified by flocculants were investigated at the Shizhuyuan Mine, with the aims to screen for the most effective flocculants and the optimum dosage rates for tail

    May 1, 2007

  • CIM
    Conversion of a crushing plant to a gold mill in a copper smelter

    By G. Macfarlane

    "In 1985, a crushing plant, located in the feed preparation area of Kidd Creek's copper smelter, was modified. The plant, which originally had treated only copper-bearing materials for the smelle

    Jan 1, 1988

  • CIM
    Alternatives to flow-through

    By Robert B. Parsons

    "It is generally felt that flow-through shares face a bleak future under the set of tax rules proposed in the federal government's tax reform white paper. Industry and government circles are begi

    Jan 1, 1988

  • CIM
    Separation processes by single-stage deep fluidized bed continuous ion exchange

    By S. H. Lucas

    "This paper describes the development and application of single-stage fluidized bed continuous ion exchange to the following processes: removal of base metals from mine water; cyanide removal from gol

    Jan 1, 1980

  • CIM
    Working within metallurgical limitations in the successful repair welding of power-plant components

    By D. Mills, W. H. S. Lawson

    "The need to make repairs is seldom a major consideration in the design, fabrication and installation of major components of electrical generation plants. Repair welding, however, is a fact of life in

    Jan 1, 1981

  • CIM
    Corporate considerations in mine decommissioning

    By M. J. Brodie

    "The decision to proceed with mine decommissioning, generally involves a number of complex and independent factors. These factors, including potential for re-opening, legal requirements, contingent li

    Jan 1, 1995

  • CIM
    Creating a Long-Term Source of Clean Baseload Power

    By David Lewin

    The journey toward cleaner coal-fired power generation is driven by technological improvements, more stringent regulations around greenhouse gas and other air emissions, and the potential of one of Ca

    May 1, 2008