Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Reverse Osmosis Desalination Plant at the Bougrine Zinc-Lead Mine, Tunisia
By Ammar Henchiri, Godfrey McDonald
"Breakwater Tunisia S.A.’s Bougrine mine is located in a semi-arid region of Tunisia characterized with Triassic salt domes. Due to extensive agricultural land-use in the mine area, a zero-discharge t
Jan 1, 2003
-
The Order in the Disorder: Quantitative Analysis of an XRF Sorter Performance
By A. Mazhary, T. Huff
Sensor-based ore sorting technology is a growing area of interest due to lower-grade ore deposits and higher costs of processing, among other reasons. Among the sensors currently utilized in the parti
Jan 1, 2019
-
Control of Size Distribution of the Ore Feeding a Semi Autogeneous Grinding Mill
By Claude Bazin, François Robichaud
"The control of the operation of semi autogeneous grinding (SAG) mills is mainly achieved through adjustments of feed rate, water addition and speed of rotation. With the introduction of image based s
Jan 1, 2013
-
Truck Lift System
? CONSTRUCTION AND MINING COSTS ARE HIGH IN THE ARCTIC ? VERTICAL KIMBERLITE PIPES WITH HIGH STRIP RATIOS ? SITE SPECIFIC GEOMETRIC CONSTRAINTS ? OPEN PIT FOLLOWED BY UNDERGROUND MINING ? HIGH KIM
May 1, 2003
-
Dense Medium Separation – An Effective and Robust Pre-Concentration Technology
By Erin Legault Seguin, Mike Rylatt, Curtis Mohns
"With energy costs increasing and ore grades diminishing, the role of pre-concentration in hard rock mining operations has been gaining greater interest. To maximize energy conservation, the pre-conce
Jan 1, 2016
-
Model-based control of column flotation: Toward industrial application and real-time optimization
By André Desbiens, Jocelyn Bouchard, René del Villar
"The metallurgical performance of the column flotation process is determined by the concentrate grade and recovery. Although the former can be continuously measured using an on-stream analyzer, the la
Jan 1, 2003
-
Wireless Communications in Mineral Processing Applications
By Peter Metcalfe
"Wireless communication in the mineral processing environment is not as simple as it is in the home or office environment. The correct design of a wireless network in the mineral processing environmen
Jan 1, 2014
-
A Comparison of Roasting Technologies for Arsenic Removal from Copper Concentrates
By C. H. Lee, K. Adham, D. Lemieux, J. P. Mai, A. M. S. Hussein, S. Francey
Copper concentrates contain an increasing amount of arsenic, as the older sources of cleaner ores are depleted. At the same time, the market-determined price penalties on arsenic rich concentrates are
Jan 1, 2019
-
Analysis and Optimisation of life-of-Mine Haulage Cost using Simulation
By Niklas Frank
Ore and waste transports form an integral part of any mining operation and represents a substantial portion of the mine´s total operating cost. Mine layout, truck fleet and size, production rates, hau
May 1, 2003
-
Haldor Topsoe’s Catalytic Advances Result in Dramatically Lower So2 Emissions
By Patrick Polk
For many years, sulfuric acid producers all over the world have been forced to meet ever more strict environmental regulations to reduce SO2 emissions. The sulfuric acid industry has implemented new s
Jan 1, 2014
-
Constancia Project Process Plant Design and Start Up
By David Stephenson, Hugo Granados, Steven Klohn
"HudBay’s Constancia project is a copper molybdenum concentrator located in southern Peru. In 2010 Ausenco was contracted to perform a feasibility study optimization review which resulted in an improv
Jan 1, 2016
-
Agnico-Eagle Laronde Plant: Metallurgical Challenges Present and Future
By Jean Cayouette, Paul Blatter, Paul Cousin
"The Laronde mill was commissioned in 1988 and has been treating the Laronde Penna ore since 2000. The Laronde plant, situated in the Abitibi region of Quebec, has experienced mill expansions to accom
Jan 1, 2011
-
In-Situ Recovery in Hard Rock Applications: Idealistic Notion or Realistic Future Processing Option?
By L. Vollert
In-situ recovery of metals is presently experiencing a revival not seen since early applications in amenable copper oxide deposits, uranium and generally applications where neither, porosity and perme
Jan 1, 2019
-
Research into high density backfill placement methods by the Ontario Division of Inco Limited
By B. Goard
"IntroductionCemented backfill has been placed underground in slurry form in Inco Limited's Ontario Division mines since the early 196Os. The slurry was traditionally mixed on surface at between
Jan 1, 1987
-
Social and Economic Aspects of Reducing Mercury Pollution in Artisanal Gold Mining
By Simon D. Handelsman
?Artisanalmining ?Application of human energy (e.g. pick & shovel) directly to produce minerals ?majority no technical skills and lack adequate working tools ?Small-scale mining ?Application of mo
May 1, 2006
-
Innovative use of SMART Cable Bolt Data: Numerical - Back Analysis for Interpretation of Post Failure Rock Mass Properties Post-
By Jason J. Crowder
Presentation Outline ? Introduction ? Costs of ground support and rehabilitation ? Why post-failure rock mass properties are necessary ? The Rock Mechanics Problem ? Present State of Modelling a
May 1, 2006
-
Cyanidation in Grinding Circuit: Evaluation of Leaching Parameters in Grinding and Cyanidation Addition Strategy
By J. Châteauneuf, R. Dupéré, D. Mrabet
"In gold processing plants, it is common to start gold cyanidation in the grinding circuit by simple cyanide addition or as a result of recycling residual cyanide. In such cases, advantages such as a
Jan 1, 2016
-
The Platinum-Group Minerals
"7.1. Glossary of the Platinum-Group Minerals7.1.1. IntroductionA glossary of the platinum-group minerals (POM) serves as a useful introduction to a chapter on their mineralogy. Earlier glossaries (Ca
Jan 1, 1979
-
Using 3D Computer Simulation to Improve Construction Project Planning
By Patrick Cloutier
Presentation objectives ? Introduce discrete-event 3D computer simulation as a tool to design, improve and optimize construction projects: ? Describe a real typical construction project planning i
Aug 1, 2013
-
Performance Enhancement of Semi-Autogenous Grinding Mills Through the Use of Instrumentation Based on Acoustic Signals
By David G. Almond
"Economies of scale and the variable characteristics of many large ore deposits have resulted in grinding installations having large SAG mills fitted with variable speed drives. Problems associated wi
Jan 1, 2005