Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Experimental Electric Smelting of To Produce High-Titania Slag and Ilmenite Pig IronBy G. E. Veins
This paper summarizes an investigation in which beneficiated ilmenite ore was smelted in a continuous, three-phase, 250 kv.a., open-top electric furnace. Minus %. inch ore was smelted, using the stand
Jan 1, 1957
-
A review of problems in optimizing extraction in gold heap leachingBy P. L. Lehoux, R. F. Lopes
"Unanticipated low recovery or extraction of gold from heap leachable are can often be attributed 10 phenomena such as non-uniform percolation (channelling) of solution through heaps, excessively slow
Jan 1, 1989
-
Taking Inco into the 90sBy Walter Curlook
"With Inco recording record profits over the past year, most people have forgotten the painful years of the last recession/depression when Inco was losing up to a million dollars a day for a short per
Jan 1, 1990
-
Advances in technology for complex custom feed material treatment at NorandaBy G. Kachaniwsky, M. Bédard
"The Noranda Continuous Smelting Process at the Home smelter was commissioned in March 1973. The ability of the process to handle a wide variety of feed materials and a steady stream of technical inno
Jan 1, 1991
-
Uniform Corrosion of Titanium under Medium Temperature Chalcopyrite Concentrate Leaching ConditionsBy A. Alfantazi, E. Asselin
"The corrosion of commercially pure titanium (CP-Ti) was studied from room temperature up to medium temperature (~160°C) under conditions relevant to medium temperature chalcopyrite leaching processes
Jan 1, 2012
-
Optimization of Sputtered Ti/Mo/ Au Metallization System for Solder BondingBy S. Akhlaghi
In many electronic/optoelectronic devices, interaction between the metal stack and solder is undesirable. If a reaction happens, a nonuniform joint containing spikes and voids is likely to form and as
Jan 1, 2006
-
Numerical Simulation of Rock Blasting Phenomena in Small Scale Using SPH"A numerical procedure based on Smoothed Particle Hydrodynamics (SPH) is developed for rock blasting phenomena involving multiple intersecting joints. In this procedure, an elasto-plastic damage const
Jan 1, 2015
-
Spectroelectrochemistry of Enargite II: Reactivity in Acidic SolutionsBy H. Huang, R. N. Gow
Acidic treatment of enargite (Cu3AsS4) dissolves both arsenic and copper from the mineral and then attempts to separate them in the leach solution. The reactivity of enargite was examined in acidic to
Jan 1, 2014
-
Optimal Synthesis of Energy Supply Systems for Remote Open Pit MinesBy M. Carvalho
The primary motivation underlying the proposal of polygeneration systems for mine sites is to increase the efficient use of natural resources by combining different technologies and energy resources w
Aug 1, 2013
-
Corrosion Behavior of Sintered NdFeB Permanent MagnetsBy K. S. Raja, B. Pesic, S. Kshetri
"We investigated the electrochemical corrosion behavior of commercial permanent magnetic material (NdFeB alloy) in 0.1 M NaH2PO4 solution (pH:4.75) containing 0 – 1000 ppm of chloride at room temperat
Jan 1, 2012
-
Instrumentation of Hydrabolts for stress change monitoring in burst-prone groundsBy Fidelis T. Suorineni
HydraboltTM is a Swellex-type dowel support element developed and manufactured by New Concept Mining in South Africa. Like Swellex, the HydraboltTM is a folded tube which can be inserted into a larger
Oct 1, 2010
-
CIMVal 2003 (Canada) - CIM Standards and Guidelines for Valuation of Mineral Properties (2003)"These standards were developed by the CIM for use with the value or worth of a Mineral Property as opposed to “evaluation” where the key objective is an economic assessment or determination of the ec
Jan 1, 2003
-
Grinding Circuit Design for Similco Mines (c92aaacb-9754-4479-979f-50ce395c95a4)By Ken Major, Anita Marks, Craig Sams
In 2007 Copper Mountain Mining determined that there were sufficient resources to consider reopening the Similco Mine near Princeton, BC. The mill facility that had been built by Newmont Mining in 197
Jan 1, 2012
-
Research and Practice of the Strengthening Treatment of Geological Defects in Foundation of 305 Meters High Arch Dam in Jinping I Hydropower Station on the Yalong RiverBy Shengwu Song, Xuemin Feng
Jinping I hydropower station is located in Sichuan Province in Southwest China. It is built on the Yalong River as a controlling cascade hydropower station in the middle and lower reaches, with power
Jan 1, 2015
-
New Approach for Applying Confining Stress to a Bonded-Particle ModelBy Shantanu Patel, C. Derek Martin
"The objective of this work is to develop a practical numerical approach for applying the confining pressure to discrete element cylindrical triaxial tests. A layer of membrane particles with very low
Jan 1, 2015
-
Radioisotope Gauging ? the 1n Mining IndustryBy Bruce W. Smith
Non-contacting, radioisotope density and level gauges are discussed. The characteristics of the more commonly used isotopes, the techniques of detection and the methods of presenting information are r
Jan 1, 1964
-
Development of Advanced Titanium Alloys for Aerospace, Medical and Automotive ApplicationsBy Technische Universität Braunschweig, K. Saksl, J. Furste, P. Eschenbacher, F. Brunke, D. Wolter, M. Kohnke, C. Siemers, J. Kiese, M. Schlemminger
"In general, titanium alloys combine outstanding mechanical properties with corrosion resistance and biocompatibility and are, therefore, used in many challenging applications. Nevertheless, for speci
Jan 1, 2016
-
Investigation of the Silica Slag of Norddeutsche Affinerie's Flash FurnaceBy T. Loos
The Norddeutsche Affinerie operates an Outokumpu-Flash-Furnace as a smelting unit. The pyrometallurgical slag cleaning process is based on the slag reduction and settling in the electric furnace. Sinc
Jan 1, 2007
-
Process Development for the Recovery of Critical Materials from Electronic WasteBy P. Keller, T. E. Lister, G. G. Clark, L. A. Diaz
As electronic technology continues to evolve there is a growing need to develop processes which recover valuable material from antiquated technology. This need follows from the environmental challenge
Jan 1, 2016
-
Metal Vapor Treatment for Platinum Group Metals from Spent Automotive CatalystBy Y. Mitsuda, Y. Kayanuma, T. H. Okabe, M. Miyake
A new process to recover platinum group metals (PGMs) from automotive catalyst scrap using metal vapor was developed. To improve the efficiency of the acid dissolution process of PGMs, metal vapor of
Jan 1, 2004