Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Wangaloa Coal Mine Rehabilitation - The First Six MonthsBy D Craw, C E. Martin, C Smith, C Rufaut
Wangaloa Coal Mine opened in 1945, and by the time of its closure in 1989, had produced 750 000 tonnes of coal and disturbed an area of 75 ha. The original mining licence required land rehabilitation
Jan 1, 2003
-
Post-Mine Leaching of Galena and Marmatite at Broken HillBy Blanchard R
In stopes of the 2000- and 2150-ft. levels in the North mine section of North Broken Hill Limited, whence a substantial proportion of the company's production is being drawn, and especially in st
Jan 1, 1942
-
Investigations on the Sulphur Content of Pig IronAn investigation into the causes of variable sulphur content in blast furnace metal produced at No. 4 blast furnace at the Port Kembla works of Australian Iron and Steel Pty. Ltd. was carried out. The
Jan 1, 1961
-
-
Concentration of Silver-Lead OresThe following brief paper is intended, to apply to the concentration of the silver-lead ores at Broken Hill, New South Wales, generally, but more particularly to the process as applied to the ores in
Jan 1, 1904
-
Temperature Sensitive Polymers as Efficient and Selective Flotation CollectorsTemperature Sensitive Polymers as Efficient and Selective Flotation Collectors
Sep 13, 2010
-
Optimization techniques for the open pit limit problemBy Giannini M
Of the optimization techniques proposed in determining the optimum open pit limits, dynamic programming and graph theory have proved most successful. However, publications on these two methods lack a
Jan 1, 1986
-
Stope Stability at the Big Gossan Skarn Deposit, Papua, IndonesiaBy G de Jong, W Sunyoto, K Sari, P Silalahi
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Big Gossan mine is operated by PT Freeport Indonesia and is one of the largest stope-an
Mar 18, 2015
-
Women as Mine Managers – a Utopia?By M Quinteiro, Å Sundqvist
What is special about being a female mine manager? We do not believe that the challenge is greater for women in managing a mine compared to managerial positions in other male-dominated businesses. The
May 9, 2016
-
Cenosphere Formation during the Combustion of PyriteMagnetite cenospheres 40-270 I/m in diameter have been found during the combustion of pyrite concentrate.Micrographs of the surface and internal structures are presented together with comment on the m
Jan 1, 1980
-
Development of the Use of Roaster (SO2) Gas in the Treatment Plant at Gold Mines of Kalgoorlie LimitedBy Penrose E. K
With the exception of occasional periods, when up to 80% of oxidized ore was treated, the G.M.K. plant treated all sulphide ore until October, 1939. The treatment was, briefly, as follows:The ore was
Jan 1, 1942
-
Financing the Channar ProjectBy Parker JB
The Channar Iron Ore Mining Project (the Project) is a joint venture involving the Hamersley Holdings group (Hamersley) and the China Metallurgical Import and Export Corporation (CMIEC). The Projec
Jan 1, 1989
-
The development and future of BHP Billiton’s Western Australian iron ore geological reconciliation systemBy S J. Loach
Geological reconciliation is an indispensable part of BHP Billiton’s Western Australian Iron Ore (WAIO) operations. Since 2009 our reconciliations have been calculated in a single, centralised sequel-
Jul 24, 2017
-
Utilisation of Latrobe Valley Brown Coal Fly-AshBy Milner A, Brockway D, Hodges S
The combustion of brown coals in Latrobe Valley power stations produces approximately 500 000 tonnes of solid wastes each year. This material, which includes precipitator ash, char and furnace ash,
Jan 1, 1992
-
Stratigraphic, Mineralogical and Physical Variations at Waikato - North Head, South Auckland: Preliminary ResultsBy D Pastars, J L. Mauk
Located at the southern end of the Awhitu
Jan 1, 2001
-
Integrated Mining and Metallurgical Planning and OperationBy P L. McCarthy
To design and operate a successful mine the technical specialists must agree on what is ore, what is not ore, and how quickly the orebody is to be mined and processed. These seemingly simple questions
Sep 7, 2015
-
Hydrologic and Environmental Changes in the Gippsland BasinThe Gippsland Basin, southeastern Australia, has an Upper Cainozoic history of episodic change of hydrology and the related environment, reflected in the geomorphology and surficial deposits of the
Jan 1, 1992
-
Understanding Trends in Performance of Open Cut Mining EquipmentBy G Lumley
PlannersÆ optimism (or maybe commercial necessity) means that most mine plans use equipment rates that are rarely achieved (Lumley and Beckman, 2009). This lack of understanding of what equipment actu
May 24, 2012
-
Iron Ore Fines to Slabs via the MIDREX« Direct Reduction Process in Western AustraliaBy Pupazzoni P. D, Meissner D. C
Incorporating an iron ore pelletising plant, a MIDREX'"' Direct Reduction Plant, and a mini mill, the conversion of iron ore fines to high- quality steel slabs in Western Australia is among
Jan 1, 1999
-
The New Office and Changehouse Building at the Zinc Corporation Limited, Broken Hill, N.S.W.The object of this paper is to give a description of the new office and changehouse building and equipment at the Zinc Corporation Limited, the office section of which has now been in full use for app
Jan 1, 1941