Design of Mine Winding SystemsBy Deutsch G. P
The output of an underground mine often depends entirely on the mine winding system. -Decisions made--at the design stage affect the economy and operation'of the mine'.througb -its entir
Jan 1, 1973
-
Slope Stability Radar for Monitoring Mine WallsSlope stability is a critical safety and production issue for open cut mines. The æslope stability radarÆ has been developed to remotely scan a rock slope to continuously measure the movement of the f
Jan 1, 2003
-
A Laboratory Facility For Testing Cemented FillsThis case study describes various aspects of establishing a laboratory facility for testing chemically-cemented fill materials. The applicability of data obtained from such a facility related to m
Jan 1, 1973
-
Operation of Filter Presses for Tailings DewateringBy D Pepper
Despite the limited literature regarding the pressure filtration of mine tailings (compared to the large number of papers published each year on paste thickening of tailings) the number of mines dry s
Oct 29, 2012
-
Rock-Masses Characterization for Underground Excavation PurposesDuring the development of Lorca tunnel project in the South-East of Spain, an in-site study has been done, with the purpose of obtaining the characteristics of the different lithological units th
Jan 1, 1987
-
Scale Up Relations for Industrial Ball MillsBy Whiten W. J
Data from ball mills of a wide range of sizes are analysed using detailed mathematical models and non-linear least squares fitting techniques. In this way model parameters are obtained describing the
Jan 1, 1982
-
Direct Force Measurement for Bubble-Particle DetachmentBy R-H Yoon
Increasing the upper particle size limit of flotation would allow operators to increase mill throughput, save operating costs, simplify flow sheets, and increase rate of return. However, coarse partic
Jan 1, 2005
-
Managing coal Mines for Profit not ProductionThe education system today is turning out potential Mine Managers and Superintendents for the coal industry who are lacking in adequate management knowledge. They are required by the Mining Act to
Jan 1, 1980
-
Direct gold measurement for bulk ore sortingBy Y V. Haarlem, P Coghill, N G. Cutmore, M Millen, I Carter
Due to the low concentration of gold, ore sorting for gold has always required measuring indirect properties, such as density or colour, to allow separation on a rock by rock basis. This only works on
Nov 10, 2020
-
Evaluation of Sampling Methods for Industrial SlurriesBy Patridge A. C
A pilot scale laboratory investigation of manual slurry sampling methods representative of those used in the minerals industry is described. Samples were taken from slurries made up from silica part
Jan 1, 1995
-
Borescope Techniques for Assisting Colliery Roof ControlBy Rixon LK, Walton KP
Evidence will be presented to show that borescope inspection of mine roofs is one of the most useful techniques available for stability assessments. ACIRL currently has four borescopes, comprising
Jan 1, 1986
-
Unpredictable Gassiness Changes During Longwall ExtractionBy Kerkhoff G, Wood J
The maximum gas emission into underground workings can be predicted by the use of established methods which have world wide recognition. Changes in gas emission and the influence of the gas and g
Jan 1, 1988
-
Morwell Open Cut: Mine Scheduling (36eba653-885d-47b0-b25f-6e2b458bad34)By Brimblecombe P
Morwell Open Cut is a continuous mining operation employing 5 buck- etwheel excavators, I bucket chain excavator and 54 conveyors. The combined bunkering capacity at both client Power Stations repres
Jan 1, 1989
-
SRS-1200, shaft rescue system with intrinsically safe communications and gas monitoringBy B Stewart
The SRS-1200 concept came about following the recommendations from the Board of Inquiry into the 1994 Moura No 2 mine disaster with the aim of having a system to remove personnel from an unsafe enviro
May 5, 2022
-
Ventilation Design and Practice at the Olympic Dam Mine, South AustraliaBy Clarke B. N
The Olympic mine is currently and development to 1988. The mine practice is, and number of factors. Dam copper-uranium-gold undergoing construction start production in May ventilation design a
Jan 1, 1988
-
Activity Models for Pyrometallurgical Processes Using STEPSOLBy Morris A. E
The thermodynamically-based pyrometallurgical simulation software STEPSOL (Version 3.0) provides for the modelling of activities using the Interaction Parameter Model, the Regular Solution Model, th
Jan 1, 1991
-
Microtunnelling Solution for Bulimba Creek Trunk SewerBy A Domanti, C Jewkes
This paper describes the design and constructability issues investigated in the selection of a trenchless solution in comparison to trenched construction options as part of a scoping study for the aug
Jan 1, 2008
-
A Case Study into the Treatment of Low Grade Austalian Gold Ores Heap Leaching vs Carbon-in-PulpBy Noakes MJ, Willsteed TV
In the past few years an elevated gold price has resulted in the evaluation of many small scale surface gold deposits in Australia typically containing about 2-3 g/t Au. Operators have tended to assum
Jan 1, 1984
-
Martabe Gold Mine, Indonesia: a positive solution for positive reconciliationBy M Angus, S Konopa, A Virisheff, S Crispin
A positive mill reconciliation at a mine is a double-edged-sword. Much back slapping happens. The bank and the board can’t get enough until the downside becomes apparent. Over a prolonged period, ther
Nov 21, 2018
-
Calibration of Parameters for Estimating Sampling VarianceBy P K. M Mazzoni, D Frantois-Bong
This paper aims to show alternatives to the estimation methods used for finding the parameters in GyÆs well known model for sampling variance in the case of particulate materials. Many experiments des
Jan 1, 2005