Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Mining's Image in the Twenty-First Century

    Last September, when I was asked to prepare this paper, I was told the subject was "mining," a broad subject indeed! Rather than choose one of the many important technical and economic details whic

    Jan 1, 1991

  • AUSIMM
    Issues in Capital Raisings and Disclosure

    By B Dodd

    This paper details how the Australian Securities and Investments Commission (ASIC), as a disclosure and conduct regulator, approaches regulation of continuous disclosure, capital raising and control t

    Nov 20, 2012

  • AUSIMM
    Declining At Mount Windarra Mine With Emphasis On Advancing Through Major Shear Zones

    Declining from surface provides access, haulageway, ventilation and provision for ser- vices for stoping and development. Three boom jumbos and 3.8 m3 capacity diesel loaders are used in decline de

    Jan 1, 1977

  • AUSIMM
    Draw Control Optimisation along the Production Drift in Sublevel Caving Mines

    By A Gustafson, G Shekhar, P Boeg-Jensen

    The amount of material extracted from each blasted ring in sublevel caving mines is vital when deciding the overall mine production target. The orientation of the production drifts is normally perpend

    May 9, 2016

  • AUSIMM
    A process-based approach to mine rehabilitation decision making using Bayesian modelling and risk-based principles for dispersive spoil rehabilitation

    By E Thomas, L McCallum, G Dale, J Bennett, K Reardon-Smith, S Raine

    Sustainable closure of coal mines in Australia to a safe, stable, non-polluting condition remains one of the industry’s biggest environmental and social challenges. A significant proportion of mines i

    Jul 25, 2018

  • AUSIMM
    When Nothing is What You Need – The Importance of Using Blanks at All Stages of Sample Preparation

    By J Webb

    "It is vitally important in projects where the cut-off grade is low that there is no contamination during the sampling and sample preparation process, both in the ore and the waste zones. Failure to i

    Jul 29, 2014

  • AUSIMM
    Computer Simulations to Enable Continuous Blending to Two Plants at Sishen Mine From the Medium-Term Point of View

    Sishen uses a state-of-the-art tracking system to track material from its position in blast blocks through various stockpiles and crushers. Qualities are blended directly to the crusher as opposed to

    Jan 1, 2005

  • AUSIMM
    Cost-Effective Means for Identifying Acid Rock Drainage Risks - Integration of the Geochemistry-Mineralogy-Texture Approach and Geometallurgical Techniques

    By D J. Bradshaw, B Lottermoser, A Parbhakar-Fox

    "Best practice for acid rock drainage (ARD) risk assessment still relies solely on the geochemical properties of sulfidic rocks and mineral processing products, despite the fact that a rockÆs tendency

    Sep 29, 2013

  • AUSIMM
    Taming the dragon – the art of transitioning from reactive to proactive tailings management through strategic operator engagement

    By C N. Hatton, K Ward

    Tailings operations are inherently reactive as operations personnel continuously contend with a concentrator reject feed (tailings) transient in physical and engineering properties, which places a con

    Jul 1, 2021

  • AUSIMM
    Dynamic influences of optimisation on emissions

    By P J. Bangerter, J Pan

    Optimising for Net Present Value (NPV) with a strategic optimiser such as COMET, Prober-E, Blaser or Minemax has hitherto lacked a dynamic method for analysing the so-called third-order outcomes (such

    Aug 2, 2023

  • AUSIMM
    Can biocements stabilise tailings storage facilities?

    By G Simpson, S Dressler, A E. Levett

    Tailings storage facilities often represent a mining operation’s most significant liability, posing serious environmental, social and safety risks. Almost all mining operations dispose of wet tailings

    Aug 2, 2023

  • AUSIMM
    Obstacles to Embedding Geometallurgy Decision-Making into Operations and how to Increase Maturity of this Critical Capability

    By G McCullough, B Mutsaers, J Jessop

    "*This is an abstract only* Geometallurgical initiatives have demonstrated considerable value to operations that have trialled them. However, it is extremely difficult for these initiatives to become

    Sep 29, 2013

  • AUSIMM
    Risk Assessment of Consumables Supplies Management in Mines

    By M J. Pejovic, S BoÜevski, I Miljanovic, M Hudej, A Milutinovic, A Petrovski

    The paper deals with the problem of managing the supplies of consumables (energy resources, lubricants, explosives, explosive supplies, tires, spare parts, etc) in mines. After the introductory remark

    Sep 26, 2011

  • AUSIMM
    From ‘closing a mine’ to ‘transitioning a community’ – evolving from specific post-mining land-uses to a holistic post-mining vision

    By A Maier, M Goldner, C Gimber

    Given the ongoing global crises of climate change and nature loss, with the World Economic Forum (WEF) identifying them as the top risks to global economies in terms of both likelihood and impact in t

    Aug 2, 2023

  • AUSIMM
    Measuring the influence of a sublevel cave on open stoping at Telfer

    By J Maxlow, M J. Woods, M P. Sandy

    The Newcrest Mining Limited Telfer operation comprises both open pit and underground operations producing gold and copper. The underground operation is made up of three production areas, the sublevel

    Nov 29, 2022

  • AUSIMM
    Landscape-scale Assessment of Watercourses in Remote Arid South Australia to Inform Mine Planning to Mine Closure

    By K White, C Ferguson, M Harding

    Understanding watercourses and river processes at a landscape scale is vital for managing risk to mining infrastructure and operations as well as minimising future environmental impacts beyond the lif

    Jun 28, 2016

  • AUSIMM
    Interactive Modelling and Visualisation of Large Deposits Using Linear Octrees

    Large deposits present computational challenges to todayÆs commercial orebody modelling systems that are based on conventional block models. We describe a system that is specifically engineered to mod

    Sep 26, 2011

  • AUSIMM
    Control of Water Discharge From Mine Ventilation Shafts

    Problems caused by water discharge from surface mine ventilation shafts can be significant and are usually unforseen. The discharged water is often hyper-saline or acidic and can cause environmental d

    Jan 1, 2002

  • AUSIMM
    Strategic short-term geotechnical design

    By K T. Mandisodza, T J. Cartledge

    The principal objective of Geotechnical Engineers supporting operating mines is to provide safe working conditions and ensure that pit designs are geotechnically optimised to site conditions and pre-d

    Jun 22, 2022

  • AUSIMM
    Truck Haulage Improvements at the Phu Kham Mine – the Journey to 97 per cent Utilisation of Availability

    By S P. Young, K R. Monro

    Reducing metal prices have forced mining operations to become more efficient and innovate in order to do more with the existing base. Much of this effort has focused on improving the efficiency of loa

    Jun 22, 2016