Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Geomorphic design and landscape evolution modelling for best practice mine rehabilitation

    By G R. Hancock, J F. Martín Duque

    Post-mining landscapes are required to geomorphologically and ecologically integrate with their surrounds (Martín Duque et al., 2015). Designing and constructing an erosionally stable landform is

    Jul 25, 2018

  • AUSIMM
    The Foundation of the Institute, and its First Ten Years

    When Matthew Flinders entered in his log `This land forms the South side of the large bight; and besides projecting beyond the coast line, and being a little higher than usual is remarkable for having

    Jan 1, 1993

  • AUSIMM
    Why I don’t believe in reconciliation

    By S Dunham

    For decades we’ve been focusing on reconciliation as a tool to validate mineral resource estimates. And for decades we’ve been misleading ourselves. The concept of reconciliation is simple. Predict, m

    May 24, 2023

  • AUSIMM
    Ambient Temperature Oxidation of Enargite

    By N J Welham

    A commercial enargite concentrate was mechanically milled in inert and oxidising atmospheres for 10 hours. No substantial effect was observed in either an inert atmosphere or in air other than a broad

    Jan 1, 2001

  • AUSIMM
    Modelling metal recovery by co-kriging the feed and concentrate masses of metal

    By P Dowd, A Adeli, C Xu, X Emery

    Geometallurgical modelling is increasingly being incorporated into mineral resource modelling and estimation as a means of increasing efficiency, decreasing operating costs and reducing risk in mining

    May 24, 2023

  • AUSIMM
    Assigning Value to a Drill and Blast Wall Control Program Through Reduction in the Risk Profile

    By S B. Sheldon

    Wall control programs tend to be expensive and consequently require financial justification in order to get approval for the expenditure required. The difficulty faced in getting this approval is that

    Nov 8, 2011

  • AUSIMM
    The Geomet Curve – A Model for Implementation of Geometallurgy

    By J Vann

    Geometallurgy is inherently multidisciplinary and it gains its power to deliver improved outcomes for the minerals industry by bridging silos between disciplines. This cross-disciplinary approach unlo

    Sep 5, 2011

  • AUSIMM
    Modelling of the Ventilation System of a Deep Uranium Mine

    By S C. Bhowmik, R Gupta

    This paper presents the ventilation problem faced by Jaduguda uranium mine, operated up to a depth of 905 m. The first two stages of the mine workings are up to 555 m, which are nearly exhausted. The

    Jan 1, 2005

  • AUSIMM
    Legacy tailings dams – asset or liability? A case study on sub-aqueous tailings reclamation

    By M Jones

    Legacy tailings storage facilities exist within operating mine sites across Australia. These tailings storage facilities are often viewed as rehabilitation liabilities but with considered assessment m

    Sep 1, 2024

  • AUSIMM
    Applications of Advanced Remote Sensing Systems during a Mine Life

    By B P. Banerjee, S Raval

    In the recent past there have been dramatic advancements in the development of remote sensing platforms (satellite, aircraft and unmanned aerial vehicles – UAVs) as well as sensor systems (multispectr

    Jun 28, 2016

  • AUSIMM
    Building a Geometallurgical Model for the Canahuire Epithermal Au-Cu-Ag Deposit, Southern Peru - Past, Present and Future

    By M Dusci, A Trueman, S Poos, R Baumgartner, M Brittan

    The Canahuire epithermal Au-Cu-Ag deposit in southern Peru is a complex and challenging deposit for metallurgical studies. It has issues of gold locking in sulfides and non-sulfides, deleterious eleme

    Sep 29, 2013

  • AUSIMM
    Sampling and Analysis for Public Reporting of Portable X-ray Fluorescence Data Under the 2012 Edition of the JORC Code

    By G M. Jeffress, D C. Arne

    There are two discrete aspects to collecting portable X-ray fluorescence (pXRF) data to obtain reliable results and to comply with reporting requirements under the 2012 edition of the JORC Code (JORC,

    Jul 29, 2014

  • AUSIMM
    Lihir Gold Five Years On ù Maximising Throughput and Capital Utilisation

    During the first five years of operation, the Lihir gold mine has steadily increased plant throughput rate to over 4 Mtpa, well above the original design capacity of 2.8 Mtpa. Understanding how future

    Jan 1, 2003

  • AUSIMM
    Innovative digital tools shaping the future of sustainable sprayed concrete operations and operator training

    By P Oikkonen

    Sprayed concrete has played an integral role in underground rock support for nearly a century. However, concrete is also considered to be one of the biggest environmental problems in construction and

    Mar 29, 2023

  • AUSIMM
    Geomembranes – from design to handover and some of the lessons learnt

    By A Marta

    Geomembrane (GMB) liners are being used more frequently for the storage or capping of mine waste due to stricter regulatory requirements relating to environmental protection. The longevity of any li

    Jul 23, 2018

  • AUSIMM
    Independent Decline Haulage at Kanowna Belle Gold Mines

    In May 2000, Kanowna Belle Gold Mines (KBGM) carried out a detailed Truck versus Shaft Haulage Study. The study showed that whilst the shaft option had many operating cost benefits the capital costs w

    Jan 1, 2002

  • AUSIMM
    Particle Density Meter

    By R Nicholson, N D. Cox, N W. A Lambert

    "This paper reports on the long-term operation of a particle density meter (PDM) at the Bloomfield coal handling and preparation plant (CHPP). This unit has been operating continuously for over three

    Oct 10, 2016

  • AUSIMM
    Elevating geotechnical considerations in the Australian underground coal industry and mine planning process

    By T Stambolie

    Mine planning processes are continuously evolving, increasing in complexity, and are required to be developed in shorter timeframes, often missing important steps in the process. Underground coal mine

    Nov 30, 2018

  • AUSIMM
    Why risk assessment and safety climate measurement are essential for psychosocial safety

    By A Fern, A Hawkes, o, T Vincent

    The modern workplace has changed dramatically in recent years with an increased emphasis on the psychological well-being of employees. While adhering to a certain standard of psychosocial safety at wo

    Apr 16, 2024

  • AUSIMM
    Geotechnical Models and Data Confidence in Mining Geotechnical Design

    By M J. Dunn

    The geotechnical model is the cornerstone of any mining geotechnical design and as such the confidence level and reliability of the geotechnical model is paramount. The geotechnical model confidence l

    Nov 5, 2014