Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Automated omission-free geotechnical deformation monitoring – a new method deployable by non-specialistsBy J Franke, C Gonzalez
One of the regular tasks of geotechnical and mining engineers is the measurement and management of deformation in underground excavations. Although several methods are used to do so, the incumbent met
Nov 29, 2022
-
Research on the Shape and Particle Size Distribution of Caved Ore Mass in Sublevel CavingBy G J. Zhang
The shape and particle size distribution of caved ore mass in sublevel caving were investigated in this study. The paper first reviews the main factors affecting the shape and characteristic of caved
Jul 11, 2011
-
Incorporation of a Full Process Plant Model as an Active Constraint for Mine Planning and Production SchedulingBy P Cesare, S Munro, D Wandel, R A. Bearman
Consideration of the processing plant operational envelope is a key factor in production scheduling,and therefore mine planning, for any mining operation. In many cases hard-wired or regressionbased t
Nov 24, 2014
-
Strategic thinking about long-term ‘above ground’ orebody complexity using scenariosBy T Craske, J Sykes, T C. McCuaig, M Jessell, A Trench
The prevalent strategic approach in the mining industry is one of planning. However, it is widely recognised that planning does not work in complex and uncertain situations (Mintzberg, 1994), such as
Nov 21, 2018
-
Driving Mine Performance through CommunicationBy S Jeffrey, S Mundell, F Arboleda
In the current cycle of low commodity prices and rising costs, mine managers continue to focus on optimising mine performance and productivity. A critical component of strengthening performance and pr
Jun 22, 2016
-
Mine closure bonds (financial assurances) – the ‘how much?’ conundrumBy G Byrne, A Bowden
There is often a difference in opinion about the allocation of risk in the establishment of mine closure bonds or financial assurances. From the State’s perspective, protection is needed to ensure tha
Jul 25, 2018
-
Anglo Coal Australia ù Graduates and the FutureAnglo Coal Australia (ACA) takes a proactive position with regards to attracting and retaining employees at a graduate level. Currently, ACA has graduates in its program across all disciplines: Mining
Jan 1, 2005
-
An Alternative Circuit for Chalcopyrite-Pyrite Ores with Elevated Pyrite Content in Cu-Au Ore TreatmentBy S Farrokhpay, C Akop
Copper-gold-pyrite ore types with an elevated pyrite head grade utilise a sequential flotation circuit to recover initially a copper-gold concentrate with a pyrite-gold concentrate being produced from
Sep 1, 2014
-
Now to the Future – A Path Toward the Future MineBy I Gipps
Each of us has a vision of what the future mine will be and, generally, these visions have many similarities and some differences. One of the major discrepancies in visions of the future mine is not t
Nov 22, 2011
-
Improving compliance in mining through an effective geoscientific information management frameworkBy S Mundell, A Atkins, S van de Water
Geoscientific information management enables the capture, management and delivery of the original geoscientific observations and measurements of the earth’s natural resources. However, original observ
Nov 8, 2021
-
Protection of ?Tunnels in their Future EnvironmentBy A L. Bennett
It is well understood that designers and constructors must protect the existing surroundings of tunnel construction, particularly in the selection of excavation methods, ground support and waterproofi
Sep 17, 2014
-
Automated joint mapping using the concentric shells algorithmBy P Valenzuela
Joint mapping is a fundamental input for rock mass characterisation and slope stability analysis. The usual way to do it is using a compass in the field or digitising structures on a screen, with a so
Sep 20, 2017
-
Integrated drawbell and undercut scheduling using a computational tool at the Grasberg block cave mineBy C A. Brannon, C A. Dipas, H A. Vega, D Villa
The development and construction of the Grasberg block cave mine (GBC) is in progress, currently targeting initiation of caving in late 2018. Current production planning anticipates ramping up to full
Oct 16, 2017
-
Synergies between renewable-powered mines and community development programs throughout mine life cycle and post-closureBy J Joughin, D Kyan, L Rollin
In line with the 2015 Paris Agreement and corresponding climate disclosure requirements, many mining companies have publicly disclosed that they are developing and/or implementing ambitious decarbonis
Aug 2, 2023
-
Benchmarking – Does it have a Role in Improving the Performance of Mining Geology?By M Berry
Many mining companies routinely use benchmarking to review their operational activities and associated costs. The aim is to measure operational performance against industry norms, and identify areas w
Aug 18, 2014
-
Development of an Integrated Platform for the Analysis, Modelling and Design in Panel Caving MinesBy G Pizarro, O Miranda, D Rosales
In panel/block caving mines, large amounts of information are collected at the operations. This information includes grades and extracted tonnage, fragmentation, lithology, design of stopes and main i
May 9, 2016
-
Geotechnical Reporting at Olympic Dam MineThe need for formalised geotechnical reporting has not been fully explored at many operations. With the continuing need to provide safer and more efficient workplaces, the requirement for good geotech
Jan 1, 2004
-
The Status of Implementation of Proximity Detection Systems in Underground MinesBy D Kent
The introduction of digital technologies into the underground mining industry, in both coal and hard rock mining, has enabled many high bandwidth applications to be adopted by mines.Digital networks b
Mar 21, 2011
-
Housing Stress and Location Choices in Bowen Basin Mining Communities - A Case Study of MoranbahBy S Lockie, G Ivanova, J Rolfe
One of the consequences of mining expansion in the Bowen Basin region of Central Queensland in Australia has been a substantial increase in demand for housing, with subsequent impacts on housing and r
Jan 1, 2009
-
New Mines in the New Age ù The Two Risks of Environmental Impact AssessmentEIA is a test of a development proposalÆs legitimacy and asks two questions: not only æis the proposal competent?Æ but also ædoes the proposal have moral authority?Æ For reasons of miningÆs historic i
Jan 1, 2004