Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Geology and Mineralisation of the Chatree Epithermal Gold-Silver Deposit, Petchabun Province, Central Thailand

    By W Lunwongsa, S Meffre, S Nuanla-ong, K Zaw, R James, A Salam

    Gold and silver mineralisation at the Chatree low sulfidation deposit is hosted in andesitic volcanic and volcaniclastic rocks and characterised by multiple hydrothermal alteration assemblages and qua

    Jan 1, 2008

  • AUSIMM
    CITIC concentrate performance in pelletising and sintering

    By L Y. Yang, Z Wang

    This work presents the fundamental properties of CITIC magnetite concentrate and its performance in pelletising and sintering. CITIC concentrate has been widely used in pelletising to produce pellets

    Nov 8, 2021

  • AUSIMM
    A decision framework for comparison of coal void rehabilitation options

    By A Hocking, S Henderson

    Commonwealth of Australia (2016) defines rehabilitation as comprising “the design and construction of landforms as well as the establishment of sustainable ecosystems or alternative vegetation, depend

    Jul 25, 2018

  • AUSIMM
    The Introduction of Axis at Black Star Open Cut

    By M Gabbitus, B Young, T Lukins, M Slater

    This paper details the implementation of a new type of grade control system at the Black Star open cut mine in Mount Isa, Queensland. It explores the site requirements for grade control, what as previ

    Sep 18, 2012

  • AUSIMM
    Quantification of Drill Hole Deviation – Century Mine Case Study

    By C D. Pocock

    Maintaining catch berm capacity in open pit mines through controlled blasting prevents production delays associated with managing risks associated with wall instability. A method has been developed to

    Nov 8, 2011

  • AUSIMM
    Repurposing flotation capacity at Mt Keith nickel concentrator

    By L Hussey

    Mt Keith concentrator treats low grade disseminated nickel sulfide ore supplied from the adjoining open pit mine. It is a traditional crushing, two-staged closed circuit grinding circuit (SAG & Ba

    Sep 11, 2017

  • AUSIMM
    The value of data – getting it right from the start!

    By S L. Martin, M Wimberger

    The binary indicator coding of assay and lithological data according to a single criterion or multiple criteria is a powerful technique for representing mineralised shapes through the modelling of pro

    Mar 22, 2022

  • AUSIMM
    Blast Design Using Measurement While Drilling Parameters

    By M Higgins

    Measurement while drilling (MWD) techniques can provide a useful tool to aid drill and blast engineers in open cut mining. By avoiding time consuming tasks such as scan-lines and rock sample collectio

    Jan 1, 2001

  • AUSIMM
    Computing Education of Graduating Mining Engineers

    By Upfold RW, Nguyen VU

    The extraction and utilisation of metals and materials is the basis of modern civilisation, and will remain so for many decades, Traditional metals are facing some challenges and research is needed

    Jan 1, 1986

  • AUSIMM
    Rewriting the rule book – geology organisational design

    By T McLeod, B Catto

    AngloGold Ashanti Australia’s (AGAA) Tropicana gold mine (TGM) geology department seized the rare opportunity of building a new geology department for a new operation: the philosophy, the people and t

    Sep 20, 2017

  • AUSIMM
    The Use of Non-destructive Testing to Identify Defective Rock Bolts – A Case Study

    By B Jones, M Chappell

    Permanent rock bolts used to support rock tunnels are required to perform for the design life of the structure as a minimum. Quality of installation is critical to the performance over the life of the

    Sep 17, 2014

  • AUSIMM
    Mine Data Analytics – New Skills Required for Tomorrow’s Mines

    By P Knights

    This paper examines the process and specialised skills required to extract insight from data routinely collected by mine operations, maintenance, engineering and environmental departments. Typical ins

    Nov 22, 2011

  • AUSIMM
    A HPGR pseudo-dynamic model approach integrated with real-time information for pressing iron ore concentrates in industrial-scale

    By T M. Campos, H A. Petit, L M. Tavares, R Olympio

    Much practical experience has been gathered in the last 30 years of application of high-pressure grinding rolls (HPGR) integrated with ball milling in size reduction of fine iron ore concentrates. The

    Aug 24, 2022

  • AUSIMM
    Real-Time Image Analysis of Iron Ore Cores and Drill Chips to Complement Spectral Measures

    By T Belligoi

    Diamond cores and drill chips provide the only direct physical evidence for ore containing rocks. Early characterisation of cores and drill chips is important as it provides critical information for d

    Jul 11, 2011

  • AUSIMM
    Thickening at Karara – The Role of Test Work and Innovative Design

    By G Hart

    As the iron ore/magnetite boom gains momentum, it is particularly important to question established past trends and explore the potential of alternative design options. Traditionally, ‘rule of thumb’

    Jul 11, 2011

  • AUSIMM
    A theoretical goaf resistance model based on goaf gas drainage data

    By Y Wang

    Inadequate goaf gas control may lead to gas exceedances in the ventilation return air, which will trip power in longwalls and cause production stoppage. To effectively control gas emissions, Australia

    Oct 12, 2022

  • AUSIMM
    An Alternative Approach for Assessing In Situ Stresses in Sydney

    By D A. F Oliveira, C J. Parker

    The role of the virgin in situ stress field in tunnelling projects is well known in the Sydney area. The effect of in situ stresses is mostly considered through the use of published relationships that

    Sep 17, 2014

  • AUSIMM
    Trajectory Design and Economic Analysis of Asteroid Mining Missions to Asteroid 2014 EK24

    By S Dorrington, J Olsen, N Kinkaid

    Several studies have been conducted on the economic analysis of mining near-Earth asteroids for resources for use in Earth orbit. While these studies use detailed economic figures of merit, they often

    Nov 4, 2015

  • AUSIMM
    The Path to Best Practice at Geita Gold Mine

    By M Monaghan, B S. Gregory

    The Geita Gold Mine is located 80 km southwest of the town of Mwanza in the north-west of Tanzania and is 100 per cent owned by AngloGold Ashanti Limited. Open pit mining commenced at Geita in 2000. I

    Sep 18, 2012

  • AUSIMM
    Accurately defining failure geometries and their variability

    By E J. Hancock, K H. B Chu

    Failures within hard rock underground excavations have historically been defined by a depth of failure, estimated in the field or through individual measurements, with a simplified failure geometry; s

    Nov 29, 2022