Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Fine-Tuning Raise Bore Stability Assessments and RiskBy W A. Peck
Raise boring is the preferred option for constructing ventilation shafts in Australia. The trend has been towards larger diameters and longer single-pass shafts, and if at all possible, reaming throug
Mar 21, 2011
-
Misima Gold Mine – A Case Study in the Use of Historical Data for an Updated Mineral Resource EstimateBy C Switzer, R Logan, S Konopa, P Stoker, R Lewis
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Misima gold mine, located on Misima Island within the Milne Bay Province of Papua New G
Mar 18, 2015
-
The Rates of Flotation of Mineral Particles in Sulphide OresContinuous, steady-state laboratory flotation tests showed that the recovery of cha1copyrite from a naturally occurring ore, under conditions closely resembling those of plant practice, could be expre
Jan 1, 1966
-
Energy Efficiency Assessments in Design – Seminal Decisions and Effective ProcessesBy M Allen
Energetics has been in the business of climate change for more than twenty years. This experience has only served to cement the understanding that decisions taken during design define the environmenta
Aug 8, 2011
-
Be Open to Closure - It Can Save You MoneyBy J Heyes
Historically mining engineers haven't spent enough time planning waste dumps, but waste movement costs often outweigh ore haulage costs. There is a real incentive to plan waste dumps right the fi
Jan 1, 2009
-
The Resource Valuation and Optimisation Model Real Impact from Real OptionsBy C Tonkin, S D. Howell, P V. Johnson, J Moriarty, P W. Duck
This paper presents the scientific framework underpinning the resource valuation and optimisation model (RVOM). The RVOM is a partial differential equation based real options software package, which h
Sep 26, 2011
-
The Use of Common Business Intelligence and Analytics Tools in the Operation and Optimisation of Iron Ore Process PlantsBy T Nassis, P Louw, M R. Fry, T du Toit
Business intelligence (BI) and business analytics (BA) are established IT technologies that are used extensively in the business environment. This paper discusses the use of these technologies in prod
Jul 13, 2015
-
Geology of the Ladolam Gold Deposit Lihir Island, Papua New GuineaBy Ballantyne GH
The Ladolam gold deposit on Lihir Island, in Papua New Guinea, is a large disseminated gold deposit hosted by hydrothermal breccias. The deposit occurs in the cupola zone of a 350,000 year old mon
Jan 1, 1987
-
Australian Innovation in African Heavy-Haul RailBy K Devencorn
The development of robust, economical transport infrastructure has been identified as a key driver to sovereign economic growth. Notwithstanding the value of undeveloped mineral resources, unless they
Nov 22, 2011
-
Upgrading Low-grade Gold Ore Stockpiles by Preconcentration Using Ore Sorting – an Assessment of the Economic Impact and ViabilityBy A N. Parry, G van Wyk
"Sensor based automatic ore sorting technologies are used in the minerals industries to efficiently remove waste and submarginal grade material from crushed and screened run-of-mine (ROM) ore, produci
Oct 10, 2016
-
Extension Hill Direct Ship Iron Ore Project – Seven Years in the MakingBy R Forster
Direct ship iron ore (DSO) operations at Extension Hill in Western Australia’s Midwest region have commenced, with fi rst product railed to the port of Geraldton in July 2011. Reserves are 14.8 millio
Jul 11, 2011
-
New reagents for beneficiation of lithium oresBy T Walsh, S R. Mudnuru
The development of lithium-ion batteries, coupled with the global trend towards electrification of transportation, has led to a dramatic increase in the demand for lithium. The production of lithium f
Aug 24, 2022
-
Managing continuous improvement of Mine to Mill begins with measurementBy J Loeb, R Ramanathan, H Ingham, P Cameron
Most mining operations, including iron ore, maintain a focus on continuous improvement and asset optimisation in their operations. As all the unit operations in the Mine-to-Mill value chain are interd
Nov 8, 2021
-
Design and operation of large drum scrubbersBy G S. Beros, K M. Edwards
Over the past 20 years drum scrubbers have become a widely adopted technology within iron ore beneficiation plants. Generally, the drum scrubbers in use are considered high-capacity machines capable o
Sep 18, 2023
-
Energy complexities in complex orebodiesBy M Ziemski
The provision and management of energy in both fuel and electricity forms is an increasingly important consideration for mines. Pressures from communities, governments and markets are increasing towar
Nov 21, 2018
-
Significance of Latent Energy in Hydraulic Slags to the Cement and Concrete IndustryBlast furnace slags which fall into the quaternary system SiO2 - A1203 - MgO - CaO have latent hydraulic properties which depend on the degree of vitrification. When the oxides com- bine to form Ca
Jan 1, 1979
-
An evolution of drill hole spacing studies at Newmont CorporationBy A Jewbali, L Allen
At Newmont Corporation drill hole spacing studies are done to support the business in understanding the cost of collecting additional information (with a specific focus on drill hole sampling density)
May 24, 2023
-
Simulating Integrated Hydrology in Mining Catchments from Planning to ClosureBy S Szylkarski, D N. Graham
In mining, water management is an operational necessity, requiring planning and detailed engineering, as well as risk assessment. Yet, the hydrology of streams and aquifers typically extends well beyo
Jun 28, 2016
-
Forecasting Life-of-Mine Deformation and Seismic Potential at Rosebery Mine Using a Mine Scale Non-Linear Numerical ModelBy W Zirima
A detailed, mine scale non-linear numerical model of Rosebery mine has been built for the purpose of simulating life-of-mine global deformations. The model was calibrated using observations of displac
Jan 1, 2008
-
Creating optimised drill programs that add real value, and integrate with mine planningBy N Anderson
With traditional grade control processes, geological models are created by geologists at the completion of the data collection stage and wireframe construction is closed off at a set date to allow for
Mar 22, 2022