Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Geological Modelling and Bench Face Survey to Improve Blasting FragmentationBy E Gabriel, J C. Koppe, A Gomes and P Crispim, R Schaarsdmit, I Pablos
Drill and blast (D&B) is one of the most important production operations in open pit mining. The resulting fragmentation of the D&B reflects in the downstream unit operation. Good fragmentatio
Aug 24, 2015
-
Fundamental Sampling Error and Sampling Precision in Resource Estimation – A DiscussionBy N Schofield
For the sampling of particulate materials in mineral exploration and mining, the fundamental sampling error (FSE) introduced by Gy is a measure of the constitutional heterogeneity of the sample lot an
Aug 22, 2011
-
Tunnel Design in an Alliance for Waterview Connection, New ZealandBy D Maconochie, S Pradhan, M Reed
The Waterview Connection will provide a high-quality strategic alternative to State Highway One and complete Auckland’s Western Ring Route connecting State Highways 20 and 16. The project includes twi
Sep 17, 2014
-
Spontaneous combustion hazard assessment of McArthur River Mine waste rockBy P Marianelli, J Theiler, B Beamish, A Spillman
The presence of reactive pyrite in waste rock contributes to the hazard of spontaneous combustion in emplacement facilities as it acts as an initiator of self-heating at low ambient temperatures. Orga
Jul 23, 2018
-
Metso SmartTag - The Next Generation and BeyondBy K J. Riihioja, E Nozawa
SmartTag is a radio frequency identification (RFID) based technology designed to allow tracking of ore from its source through blasting, run-of-mine (ROM) pads, crushers, intermediate stockpiles and f
Sep 26, 2011
-
How to Create a Perfect StormBy A Chadwick, J de Ross, C Adams
Imagine a æshinyÆ new mine, $1 B in the bank and record commodity prices. So how does a company and its management team create enough tension to maximise profit and to establish a culture that can wea
Nov 20, 2012
-
Implementation of Acoustic Arrays for Semi-autogenous Grinding Mill?OperationBy R Wynn, R A. Pax, S Mann, B Cornish
The semi-autogenous grinding (SAG) mill at the MMG Century operation has failing load cells that are essential to the control strategy used to stabilise the mill. Currently, mill-bearing pressure is u
Sep 1, 2014
-
Silver Recovery at North Kalgurli (1912) LimitedDuring the past seven years silver recovery has been increased from 9 per cent to over 61 per cent. The changes in plant practiee which have led to this increase are described. Gold room clean-up p
Jan 1, 1964
-
Discovery of the Corunna Downs DepositsBy P J. Howard, P Darvall, J H. Mainwaring
In less than a year, Atlas Iron’s Corunna Downs Project has moved from a new discovery to a substantial resource of high quality in an underexplored greenstone belt. Located approximately 170 km south
Jul 13, 2015
-
Optimal Inference of Modelling Parameters to Simulate Complex Trends across Soft Boundaries – A Case Study in Heavy Mineral SandsBy T Wambeke, J Benndorf
A risk-robust development of a heavy mineral resource requires an assessment of the geological uncertainty and spatial variability of the key factors impacting the mining and processing operation. Att
Nov 24, 2014
-
Metallurgical Performance of Outotec’s e500 TankCell® at the Kevitsa Cu-Ni-PGE ConcentratorBy B Murphy, T Mattsson, R Crosbie, T Maksimainen
"An Outotec e500 TankCell, with 500 m³ of actual flotation volume, was commissioned at the Kevitsa Cu-Ni-PGE concentrator in northern Finland during 2014. This flotation cell was implemented at t
Oct 10, 2016
-
Preliminary Design for the Rockwater Power Project, South Island, New ZealandBy H Asche
The proposed Rockwater Power Project is a hydropower development on the Waitaki River in the South Island of New Zealand. The proposed development will have an installed capacity of 250 MW with a peak
Mar 8, 2011
-
Prediction of Burden at the Sungun Copper Mine by Artificial Neural NetworkBy H Khoshrou, A Siamaki
Blast designs can have productive and non-productive impacts on downstream stages, mine productivity and operating costs. On the other hand, ground vibration, fragmentation, and back break caused by b
Sep 26, 2011
-
Tunnelling in the Andes in Chile – By Drill and Blast and Tunnel Boring MachineBy R Fletcher
Pacific Hydro, a leading renewable energy company from Australia, is developing a series of cascading run-of-river hydro electricity projects in the Cachapoal Valley at the base of the Andes Mountains
Mar 8, 2011
-
Energy Efficiency Opportunities in Milling – Improving Comminution Circuit EfficiencyBy F Musa
One of the main energy efficiency opportunities identified from the majority of mine site energy audits is to optimize the comminution circuit to reduce energy consumption through improved throughput
Aug 8, 2011
-
Some New Concepts in Dry Beneficiation Possibilities for Iron OresBy D Henderson, M Germain
The beneficiation of iron ore deposits to yield haematite and magnetite concentrates for steel making processes typically require the use of one or a combination of wet processing techniques based on
Jan 1, 2009
-
Site Investigation and Design for Melbourne’s New MetroBy H Asche
The Melbourne Metro project has evolved from the Victorian Transport Plan. MM1 is the second major phase of the proposed separation of Melbourne’s radial railway system, creating a line that will oper
Mar 8, 2011
-
Exploration advances – MinEx CRC’s missionBy D Giles, A C. Bailey
In the first 20 years of the 21st century, just over 20 per cent of Australian mineral exploration expenditure was dedicated to iron ore, totalling >A$8 billion and >30 million metres of drilling (Aus
Nov 8, 2021
-
Innovative Approach to Open Pit Edge ProtectionBy N Redwood, N Fowkes, A Bassom, S Durkin
"It is well known that from time-to-time a vehicle will interact with a bund or windrow and often the barrier is insufficient to safely arrest that vehicle. The result of such an incident is often cat
Nov 15, 2016
-
A new approach to logging and modelling faults at the Dugald River Pb-Zn-Ag deposit, North West QueenslandBy K George
The Dugald River lead-zinc-silver deposit is located approximately 60 km north-west of Cloncurry and 87 km north-east of Mount Isa. The development project is expected to turn operational in 2018. The
Sep 20, 2017