Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Geotechnical monitoring at the Porgera Mine

    By Yambu J, Titus K

    Geotechnical investictations and monitoring have been integral to development of the Porgera Gold Mine. The steep, unstable terrain has required a program for monitoring of slopes and foundations whic

    Jan 1, 1994

  • AUSIMM
    Stable Isotope Relationships in Epithermal Gold Deposits, Queensland

    By Wilson AF

    Gold-silver mineralization at Cracow and Ukalunda in Queensland comprise quartz-filled veins, fissures and breccia zones hosted by propylitically altered volcanics and epizonal intrusions which are st

    Jan 1, 1984

  • AUSIMM
    Grouting Technology for Control of Ordovician Limestone Water

    By Yinxiang W, Chunlai Y

    In older to improve efficiency of surface pre--grouting in sealing off water in heavily water-bearing strata, such as sandstone,siltstone and limestone, several methods have been used in China, they

    Jan 1, 1988

  • AUSIMM
    Experimental Validation of the Discrete Element Method (DEM)

    By W Wu

    The prospect of discrete element modelling (DEM) being used as an everyday design tool for transfer chutes in the iron ore mining industry is becoming more and more probable. However, much care needs

    Jan 1, 2007

  • AUSIMM
    Global Extraction Sequences in Sublevel Stoping

    A review of the most widely used global extraction sequences in sublevel is undertaken. The review includes techniques used to extract massive as well as single or multiple steeply dipping tabular ore

    Jan 1, 2003

  • AUSIMM
    Flow Loop Testing of Different Paste Mixtures at Neves Corvo Mine, Portugal

    By M Byrne, P Newman, M Lindqvist

    SomincorÆs Neves Corvo Mine, one of the largest copper producers in Europe, is currently constructing a paste backfill plant in order to replace cemented rockfill in its bench and fill stopes and poss

    Jan 1, 1998

  • AUSIMM
    Carbon-in-Chlorine Treatment of Refractory Gold Ores

    By Greaves J. N

    The U.S. Department of Interior, Bureau of Mines, is investigating the treatment of refractory gold ores. Chlorination in the treatment of refractory gold ores is applicable in many low-grade gold o

    Jan 1, 1991

  • AUSIMM
    Peanuts and Tunnel Stuffing - The Brightwater Conveyance System East Contract

    By M E. Trim, J J. Johnson, W Cranston

    The Brightwater conveyance system is located near Seattle, Washington in the north-western United States. The East Contract portion of the system consists of a 4.3 km long, 5.9 m diameter tunnel in so

    Jan 1, 2008

  • AUSIMM
    Alkali Emission Reduction and Measurement at Queensland Alumina Limited (QAL)

    By T Connor

    Alkali emissions are one of the environmental challenges facing alumina refineries. Queensland Alumina Limited (QAL) is undertaking a number of initiatives to continuously improve its environmental pe

    Jan 1, 2005

  • AUSIMM
    Computer Simulation of Stoping Methods at the Z.C. Mines Broken Hill Operations

    By Koeng R, Richardson M, Hoare R

    A discrete event computer simulation model was developed for two of the stoping methods currently used at the Z.C. Mines Broken Hill oper- ations. The objective in undertaking this project was to pro

    Jan 1, 1988

  • AUSIMM
    Good Coke from Low Rank Coal Blends

    By Hutchings SG, Skimmings T

    This paper describes the results of the field application tests at Miike Colliery on the integrated automatization of the longwall mining system for medium thick coal seam. The purpose of the rese

    Jan 1, 1987

  • AUSIMM
    Blast Vibration Monitoring and Elastic Wave Reflection Models to Assess Blast-Induced Damage to Mine Infrastructure - An Underground Case Study

    During underground mining, rock mass changes can occur as a function of the mining sequence and excavation processes. Mining-induced rock mass damage can occur due to redistribution of static stresses

    Dec 6, 2010

  • AUSIMM
    Reduction of Iron Content from Silica by Gravitational Processes

    Reduction of Iron Content from Silica by Gravitational Processes In this research work, it was attempted to reduce the iron contents (Fe2O3) in silica sample which was provided from Shenin silica min

    Sep 13, 2010

  • AUSIMM
    A Kinematic Model for the Prediction of Fragment Trajectories and Muckpile Shape during Bench Blasting

    By Lilly PA, Kavetsky AP

    An empirical, kinematic model is developed which calculates the trajectory of individual blocks of rock in a blast, their point of impact in the muckpile and the final shape of the muckpile. The m

    Jan 1, 1986

  • AUSIMM
    The Use of Cyclones for the Sizing of Steel Plant Slurries

    By Howes PM

    In the iron and steelmaking processes, dusts are generated and treated by wet dedust- ing methods to form slurries which are high in iron content, but also contain certain impuri- ties. For many yea

    Jan 1, 1984

  • AUSIMM
    The Potential for Backfill in Highwall Mining (7bcc6ff0-6f9e-4f39-8e8f-1dbb9d479afe)

    By Boyd GL

    Backfill applied to highwall mining is foreseen as a means to increase recovery of mineable coal to levels comparable with underground longwall mining. This paper describes the progress of research

    Jan 1, 1998

  • AUSIMM
    Computer Monitoring of Environmental Conditions and Production Processes (WCC)

    By Miller RJ, Eager DT, Lama RD

    For safe and efficient mining operations, it is essential that environment and equipment status be monitored. A system that gives quick access to status at any given time, and also permits quick analy

    Jan 1, 1985

  • AUSIMM
    Problems Encountered in Dewatering a Nigerian Coal Mine

    The only functional underground Coal Mine in Nigeria is located in Enugu in Anambra State. For some years now the mine has been beset with a perenial problem of flooding. This has hampered produc- t

    Jan 1, 1988

  • AUSIMM
    Application of Simulation Models to Port Planning and Management

    By Mahoney BK

    The development of simulation models to reflect accurately the operations of a port and its associated transportation systems can be an expensive and time consuming process. However the complexity

    Jan 1, 1983

  • AUSIMM
    Planning and Cost Criteria for Mining Infrastructure

    By Mahony BK

    This paper discusses the major infrastructure elements required to support a typical Australian mining development. Infrastructure elements are grouped into four major types, urban planning, trans

    Jan 1, 1983