    Minimising the Total Cost of Horizontal Development with Burn Cut Blast Rounds

    The total cost of horizontal development can be minimised by optimising the cost of each of the component operations (eg drilling, blasting, etc). Component costs should not be minimised. To optimise

    Jan 1, 1998

  • AUSIMM
    Environmental Rheology and the Mining Industry (Mine Fill 98')

    By DV Boger

    Rheology is the science which deals with the deformation and flow of matter. Thus nccology is concerned with the flow of any material. The mining industry is concerned with digging things out of the

    Jan 1, 1998

  • AUSIMM
    Clastic Dispersion of Tin in the Stream Sediments of Southern Dartmoor, England

    By James CH

    For drainage sediment to be used as a successful sampling medium in reconnaissance geochemical surveys, the length of any dispersion train from a typical target must be great enough for it to be d

    Jan 1, 1986

  • AUSIMM
    Rb-Sr and Pb Isotope Data from the Northampton Block, Western Australia

    By Blockley J. G, Laeter J. R

    The history of the Ph-Cu-Zn mineralisation in the orthampton Block of Western Australia has been further investigated. It was hoped that (1) Rh-Sr studies on partially-remelled granulites, wall-rocks

    Jan 1, 1985

  • AUSIMM
    The Application of Rock Engineering Systems to Block Caving to Identify the Effective Parameters

    By M Mohammad Khani

    An economic block cave is dependent to the characteristics of the rock mass at stages of caving. These are cave initiation, propagation and ore flow. In this research, the rock engineering system (RES

    May 9, 2016

  • AUSIMM
    Kinetics of Impurity Removal from Steel for a Batch Process

    By Wright G. A

    The objective of refining in steelmaking is to reduce the concentration of impurity atoms, e.g. sulphur, phosphorus, from an initially high level to a specified low concentration. A two-film theory

    Jan 1, 1980

  • AUSIMM
    The Benefits of Mine Scale Three-Dimensional Structural Modelling at Macraes Mine, Central Otago – A Case Study

    By A J. Daniels

    Macraes Mine is a large-scale open-cut and underground gold mine located in Central Otago, on the South Island of New Zealand. This paper presents the role of geological mapping in the grade control p

    Aug 22, 2011

  • AUSIMM
    The Influence of Caving in the Hirst and Bulli Seams on Powered Support Rating

    By Aziz N

    The objective of the paper is to develop an understanding of the influence of caving on powered support rating by examining the geology and support performance at two sites which represent the cur

    Jan 1, 1986

  • AUSIMM
    New Tailings Dam at Ardlethan Tin N.L.

    In May 1977 a new dam was commissioned for disposal of 600,000 metric tonnes/year of tailings. Design basis, costs and construction problems are described. Problems arose, assoc- iated with lack of

    Jan 1, 1978

  • AUSIMM
    Underground Hydraulic Filling Storage At North Broken Hill Limited

    An underground storage and filling distribution system is presently being established at North Broken Hill Limited in the No.3 Shaft area. This has been necessitat- ed by the dependence of the pres

    Jan 1, 1973

  • AUSIMM
    The Behaviour of Individual Uranium Bearing Minerals During Froth Flotation

    By Muller GP, van Deventer JSJ

    A mineralogical analysis has shown that in the Hartebeesfontein ore studied, uranium is associated mainly with uraninite, sulphides such as pyrite and to a lesser degree carbonaceous material such a

    Jan 1, 1993

  • AUSIMM
    Developments of the Mackie Vat Leaching Jig

    Traditional vat leaching has been done on a batch basis, which involves loading the vats, leaching, drainage, washing, draining again, and unloading. As a result of these many steps and the attenden

    Jan 1, 1991

  • AUSIMM
    Recent Developments in Blast Furnace Practice (c2d107f7-9e36-42a5-af20-345e4b5b7ab3)

    The approach to this subject is a very general one, but an attempt has been made to cover briefly a very wide field in the nationally important job of manufacturing iron for the iron and steel industr

    Jan 1, 1947

  • AUSIMM
    BHP Gold Mines/Devex Gympie Joint Venture Project and the Geology of the Goldfield

    The Gympie Goldfield was the sixth largest producer of gold in historic terms in Australia. The Joint Venture Agreement between BHP Gold Mines Limited and Devex Limited was signed in January 1987.

    Jan 1, 1989

  • AUSIMM
    Blast Control in Small Scale Underground Mining

    By McKenzie C. K, Stewart R. S, Simpson J

    Blast control in small scale underground mining leads to improved fragmentation control, improved control over overbreak and dilution, and the optimisation of drilling and charging operations. Greatly

    Jan 1, 1993

  • AUSIMM
    A Review of Geotechnical Considerations in Narrow Vein Mining in a High Stress Environment

    By Dight P. M

    The challenge of narrow vein mining is to produce ore with as little dilution as possible, at the least cost -commensurate with the increasing degrees of safety being demanded for mine workers by the

    Jan 1, 1993

  • AUSIMM
    Aeromagnetometry and Aeroradiometry of Gabal El Kahfa Ring Complex, Eastern Desert, Egypt

    By Rabie A. S, Fouad K. M, Ammar A. A

    The existence of Gabal El Kahfa ring complex, located in the Eastern Desert of Egypt, has been ascertained from aeromagnetic and aeroradiometric survey data as well as by aerial photography. Two m

    Jan 1, 1988

  • AUSIMM
    Blast Monitoring : From Detonation to Impact

    The intention of this paper is to examine the practical and technical aspects associated with the measurement of blasting related phenomena. The emphasis is directed towards the acquisition of quan

    Jan 1, 1990

  • AUSIMM
    Geostatistics in the Statigraphic Orebodies at Mount Isa

    By Scott IR

    In stratigraphic orebodies, estimation of footwall and hangingwall location is often of more importance than grade estimation. Contoured grade estimates often produce smeared boundaries and the us

    Jan 1, 1986

  • AUSIMM
    Block Cave Evaluation

    By R J. Butcher

    Many deposits have been evaluated as potential block caves over the last 20 years due to the perceived benefit of low operating costs. However, block cave projects are typically capital intensive, wit

    May 9, 2016