Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Blast Fragmentation Measurement Based on Three-dimensional Imaging in Sublevel Caving Drawpoints and Underground Excavator Buckets at LKAB Kiruna

    By M J. Thurley, M Wimmer

    To assess the present-day functionality of large-scale sublevel caving at LKAB Kiruna a comprehensive measurement program was undertaken involving blast function, fragmentation and gravity flow. As pa

    Aug 24, 2015

  • AUSIMM
    Concentrator design – standard engineering practice versus geometallurgy and simulation

    By G Harbort, K Quan

    Traditional engineering practice for concentrator design uses a mixture of risk minimisation options and capital minimisation approaches. Often this is based on the preferences and experiences of the

    Sep 11, 2017

  • AUSIMM
    Processing of Subsea Massive Sulfide Ores by Flotation – Similarity and Features with Terrestrial Ores

    By L O. Filippov, I V. Filippova

    Subsea massive sulfide deposits have particular mineralogical compositions and textural features differentiating them from onshore ore. When extracted from salty water and exposed to the air, massive

    Nov 4, 2015

  • AUSIMM
    Managing Groundwater Impacts in the Surat Basin

    By R Cox, S Pandey

    The coal seam gas (CSG) industry is expanding rapidly in the Surat and Bowen basins. CSG production involves pumping water from the coal seams to release the gas adsorbed to coal particles. The reduct

    Nov 26, 2013

  • AUSIMM
    Surface Cooling at Kidd Creek Mine

    By K Hortin

    Kidd Creek mine in north western Ontario is developing phase 1 of the deep mine project for mining between 2100 m and 3100 m below surface. Heat problems were experienced during the 2003 summer in wor

    Jan 1, 2005

  • AUSIMM
    The Application of Advanced Undercutting at PT Freeport IndonesiaÆs Deep Ore Zone Mine

    By A Sinuhaji, R Poedjono, G Flumerfelt

    PT Freeport Indonesia is currently building the DOZ mine. It is a 25 000 tonne/day block caving operation which is scheduled to reach designed production levels by the fourth quarter of 2002. This pap

    Jan 1, 2002

  • AUSIMM
    Guidelines for the Design of Rope Guides

    Rope guides, consisting of ropes spanning between anchor points at the top and bottom of shafts, have frequently been considered as a viable alternative to fixed guides, comprising buntons and guides.

    Jan 1, 2005

  • AUSIMM
    Mount Morgan Gold-Copper Deposit:: The 1992 Perspective

    By Dean J. A, Taube A, White A. H, Messenger P. R, Jones I. W O, Huston D. L

    The 50 million tonne Mount Morgan gold-copper deposit (4.99 g/t Au, 0.72 per cent Cu) was an irregular pipe-like body of quartz and pyrite, with subordinate chalcopyrite, magnetite and gold. Mineralis

    Jan 1, 1993

  • AUSIMM
    A Field Demonstration of a Modified Wet Scrubber for Dust Control in an Illinois Coal Mine

    By A Patwardhan, M M. Alam, K K. Thatavar

    A commercial wet scrubber was used in the SIU-Joy dust control laboratory to test several concepts for improving the dust control efficiency of a wet scrubber. The concepts tested included two filter-

    Jan 1, 2005

  • AUSIMM
    Alignment and Differences between the Australian Water Accounting Standard and the Water Accounting Framework for the Minerals Industry

    By A Woodley, A N. Danoucaras

    In 2012 the Bureau of Meteorology, under the banner of the Water Accounting Standards Board, released the Australian Water Accounting Standard 1 (AWAS 1). This standard has been in development since 2

    Nov 26, 2013

  • AUSIMM
    Bulk Explosives go Tunnelling in Hong Kong

    The constructionhunnelling industry in Hong Kong has taken an upturn during the last few years due to the commencement of works to relocate the International Airport to Chek Lap Kok Island. The Airp

    Jan 1, 1994

  • AUSIMM
    Changes in Blasting Technology at New Broken Hill Consolidated Limited Mine, Broken Hill, NSW

    By Treglown N

    In any mining operation the curtailment of rising operating costs is of prime concern to management.One area of activity where costs are often disguised is that of longhole secondary breakage.This pap

    Jan 1, 1985

  • AUSIMM
    Maintaining and Improving Grade Control at New Celebration Gold Mine

    New Celebration Gold Mine is located 35 km SE of Kalgoorlie, Western Australia, in the Archaean Kalgoorlie-St Ives Greenstone belt. The leases total 119 sq kms and arepart of a joint venture between

    Jan 1, 1991

  • AUSIMM
    Water, Soil and Sediment Monitoring Programs; Some Lessons from 15 Years Experience in the Alligator Rivers Region, Northern Territory, Australia

    By Noller B. N, McGill R. A

    The Alligator Rivers Region has been the scene of one of Australia's most intensive environmental monitoring efforts since the current generation of uranium mining was mooted in the 1970s. Prio

    Jan 1, 1994

  • AUSIMM
    "Modelling Grade Variation in Crushed Ore at Cadia Ridgeway and Its Potential Consequences for Bulk Ore Sorting"

    By A McGann, P J. Coghill, D Miljak

    "It is widely accepted that bulk ore sorting could provide a step change in processing of low-grade ores. For this to be achieved a rapid, accurate bulk sensor of grade is required as well as sufficie

    Jun 15, 2016

  • AUSIMM
    Gold Dredging In New Zealand

    The history of gold dredging in New Zealand, leading to the develop- ment of the `New Zealand Type' dredge is considered. Much of this infor- mation has come from contemporaneous publications by

    Jan 1, 1988

  • AUSIMM
    Pyrite depression at Boliden Tara using F-250 – a biopolymer

    By Y Peng, C Burns, Y Mu, R A. Lauten

    In both laboratory flotation experiments and from analysing the composition of the lead concentrate at the Boliden Tara lead-zinc mine in Ireland, it has been found that F-250 may replace cyanide as a

    Aug 29, 2018

  • AUSIMM
    Development of Mining Related Legislation in the Northern Territory

    By D Hart

    In 1944 some ten or so pieces of legislation impacted on the mining industry. Today in excess of 80 in one way or another apply to the Northern Territory miner. This paper will look at the nature of

    Jan 1, 1994

  • AUSIMM
    The Future of the Tasmanian Mineral Industry

    The future of the Tasmanian mineral industry can only be estimated from a knowledge of the past, and armed with this knowledge an orderly plan for the future can be developed. Brief mention is made

    Jan 1, 1977

  • AUSIMM
    The Soft Ground Bored Tunnel Under Sydney Airport

    The New Southern Railway (NSR) involves the excavation of approximately 10 km of single bore tunnel from Tempe Reserve, Tempe, to Prince Alfred Park (PAP). PAP is located just south of Central Railway

    Jan 1, 1999