A Rock Mass Rating System For Evaluating Stope Stability On The Bushveld Platinum MinesBy B. P. Watson
Several large falls of ground occur annually in the narrow, tabular stopes mined in the Bushveld Complex. These falls comprise safety risks and cause substantial production losses and compromise effor
Jan 1, 2004
-
Potential Metallurgical Treatment Of Copper Concentrates With High Arsenic Contents - SynopsisBy I. Mihajlovic
This paper investigates a potential method for arsenic removal from copper concentrates using hypochlorite leaching. The problems concerning pyrometallurgical processing of copper concentrates with hi
Jan 1, 2011
-
Grinding process modelling and circuit analysis in a copper mine, T. Song, T.H. Yang, J.W. Zhou, and Q.K. WangBy T. H. Yang, Q. K. Wang, T. Song, J. W. Zhou
The grinding circuit can be one of the most important mineral processing circuits in plants. Along with the application of large-scale milling machines, the design and optimisation of the operation st
Jan 1, 2020
-
Reduction Of Chromium Oxide In Stainless Steel SlagsBy N. Sano
The chromium oxide in stainless steel slags usually exists as Cr2O3. However, there is a possibility that it is oxidized to hazardous CrO3 after disposal or during use. Therefore, some technical devel
Jan 1, 2004
-
An Overview Of PGM Smelting In Zimbabwe - Zimplats OperationsBy L. Mabiza
Keywords: Pyrometallurgy, circular furnace, PGM, platinum, Peirce-Smith converter, Zimbabwe The Zimplats Smelter, located on the northern part of the Great Dyke, at the Selous Metallurgical Comple
Jan 1, 2006
-
Phase Equilibria In High MgO Ferro- And Silico-Manganese Smelting SlagsPhase equilibria have been determined experimentally for pseudo-ternary sections of the form ?MnO?-(CaO+MgO)-(SiO2+Al2O3) with a fixed Al2O3/SiO2 weight ratio of 0.17 and MgO/CaO weight ratios of 0.25
Jan 1, 2004
-
The Application Of The Analytical Hierarchical Process In Complex Mining Engineering Design Problems - SynopsisBy P. Kluge
Mining engineers frequently encounter complex design problems for which the critical components of the design are difficult to quantify or compare. Teams of people typically work on these designs and
Jan 1, 2011
-
State-Of-Art Shaft System As Applied To Palabora Underground Mining ProjectAs the world continues to face the turmoil of the economic environment, legislative prerequisites and physical conditions the intervention of technological development is vital for the continuation of
Jan 1, 2000
-
Experimental Determination of Compressive, Pulling and Torsional Resistance of Mudcakes using a Triple Action Load Cell AssemblyBy Md. Amanullah
A novel triple action load cell assembly (LCA) was developed to determine three index parameters reflecting compressive, tensile and shear characteristics of mudcakes. The results indicate that the te
Jan 1, 2003
-
Winning Paper: Analysis Of Strike Gully Stability At Tautona MineBy J. Thompson
Paper written on project work carried out in partial fulfilment of B. Eng (Mining Engineering) degree A study into the stability of strike gullies at TauTona mine was to be carried out. In reaching
Jan 1, 2002
-
The Development Of A Remote-Controlled Highwall Rockbroom?A World First For The Open-Pit Mining Industry ? SynopsisBy D. van Rensburg
Jointed rock slopes are generally stable, as there is no freedom of movement for blocks of rock. In an open- pit mining environment, blasting opens up space into which blocks of rock can fail, resulti
Jan 1, 2012
-
Effect Of Process Control Agent (PCA) On The Characteristics Of Mechanically Alloyed Ti-Mg Powders - SynopsisBy C. Machio
This paper reports the results of a study to determine the effect of process control agent (PCA) on the characteristics of Ti-Mg powders during milling. It has been shown that a 2% increase in PCA con
Jan 1, 2011
-
Plenary Speaker-Technical Aspects Of Closed Loop Cooling Water, Associated With The Pebble Bed Modular Reactor Demonstration Power PlantBy Carl Havemann
[PAPER PRESENTED AT THE 8thINTERNATIONAL CORROSION CONFERENCE HELD AT THE SA NATIONAL MUSEUM OF MILITARY HISTORY, SAXONWOLD JOHANNESBURG DURING 14-15 NOVEMBER, 2006.]
Jan 1, 2006
-
Copper And Cobalt Extraction From Sulphate Solution Using Natural ClinoptiloliteBy D. Nyembe, B. Mamba, Antoine F. Mulaba-Bafubiandi
Copper and cobalt are generally electro-won from their aqueous sulphate solutions. After optimised leaching of their ores, concentrates or calcine bearing minerals, the leachate is clarified and suita
Jan 1, 2007
-
The Economics of Exhaustible Mineral Resources—Concepts and Techniques in Optimization RevisitedBy C. Hutton
"SynopsisThe last commodities supercycle (2003 to 2011) was characterized by a belief in volume at any cost, where absolute output was deliberately prioritized over productivity considerations. This p
Jan 1, 2015
-
Important Considerations In The Testing Of High-Density Tailings For Beach Profile Prediction ? SynopsisBy G. I. McPhail
The authors have conducted several investigations into the prediction of the beach profile of high-density tailings and have found that there are a number of important considerations that need to be t
Jan 1, 2012
-
Kwaliteitsbeheer in die metallurgiese bedryfBy W. J. Kotzé
Die derde colloquium van die Spesialiste-afdeling van die SAIMM is op 19 November 1980by die Universiteit van Pretoria gehou en is deur sowat 40 mense bygewoon. Dr J. P. Hugo tree as Voorsitter op en
Jan 1, 1981
-
Kinetics Of Reduction Of Different Manganese OresBy Manoj Kumar, S. Ranganathan, S. N. Sinha
The reducibility of three different manganese ores with coke was studied. The three ores were reduced to different extents under the same experimental conditions. The investigations showed that in the
Jan 1, 2007
-
A review of readiness assessments for mining projectsBy H. Mulder, M. C. Bekker
The objective of this paper is to describe the research followed in creating a generalized, readiness assessment tool for mining projects. We start by highlighting the need for the assessment tool and
Jul 2, 2022
-
The Influence Of Pillars On The Merensky Reef Horizon On Stoping Operations On The Underlying UG2 Reef HorizonBy N. Singh
Merensky Reef is mined extensively within the Bushveld Complex. In previously mined-out areas on the Merensky Reef horizon there are pillars, potholes and remnants that have not been mined. These unmi
Jan 1, 2005