Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Improved Blasting Economics at an Uzbekistan Copper Mine

    By Viktor Aranovich, Thomas E. Brown

    The Almalyk Integrated Mining and Metallurgical Plant is located near Tashkant in Uzbekistan and is one of the former Soviet Union's largest copper producers. Almalyk consumes about 10,000 metric tonn

    Jan 1, 1998

  • ISEE
    Problem Boulders, Big and Bigger

    By Jerry Wallace

    Two recent-release boulders posed serious threats to public transportation and utilities in Washington State. Both required challenging drilling and blasting solutions.

    Jan 1, 1997

  • ISEE
    Low Cost Raw Materials for Emulsion Explosives Applications

    By John Manka

    Emulsion explosives consist of an aqueous oxidizer phase, a fuel phase, and an emulsifier. The ability to use lower-cost sources for any of these raw materials presents an obvious economic advantage t

    Jan 1, 2003

  • ISEE
    Cooperation in Regulations

    By John Petty, John Loviza

    Single sentence describing content-- "The best ally an Explosives Engineer can have in a court of law is a regulations enforcer stating all codes and standards were met on a jobsite".

    Jan 1, 1996

  • ISEE
    Fragmentation Improvement Through the Application of Explosive Charge in the Stemming for the Reduction of Oversize in High Hardness Rock

    By Gustavo Huerta Valer, Jorge Cárdenas Miranda, Johan Salas Flores

    One of the challenges of mining is the optimization of the blasting process, which has an important impact downstream in the processing of crushed ore in the plant, that is why mining companies ensure

    Feb 6, 2023

  • ISEE
    Fragmentation from Pattern Expansion with Electronic Detonators at the Red Dog Mine

    By Norman Paley

    A blasting project was undertaken at the Teck Alaska Red Dog Mine in 2005 to 2007 to determine the extent that using electronic detonators could increase Semi-Autogenous Grinding (SAG) mill throughput

    Jan 1, 2012

  • ISEE
    Controlled Blasting Technology for Tunnel Crossing Under High-speed Rail in Small Distance

    By Weiying Zeng, Shouwei Wang, Jinbei Zhong, Xiangdong Meng, Lingtian Meng

    "Due to a drainage problem, the Lanzhou to Chongqing high-speed rail line had been out of service during the 2015 wet season, so a drainage tunnel is to be constructed for the line and required to be

    Jan 1, 2017

  • ISEE
    Load Transfer of Polycarbonate Blast Resistant Glazing Systems

    By Joshua Calnan, Braden Lusk, Kyle Perry

    This paper presents detailed information and data regarding the load transfer characteristics of Blast Resistant Glazing Systems utilizing two different thicknesses of polycarbonate. A series of triax

    Jan 1, 2014

  • ISEE
    Vibration Effects of Coal Pit Blasts on Tower Pithead Concrete Structures

    By Mark Svinkin

    To save time for construction of coal pits, the contractor decided to combine erection of the tower pitheads with digging of skip shafts to the depth necessary for placing proper coal pit equipment. I

    Jan 1, 2004

  • ISEE
    Solving Blasting Safety Hazards with Advanced Technology

    By Ronald W. Roberts

    For years, blasters have experienced near-misses, injuries, and yes, even fatalities as a result of the dangerous nature of our business. Yet, some blasters continue to portray the immortal attitude:

    Jan 1, 1996

  • ISEE
    Integration of Mine Resources in the Optimization of Shot Documentation

    By Kyle Apple

    The following is a case study of how LuckStone Corporation improved their blast monitoring and documentation program. A number of resources already at their disposal have been utilized to improve the

    Jan 1, 2001

  • ISEE
    Dust Control in Surface Mines

    By John W. Brown

    "Adequate dust control in and around rock drills is a problem that must be solvedfor the health and safety of workers running the drill as well as those working around thedrilling operation This paper

    Jan 1, 1999

  • ISEE
    Experimental Studies to Investigate Pressure Loading on Target Plates

    By T Duff

    This paper describes results from small scale tests conducted to determine the distribution of pressure on target plates when subjected to loading due to the detonation of a buried mine in various med

    Jan 1, 2014

  • ISEE
    Expanded Blast Design For Tight Controlled Hard Rock Trenching Adjacent To Twin Burried Live Oil Pipelines

    By A. Ravi Kumar

    A trench is a structure to accommodate fluid carrying pipelines for water, gas, petroleum products etc. Trench serves the purpose to haul the fluids in bulk over long distances safely and economically

    Jan 1, 2008

  • ISEE
    Controlling Overbreak Through Vibration Monitoring

    By Kaushik Dey

    Bord and pillar is the most predominant method of wining of coal in Indian underground coal mines. Development heading in coal mines often encounters roof stability problem and results in roof overbre

    Jan 1, 2008

  • ISEE
    Better Fragmentation Through Team work At Dos Pobres Mine Safford, Arizona

    By Denard Brandt, Isidro Martinez, Greg Baker, Laura Slattery, Teddy French

    The Dos Pobres Mine is a copper oxide heap-leach mine located near Safford, Arizona. Mine production is 180,000 tons (163,293 tonnes) per day with a stripping ratio of 2:1. During the startup phase of

    Jan 1, 2010

  • ISEE
    What Every Defense Lawyer Wished his Blasting Company Clients Knew

    By Jay P. Tobin

    This paper will address the legal standards applicable to construction blasting lawsuits and offer best practices suggestions for pre-blast inspections, documenting the construction blasting work, rec

    Jan 1, 2015

  • ISEE
    Fragmentation Optimization Techniques using 5.5 inch Hole Plugs at the Holcim Cement – St. Genevieve Quarry

    By Douglas Bartley

    As the economy continues to slowly recover, our industry continues to finds ways to increase productivity while being forced to cut costs. The drilling and blasting process is the starting point of an

    Jan 1, 2012

  • ISEE
    Analysis of Blast Pattern to Evaluate Extent and Causes of Overbreak in Large Cavern

    By S K. Mandal, S Dasgupta

    "Damage is classifi ed as loss in the integrity or deterioration in the quality of rock massand is infl uenced by methodology of excavation on the geo-technical properties of rockmass. Overbreak, on t

    Jan 1, 2008

  • ISEE
    Assessment of Blast Energy Usage and Induced Rock Damage in a Hard Rock Blasting

    By M. S. Dotto

    The knowledge of the explosive/ rock mass interaction process is important in predicting blast performance. It includes understanding rock properties, energy usage, and attenuation in the rock mass. T

    Feb 1, 2020