Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Description of Damage Constitutive Model as Documented in Pronto3D Manual 3/89By Billy J. Thorne
The damage model in PRONTO simulates the dynamic fracture behavior of brittle rock. It is based on work started by Kipp and Grady, [lg] continued by Taylor, Chcn and Kuszmaul [I91 [20] and recently.mo
Jan 1, 1989
-
Accublast Detonator - A New Era of Precision in All-Electric DetonatorsBy W B. Gregg
The rock blasting and mining industries use a system of detonators and explosives for mining operations. Many detonators use small metal bridgewires, which are heated by passing a current through the
Jan 1, 1994
-
Evaluation of Ground Vibration Induced by Blasting During the Excavation of a Transportation Tunnel in Istanbul MetropolisBy Ali Kahriman, Abdulkadir Karadogan, Deniz Adiquzel, Umit Ozer, Suat Bicer, Mehmet Aksoy
This paper presents the analysis and measurements of blast-induced ground vibrations during the construction of Istanbul Kagithane – Piyalepasa – Dolapdere – Dolmabahçe highway tunnels. These tunnels
Jan 1, 2008
-
A Case Study Applying the Multiple Blasthole Fragmentation Model (MBF) at an Open Pit MineBy C. McAllister, D. Preece, J. Berendzen
The Multiple Blasthole Fragmentation (MBF) model was developed recently and has been reported in previous papers. The MBF model accepts inputs from the blast design, such as: location and orientation
Jan 1, 2016
-
Stratablasttm - A New Mining MethodBy T Goswami
The conventional practice in open cut coal strip mining has been to blast the overburden or coal layers in separate blast events. This is done in order to maximise the benefits from throw blasting and
Jan 1, 2006
-
WIPFRAG - A Breakthrough in Fragmentation MeasurementBy John A. Franklin, Tom C. Palangio, Norbert H. Maerz
No blast evaluation is complete without fragmentation measurements which until now were inaccurate, costly, time consuming and created delays in production. “WipFrag.s”is a fully automated PC based fr
Jan 1, 1995
-
Maximizing Drill Factors in Construction BlastingBy Pat McLaughlin
Blast design in the construction industry has often been based on past practice or powder factors. This is to some extent understandable, since construction projects do not have the longevity of minin
Jan 1, 1994
-
Dilution Control While Maximizing Fragmentation in Gold Mines with the Use of Tracking MicrochipsBy David Flores, Benjamin Cebrian
Gold mining require high levels of dilution control due the high value of ore. These types of operations employ short benches, which are suitable for ore control, lower displacement and more represent
-
Close-In Blasting at the Tri-Met Light Rail Tunnels in Portland, OregonBy Don Z. Painter, Gordon F. Revey
Frontier/Traylor Joint Venture is presently constructing a section of the Tri-County Metropolitan Transit District of Oregon's (TRI-MET) Westside Light Rail system. This new section will extend Portla
Jan 1, 1995
-
Seismic Analysis of Explosive PerformanceBy Shazad Hosein, William Birch, Douglas A. Anderson
This paper will present the results of tests of a new method for assessing explosive performance using wavelet transform analysis of standard blast seismograms. The theoretical background of the metho
Jan 1, 2015
-
Predicting Blast Vibrations More Conveniently than with the USBM MethodBy R. F. Favreau, Patrice Favreau
"A blast with explosives creates vibration waves in the zone around the blast.The prediction of the intensity of vibrations is important because people in the cinity demand that the vibrations do not
Jan 1, 2015
-
Regulation Compliance: Security in Manufacturiing, Transportation, Storage and Use of Commercial ExplosivesBy John Capers
•The IME is the Safety and Security Association of the commercial explosives industry in the United States and Canada. •Founded in 1913 •Board of Governors •5 Standing committees- 1. Technical 2. Envi
Jan 1, 2006
-
Journal: Near Field Vibration Monitoring for Rock Mass Damage Control Tala Hydroelectric Project, Bhutan IndiaBy H. Venkatesh, Balachander R.
This article discusses the method that was adopted for controlling damage to rock mass while excavating an underground powerhouse cavern at Tala Hydroelectric Project. It discusses in detail the near
Jan 1, 2006
-
Recent progress with the European Directive on Pyrotechnic ArticlesBy Martti Hagfors
UNDERWATER EXPLOSIONS - Part 6 - EFFCTS OF CYLINDERICAL SHAPE OF CHARGE TO THE RESULTS OF ENERGY MEASUREMENTS OF EXPLOSIVES
Jan 1, 2008
-
Transition of the Seismograph from a Tool of Litigation to a Tool of Production EfficiencyBy David S. Bowling
The ER-300 Series White Recorders were developed to provide on economical, yet invaluable instrument for those who desire permanent recordings of such data OS displacement, vibration, concussion (air
Jan 1, 1990
-
Using the Superposition of Seed Waveforms to Predict Seismic Effect by BlastingBy Yang Jun, Qu Mei, Zheng Yao-wu, Chi Li-yuan
Due to the necessity of the prediction of blasting seismic effect around strip mine bench blasting area, the paper provides a method to predict the blasting seismic effect by employing the superpositi
Jan 1, 2015
-
Deadhead and Dry-run Testing of a 3-inch Emulsion Gear PumpBy C. M. Badeen, J. Paige, W. Evans, L. McCauley, A. Caddies, I. Alilovic, R. Turcotte, C. O. Lyogun, C. Bonner
Gear pumps are very commonly used for the pumping of AN-water based emulsion products for both handling and blast loading applications. The potential major hazardous problems likely to be encountered
Jan 1, 2015
-
Choosing the Right Delay Timing for the Blasting Application, Optimization and Maintaining Field ControlsChoosing the correct delay time for many blasting applications is an important and critical blast design parameter for controlling fragmentation, muckpile shape, swell, digability, throw, ground vibra
Jan 1, 1998
-
Generating Site Specific Custom Blast Designs with Modern Blast Monitoring Instrumentation SystemsThe common approach of designing blasts on a trial and error basis is quickly coming to an end. When utilizing the full scale blast environment, trial and error can quickly become cost prohibitive and
Jan 1, 1991
-
Thermodynamic Work Principal Overture — Not Just Rock n’RollBy Michael Wieland
The resolving capacity of the thermodynamic work-principal model has been seriously refined over its twelve year history, so a review of the innovations, wrong turns and their rectification is warrant
Jan 1, 2009