Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Uncertainty And Bias In Evaluation Of LRFD Ultimate Limit State For Axially Loaded Driven PilesBy James A. Schneider
Selection of resistance factors within Load and Resistance Factor Design (LRFD) requires accurate assessment of uncertainty and bias in load and resistance. To date, many studies have focused predomin
Jan 1, 2009
-
Geotechnical Exploration Phase Drilled Shaft Load TestingBy Walter E. Vanderpool
Full scale load tests are frequently performed immediately prior to deep foundation construction to verify the design assumptions. Occasionally, load tests are performed during design development and
Jan 1, 2011
-
Geo-Foundations Project Information Management Systems on a BudgetBy Jamey B. Rosen
As Project Information Management Systems (PIMS) technologies develop, the range of projects to which one can apply these technologies grows while the cost to apply them shrinks. In recent years, tech
Jan 1, 2019
-
Installation Parameters, Pile Performance and Importance of TestingBy Maurice Bottiau
"Abstract When addressing the performance of deep foundations, many parameters play a role, from adequate soil investigation to performance monitoring and testing. The correct understanding of pile co
Jan 1, 2014
-
Pile Installation Overcomes Numerous Problems At Rocket Motor Component Manufacturing Facility - IntroductionBy Jon H. Gould
This paper describes the following at the new Advanced Solid Rocket Motor (ASRM) nozzle manufacturing facility, which is being constructed inside an existing manufacturing facility: 1) generalized sub
Jan 1, 1992
-
Continuous Flight Auger Piles In The Blue Ridge: A Case Study Using Instrumentation In Pile DesignBy Jesse R. Jacobson
A large casino complex in Cherokee, North Carolina recently underwent a $633 million expansion that involved substantial foundation challenges. The site is located in a valley on the southern edge of
Jan 1, 2011
-
Augered Cast-In-Place Concrete Piles In Flood Plains - 1.0 IntroductionBy Javaid M. Alvi
This paper is an attempt to outline the emergence of Augered Cast-ln-Place piles as one of the more economical types of foundation for supporting high-rise buildings and heavily loaded structures rece
Jan 1, 2001
-
Development and Experiences on Versatile Applications of RD-pile WallBy Fredrik Sarvell, Leo-Ville Miettinen, Veli-Matti Uotinen
"Abstract The continued concentration of building activities in cramped areas of city centres means more underground construction and facilities. Demand to minimize execution time and any kind of dist
Jan 1, 2014
-
New Device For Load Testing Driven Piles And Drilled Shafts Separates Friction And End BearingBy J. Osterberg
A new device has been developed for load testing driven piles and drilled shafts which consists of an hydraulic jack or bellows which has a telltale rod fastended to the bottom. The rod extends upward
Jan 1, 1989
-
Temporary Secant Wall For A Subway Rehabilitation Project In An Urban EnvironmentBy Vincent Tirolo
Two separate secant pile cofferdams were constructed as part of an extensive rehabilitation and modernization of the New York City Transit's Lexington Avenue/Third Avenue IND Station at 53rd Stre
Jan 1, 2003
-
Assessment Of The Risk Of Pile Driving To Juvenile Fish - The ProblemBy James J. Anderson
In this talk I will report on an effort to reassess the risk of pile driving to juvenile salmonids migrating through Puget Sound. The study was motivated by the concern of the construction industry th
Jan 1, 1990
-
Soil Nail And Jet Grouted Excavation Support Wall At Peirce Mill DamBy Eric M. Klein
As part of the Woodrow Wilson Replacement Bridge project several damaged wetland and environmental areas were to be mitigated. One of the mitigation projects consisted of constructing a Denil fish lad
Jan 1, 2006
-
Experiences Of The Cast-In-Situ Pile Filling In Stone-Line IntercalationBy Guan Jichang
An abandened breakwater, located at the rear of No. 2 berth in Dongdu Port area of Xiamen City, was not cleaned thoroughly when the backfilling of sand started. The uncleaned stone layer was about 2 t
Jan 1, 1991
-
1 Recent Technological Developments In Deep Foundations With Soil Excavation - Deep Foundations With Soil Excavation: Bored Piles, Root Piles, CFA Piles, Slurry Trench Walls - Allocation Of papersBy J. Hartikainen
19 papers were allocated to this session by the paper classification committee, 8 related to bored piles, 5 to continuous flight auger piles (CFA piles), 3 to slurry trenches, 2 to both bored piles an
Jan 1, 1994
-
The Utilization Of Static-Load Piledriving Near Structures That Are Sensitive To Vibration - Static-Load Piledriving: - Concept;By Robert A. Field
Static-Load Piledriving utilizes a hydraulic push to facilitate the installation of a pile. The pile is not rotated, impacted or vibrated. A smooth pushing force advances the pile incrementally into t
Jan 1, 1997
-
Complex Piling Works At London Blackfriars StationBy Jamie D. McEwan
To cater for the future introduction of 12 car trains, London Blackfriars railway station is being extended from the north end to span across the River Thames. Following the demolition of existing bui
Jan 1, 2011
-
Modern Procedures For The Design Of Driven Pile FoundationsBy G. G. Goble
Significant progress has been made in the past decade in determining the load bearing capacity of pile foundations. Developments in the means of prediction of pile capacity as limited by soil strength
Jan 1, 1988
-
"Comparative Pile Load Tests In Alluvial Sands" - I. IntroductionBy Lawrence F. Johnsen
In 1989, the Connecticut Department of Transportation authorized the evaluation and design for a reconstructed Route 1 bridge over the Quinnipiac River in the City of New Haven, Connecticut. The proje
Jan 1, 1993
-
Pin Piles For Structural Underpinning - SummaryBy Seth L. Pearlman
Pin Piles are small diameter high capacity drilled and grouted piles also called minipiles or micropiles. They are ideal for building foundations on sites with poor ground conditions, sensitive surrou
Jan 1, 2000
-