Overcoming Constructability Challenges for Drilled Displacement Pile Installation in Difficult GeologyBy A. Rod Kern, Michael A. McNicholas, Yaser Taheri
Deep foundations were required for construction of an 18,000 ft2 (1,672 m2) 4-story office building and an adjacent 23,750 ft2 (2,206 m2) 5-story parking garage in Queens, New York due to an existing
Jan 1, 2019
-
Large Diameter Open-End Pipe Pile Driveability Analysis Including Geotechnical Friction FatigueBy Patrick J. Hannigan, Frank Rausche, Rozbeh B. Moghaddam
Large diameter open-end pipe piles are increasingly used as deep foundations to support heavy onshore and offshore structures. During the driving process, several factors such as subsurface conditions
Jan 1, 2019
-
Westlink Projects – Geotechnical Challenges During The Execution PhaseBy Robert Thurner, Albin Norrman, Sami U. Raja
The West Link is a double track railway project currently under construction in Gothenburg, Sweden. The project includes the construction of 8 kms of track, 6 kms of which will be in tunnels. Beside s
May 1, 2022
-
Experimental P-Y Curves from Centrifuge Tests on Pile Foundations Subjected to Liquefaction and Lateral SpreadingBy Arash Khosravifar, Nason McCullough, Stephen, Milad Souri, Scott Schlechter, E. Dickenson
The results of five centrifuge models were used to evaluate the response of pile-supported wharves subjected to inertial and liquefaction-induced lateral spreading loads. The centrifuge models contain
Jan 1, 2019
-
Outstanding Issues In Understanding The Behaviour Of Thermally-Activated Pile FoundationsBy Teresa M. Bodas Freitas, Arianna Lupattelli, Peter J. Bourne-Webb, Diana Salciarini, Martina Zito, Donatella Sterpi
The thermomechanical response of thermally-activated (TA) piles under monotonic thermal loads is quite well understood and the remaining uncertainties relate to the effect of long-term, cyclic loading
May 1, 2022
-
Goethals Bridge Replacement Foundation Design Modifications Due to Field ConditionsBy John P. Turner, Mark Jen, Bobby Daita
"The Port Authority of New York and New Jersey is replacing the existing Goethals Bridge built in 1928 which is deemed to be functionally obsolete. The replacement bridge will consist of a dual cable-
Jan 1, 2016
-
Lateral Response of Pole on Engineered Driven Timber Pile Footing at Ararat Windfarm Terminal StationBy Frank Albrecht, Brian McCarthy
"The Ararat Terminal Station (ARTS) is located 190km to the north-west of Melbourne, approximately 1.7km to the north of Elmhurst Township in the Pyrenees region of western Victoria, Australia. The si
Jan 1, 1900
-
Boston Waterfront Redevelopment: Re-use Of Existing Pier Piles To House Future GenerationsBy John P. Briand III, Douglas J. Aghjayan, Robert E. Fosse
This paper highlights the successful pile load testing program for the redevelopment of Pier One in East Boston, Massachusetts. Pier One is a 5.4-acre parcel on a dormant waterfront site used in the 1
-
Soil Mixing Monitoring System Quality Control for the SR-83 Project in FloridaBy Danny Winters, Wesley Schmutzler, Christopher Lewis, Matteo Bertoni
"SR 83/US 331 is a primary North/South roadway in Walton County that is a crucial link for tourism and commerce between the Walton County beaches and the heavily traveled I-10 corridor in the panhandl
Jan 1, 2017
-
Engineering Sustainability"What can we do in ground engineering to reduce damage to the environment, to repair historic pollution, to reduce our demand on basic resources and to reduce the carbon footprint of our industry? Som
Jan 1, 2009
-
The Effc/Dfi Guide To Support Fluids For Deep FoundationsBy Chris Harnan, Christophe Justino
The European Federation of Foundation Contractors (EFFC) and the Deep Foundations Institute (DFI) jointly published Edition 1 of the ‘EFFC/DFI Guide to Support Fluids for Deep Foundations’ in April 20
May 1, 2022
-
One Seam At A Time: Interactive Quality Assurance To Identify Coal Seams During Foundation ConstructionBy Matthew Runion, Christopher Lawler
The Aeolus – Jim Bridger Transmission Line Project is located in southern Wyoming, home to some of the largest coal seams in the world. Coal seams present unique challenges to underground construction
-
Helical Pile Foundation Solution for Landfill RedevelopmentBy Kevin Baumgartner, Steven Babcock
A landfill in Phoenix, AZ reached capacity and was graded over in the 1970s. The property was subdivided into lots in 2007 to create a business park. However, the challenging site conditions caused by
Sep 8, 2021
-
Soil Nail Design Optimization of 100 Ft Deep Excavation Project in San Diego, CABy Babak Mamaqani, Pirooz Barar
The Heights project was located at Fashion Valley North, San Diego, CA. The scope of the project was to replace two existing commercial buildings with a large 7-story multi-family residential building
Sep 8, 2021
-
Center Rock Sets New Record on St. Louis Metro Project"The Metropolitan St. Louis Sewer District (MSD) in Missouri, the country’s fourth largest sewer system, is upgrading its storm and wastewater infrastructure in a 23-yearlong, $4.7 billion initiative
Jan 1, 2017
-
Quality Control and Testing of Jet Grouting and its Interpretation in Relation to the Christchurch Town Hall Restoration Project.By David Chadwick, Paul Marsden, Chris Hughes, Mathias Delapille
"Following damage caused by the 2011 Christchurch earthquakes, the NZ$127.5million Christchurch Town Hall Restoration project is due for completion in 2018. The building is undergoing extensive repair
Jan 1, 1900
-
Drilling and Grouting For the Rehabilitation of Contaminated Areas: An Italian Case HistoryBy Raffaella Granata, Daniele Vanni
"This paper presents the drilling and grouting program performed at two abandoned landfills located into former calcarenite rock quarries in Manfredonia, Italy. Tests performed after the abandonment o
Jan 1, 2016
-
Quality Assessment Of Drilled Shaft Foundations At The Jane Byrne InterchangeBy Travis Coleman, Elvis Ishimwe
Currently, more than 400 drilled shafts have been constructed by various contractors at the I-90/94 and I-290 Jane Byrne (Circle) Interchange, located near downtown Chicago, Illinois. Cross-Hole Sonic
-
Nearshore Pile Construction Experience In Burnie, TasmaniaBy Thomas W. Scott, Manh N. Tran
Marine environments present a range of challenges for pile construction. This paper contains a discussion on the design and construction of marine piles for a recent Toll Shipping wharf upgrade in Bur
Nov 1, 2022
-
Cannonsville Dam Emergency Borehole ResponseBy John Vickers, William H. Hover, Paul C. Schmall
"Any sudden subsurface issue that threatens the stability of existing buildings or infrastructure is cause for immediate investigation and prompt remedial action. Nowhere is this more true than the n
Jan 1, 2016