Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Cerro Verde Concentrator ? Four Years Operating HPGRs

    By S. Koski

    The Cerro Verde copper-molybdenum porphyry mine, majority owned and operated by Freeport- McMoRan Copper & Gold, is located 30 km southwest of Arequipa Peru. The concentrator, which produces copper an

    Jan 1, 2012

  • CIM
    Statistical Control in the Evaluation of an Asbestos Deposit

    By Robert F. Shurtz

    This paper discusses and compares methods of statistical analysis of the information relating to the evaluation of an asbestos deposit. From a study of 10-ft. lengths of drill core, the separate effec

    Jan 1, 1966

  • CIM
    Energy Requirements in Electrolytic Winning and Refining of Metals

    By V. A. Ettel

    Current practices in electrolytic winning and refining of copper , nickel and zinc are reviewed from the point of view of their respective energy requirements. The electrical energy requirements of th

    Jan 1, 1977

  • CIM
    The Use of Rubber Mill Liners at Denison Mines Limited

    By L. Connolly, F. R. De Luca

    "Rubber liners at Denison Mines Limited are used in 10 1/2x 24' low discharg0 pebble mills. These were originally 10 1/2 x 13 Dominion overflow type ball mills. Experience here shows that the wear of

    Jan 1, 1974

  • CIM
    Ore Sorting of Low-Grade Gold Sulphide Deposits

    By N. Schmalbein, L. von Ketelhodt, L. Kotelo

    "The mining industry continues to remain challenged. Lower commodity prices, increasing labor costs and more importantly diminishing reserves are amongst some of the primary factors contributing to th

    Jan 1, 2017

  • CIM
    Some Aspects of Corrosion Resistance of Magnesium Alloys

    By E. Ghali

    For engineering applications, magnesium is usually alloyed with one or more elements which include aluminium, manganese, rare earth metals, lithium, zinc, and zirconium. Under normal environmental con

    Jan 1, 2006

  • CIM
    Twelve Months' Milling at Noranda

    By C. G. McLaughlan

    The Noranda concentrator was placed in operation in October, 1928, and the object of this paper is to outline operations during the twelve months which have elapsed since that time. The ores milled

    Jan 1, 1930

  • CIM
    Testing of Cycloflotation Process

    By Turgut Yalcin

    "Recent years have seen a resurgence of interest in flotation cell design, and one of the areas where attention is being focused is flotation in centrifugal fields which aims at increasing the flotati

    Jan 1, 1994

  • CIM
    A Comparison of Roasting Technologies for Arsenic Removal from Copper Concentrates

    By C. H. Lee, K. Adham, D. Lemieux, J. P. Mai, A. M. S. Hussein, S. Francey

    Copper concentrates contain an increasing amount of arsenic, as the older sources of cleaner ores are depleted. At the same time, the market-determined price penalties on arsenic rich concentrates are

    Jan 1, 2019

  • CIM
    Large-scale panel destress blast at Brunswick mine

    By B. P. Simser, R. K. Brummer, A. Mortazavi, P. P. Andrieux

    "A large-scale panel destress blast was fired at Brunswick mine in the fall of 1999 in order to reduce the ground stresses in a critically important neighbouring mining region. This work, sponsored by

    Jan 1, 2003

  • CIM
    The Brewery Creek Heap Leach Project.

    By Brad Thrall

    "Viceroy Resource Corporation of Vancouver, B.C. has recently developed the Brewery Creek Mine, an open pit heap leach gold mine 55km East of Dawson City in Yukon, Canada. Mineable reserves are 17.1 m

    Jan 1, 1997

  • CIM
    Single Stage SAG/AG Milling Design

    By Brian Putland

    Single stage semi-autogenous / autogenous (S/AG) milling has become a common design for a variety of ore types with the advantages of being comparatively low capital cost and flexible for future expan

    Jan 1, 2012

  • CIM
    A Study of the Geometrical Scale-Dependency of Fractured Rockmasses using Lidar Scanning: The Case Study of Brockville Tunnel

    By I. Vazaios, M. S. Diederichs, N. Vlachopoulos

    "As rock engineering moves from continuum to more discontinuum approaches for modeling, the engineer must make decisions regarding the degree of complexity to simulate for a given application, balanci

    Jan 1, 2015

  • CIM
    The Mechanics of Operation of Column Flotation Machines

    By R. L. Amelunxen

    "In January 1983, Gibraltar Mines Ltd. started an exploratory program on Column Flotation with hopes of improving performance of the Molybdenum Cleaning circuit. The encouraging results led to a colum

    Jan 1, 1985

  • CIM
    A geological appraisal of the coal resources of Nova Scotia

    By Peter A. Hacquebard

    Recent drilling programs have shown that the in-situ coal resources of Nova Scotia are very substantial. The grand totals of the measured, indicated and inferred categories amount to 232 m, 646m and 9

    Jan 1, 1979

  • CIM
    A Process for Cleaning Molybdenite Concentrate

    By F. K. McKean

    Abstract A discussion of the difficulties involved in the production of a clean molybdenite concentrate introduces the paper. There is a brief description of the various methods for producing molyb

    Jan 1, 1947

  • CIM
    The Significance of Using Geological and Geomechanical Data in Selection of Optimal Bits

    By A. Hashempour, D. Javani

    "Selection of an optimal bit is a critical issue in drilling engineering. Specific energy (SE) and Cost per Foot (CPF) are the most common methods for evaluation of bit efficiency and optimal bit sele

    Jan 1, 2015

  • CIM
    Supergene Mineralization at the Kori Kollo Gold Mine, Bolivia

    By C. M. Clapperton, K. E. Darke, A. J. Boyce, C. M. Rice, S. D. Redwood

    "Abstract - The Kori Kollo gold deposit is hosted by a c.15 Ma sericitized dacite stock in the La Joya district on the Bolivian Altiplano. The mineralization is of the Bolivian polymetallic vein (BPV)

    Jan 1, 1997

  • CIM
    Supergene Mineralization at the Kori Kollo Gold Mine, Bolivia (5a50eab3-2567-48d0-8c87-7819113638f7)

    By C. M. Clapperton, K. E. Darke, A. J. Boyce, C. M. Rice, S. D. Redwood

    "The Kori Kollo gold deposit is hosted by a c.15 Ma sericitized dacite stock in the LaJoya district on the Bolivian Altiplano. The mineralization is of the Bolivian polymetallic vein(BPV) type, with a

    Jan 1, 1997

  • CIM
    Arching Effects and Sillmat Behaviour

    By Euler De Souza

    This paper presents a study conducted to assess sillmat behaviour during undercut mining and to provide a comprehensive understanding of the effects of arching and sillmat thickness on stability. The

    May 1, 2002