Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Minimising Crest Loss by Eliminating Surface Dilation Due to PresplittingIn most mines using presplitting the final excavated wall shows a zone of damage just below the crest and well defined presplit half barrels. The crest damage (surface dilation) zone varies and is add
May 1, 2010
-
Leaching of Some Australian Nickeliferous Laterites with Sulphuric Acid at Atmospheric PressureSulphuric acid leaching at atmospheric pressure of a number of Australian nickeliferous laterites was examined in detail. The results obtained indicate that nickel can be extracted from these ores, al
Jan 1, 1978
-
Surface-to-inseam (SIS) Drilling at Oaky Creek Coal Mine – SIS Design Aspects and Drilling EnvironmentBy E Corpuz, J Weissman, S Winter, R Evans
The surface-to-inseam (SIS) directional drilling technique has been utilised at Oaky Creek Coal for more than a decade to predrain both the Oaky No 1 and Oaky North mining areas. The cumulative drilli
Aug 31, 2015
-
Seismic Stability Analysis of Sangan Iron Mine Project Tailings DamBy N Ganjian, A Delavar, F Rashidi Nejad
Iran is one of the most seismically active countries in the world, being crossed by several major fault lines that cover at least 90 per cent of the country. As a result, earthquakes in Iran occur oft
Jul 27, 2015
-
Development of Stockton Borehole CollieryThe early history of the mine is traced from the beginning of shaft sinking in 1886 to the purchase by the Broken Hill Proprietary Co. Ltd. in 1949. A necessary preliminary to mechanisation of the Bor
Jan 1, 1957
-
Total Integrated System Simulation for Master Planning of the Dalrymple Bay Coal ChainBy B Olsson, R Norman, M Volz
Australia has seen unprecedented demand for coal exports in the last ten years and this demand is set to expand further still according to many analysts. This rapid increase in demand has placed press
Sep 26, 2011
-
A Simulation Approach for the Comparison of In-Pit Crushing and Conveying and Truck-Shovel Mining MethodsIn-pit crushing and conveying (IPCC) is being increasingly considered as an alternative to traditional truck-shovel mining methods. The move towards IPCC is driven by a number of factors including the
Dec 6, 2010
-
Empirical mill throughput modelling and linear programming for blend optimisation at the Phu Kham copper-gold operation, LaosBy B Saunders, J Carpenter
PanAust’s Phu Kham copper-gold operation (Phu Kham) in Laos is currently limited by throughput in the Semi Autogenous Grinding (SAG) mill. The ability to accurately predict SAG mill throughput (throug
Sep 20, 2017
-
Designing Energy Efficiency Assessments that Work - Thiess Australian Mining û Case StudyBy P Crittenden
Thiess Pty LtdÆs Australian Mining business unit used 7.6 PJ of energy in the 2007/2008 financial year. This represented more than 85 per cent of Thiess Pty LtdÆs total energy use and therefore meant
Jan 1, 2009
-
Dynamic Simulation in Iron Ore Pelletising PlantsBy P Navarra, R Kuhne
Dynamic simulation (discrete event simulation) is the preferred methodology to evaluate the impact of dynamic aspects of processing plants on the overall plant capacity. This tool can be used to: iden
Jan 1, 2009
-
Investigations Into X-ray Fluorescence Analysis of Slurry Streams at Mount IsaA commercial Philips X-ray Fluorescence (X.R.F.) analyser was converted to an experimental instrument suitable for determination of the accuracy to be expected of X.R.F. on line analyses of concentrat
Jan 1, 1968
-
Innovations and State-of-the-Art Technologies Employed in the Continuous Casting of Slabs and Beam BlanksBy Zajber A, Kulchen R, Letzel D, Weyer A, Schwellenbach J
The search for modem casting plant concepts today focuses more and more on the harmonisation and optimisation of overall concept lines to obtain a continuous quality control and reduce the cost of
Jan 1, 1999
-
Bulk Density of Stratified Iron Ores and Its Relationship to Grade and PorosityBy Wylie A. W, Mathew PJ
Bulk density and grade were determined on a variety of ore samples from the Mount Tom Price iron ore mine and the interrelationship between these properties and porosity deduced.Variable porosity is r
Jan 1, 1978
-
Theory of Sampling – what’s next?By K H. Esbensen
The Theory of Sampling (TOS) has made remarkable strides and has witnessed a suite of achievements over its ~65-year history; especially in the last 15 years, since organised work began for the erstwh
May 9, 2017
-
The Influence of Some Variables on the Brinell Hardness of LeadDuring the extensive research which has been conducted in the Metallurgy Department of the University of Melbourne, into the properties of lead and its dilute alloys, the Brinell test has been used fo
Jan 1, 1940
-
Thinking Outside the Lease - Towards a Strategic View of Regional Water Management by the Mining IndustryIn the last 30 years, human appropriation of global renewable resources has accelerated to the point where 35 per cent of the earthÆs land surface is now in managed agro-ecosystems, consumptive water
Jan 1, 2009
-
Road Tunnel Protection by Water Mist Systems û Implementation of Full-Scale Fire Test Results into a Real ProjectTruck fires in a tunnel can create heat release rates (HRR) significantly higher than 100 MW. Because of a fast spread of smoke and heat the self-rescuing period is shortened significantly. Furthermor
Jan 1, 2008
-
A Review of the Western Coal Fields of New South WalesThe purpose of this paper is to cover in a general way the extent, geology, quality of product, working methods and trials of the coal mining industry. of New South Wales from 1946 to the present day,
Jan 1, 1954
-
Managing the Cumulative Groundwater Impacts of Multiple Iron Ore Projects at Cape Preston (or à One Plus One Plus One Plus One Does Not Equal Four)By J Hall, A Gallardo, M Strizek
Mineralogy and coproponents Sino Iron, International Minerals and Austeel are in the process of developing four world class magnetite iron ore mines with multiple open pits along a 25 km strike length
Jan 1, 2009
-
Some New Ideas on the Age and Origin of the Etheridge Goldfield, Queensland, and their Exploration ImplicationsClose spatial relationships between the deposits of the Etheridge Goldfield (23 000 kg of bullion) and various regional geological and geophysical features suggest that genesis of the ore deposits was
Jan 1, 1980