    The Channel Tunnel Project - Historical Background

    By C. J. Kirkland

    For two thousand years and more, we insular Britons have been grateful for the existence of the narrow strip of water that separates us from mainland Europe. It has given us a sense of security agains

    Jan 1, 1991

  • SME
    Auxiliary Operations

    By Christopher J. Vise

    Although production operations at mines, representing the extraction and removal of the mined material, often appear to receive the greatest amount of attention, the emphasis given to auxiliary operat

    Jan 1, 2008

  • CIM
    Operation of Enviro Clear Thickeners in Series as CCD Units

    By L. W. Hamel

    "Two 35 foot diameter enviro clear thickeners were tested in series as CCD units from June until October, 1978. Up to shutdown in July, we ran with automatic bed level control via the level probes and

    Jan 1, 1979

  • SME-ICGCM
    Improving the Capability for Real Time Assessment of Roof Conditions through Intelligent Roof Bolt Drilling Operations,

    By Robert Anderson

    Advance knowledge of roof conditions can lead to improvement in roof control strategies that will reduce roof falls and ultimately will reduce injuries to mine workers. J.H. Fletcher and Company, in

    Jan 1, 2007

  • SME
    Pit Slope Design Challenges In Residual Soils And Weathered Rock: Background And A Case Study

    By J. Geyer, B. T. Burton, H. W. Newcomen

    For open pits developed in tropical climates the upper portions of the pit walls are often located in residual soils and weathered rock. Due to the presence of relict structures, and the relatively l

    Jan 1, 2000

  • SAIMM
    Large-Scale Design And Testing Of An Improved Fine Coal Dewatering System - Synopsis (0b7ce52d-2bd9-4f5e-84a7-9ce2b2e08562)

    By M. Le Roux

    Fine coal (-500 µm) is notoriously difficult to dewater. It is not uncommon for a dewatered product to have a moisture content as high as 30 per cent after vacuum filtration. This poses several handli

    Jan 1, 2012

  • SME
    Design And Construction Of The Lenihan DAM Outlet Tunnel And Shaft

    By Hemang Desai

    A damaged outlet pipe beneath Lenihan Dam has restricted reservoir discharges, severely constraining the owner?s groundwater recharge program. The solution, a new outlet pipeline through the dam?s rig

  • CIM
    Brunswick Mine SAG Mill Liner Design and Wear

    By Chris Larsen, Ian Orford, Marilene Renaud, Mike Cooper, Lud Strah

    "An AG/SAG mill was commissioned at the Brunswick Mine concentrator in October 1998. This paper discusses the original liner design for the bi-directional AG/SAG mill, observed liner wear, subsequent

    Jan 1, 2003

  • AUSIMM
    Commercialisation of Ni Heap Leaching at Murrin Murrin Operations

    Commercialisation of Ni Heap Leaching at Murrin Murrin Operations

    Sep 13, 2010

  • SME
    A Closer Look At The Geotechnical Properties Of St. Peter Sandstone

    St. Peter sandstone is very different from the minerals and rocks that have been studied extensively in mining. On the one hand, it is brittle as characterized by an unusually high friction angle and

    Feb 27, 2013

  • NIOSH
    IC 8116 Economic Analysis Of The Production Of Ferronickel And Steel From Philippine Nickeliferous Ores ? Summary

    By Sidney Katell

    Philippine laterite and serpentine ores can be utilized in an electric furnace operation to produce both a steel ingot and a ferronickel product. Figure 1 is a schematic interpretation of a plant in w

    Jan 1, 1962

  • SME
    Flotation Monitor Improves Copper Recovery at Bagdad

    Phelps Dodge Mining’s Bagdad, AZ copper facility uses a large series of cone crushers and ball mills to reduce copper ore to very fine particles. The solids are mixed with water to create a slurry

    Jan 1, 2005

  • NIOSH
    OFR-19-82 ADINA/BM - A General Computer Program For Nonlinear Analysis Of Mine Structures

    By K. J. Bathe

    The current version of the computer program ADINA/BM (Automatic Dynamic Incremental Nonlinear Analysis for the Bureau of Mines) for linear and nonlinear, static and dynamic finite element analysis of

    Jan 1, 1978

  • ISEE
    The International Society of Explosives Engineers:, A Valuable Resources for the Explosive Industry

    By Jeffrey L. Dean

    Now in its twenty-fifth year, the ISEE has grown to more than 4000 members representing 75 countries. The Society and its 35 chapters in the US, Canada and Australia work to educate the public about o

    Jan 1, 1998

  • AIME
    Industrial Minerals - Application of Electrostatics to Feldspar Beneficiation

    By E. Northcott, I. M. LeBaron

    Before describing the electrostatic processing of feldspar, it might be well to review some of the basic definitions and terminology of feldspars. The feldspar minerals constitute a group of alumino-s

    Jan 1, 1959

  • SME
    San Vicente to 2nd Aqueduct Pipeline - Tunnel: Drill and Blast in Advance of an Open-Face Digger Shield

    By Brett Campbell

    The San Vicente to 2nd Aqueduct Pipeline?Tunnel project is a raw water conveyance tunnel linking the San Vicente Reservoir (SVR) to the 2nd Aqueduct Pipeline via Rancho Penasquitos Pressure Control Fa

    Jan 1, 2008

  • ISEE
    Trench Blasting in Close Proximity to Existing Utilities in Ultra Metamorphic Rock (705d7ae2-b943-4f91-9b2f-b06e02816eba)

    By Tom Treleaven, Andrew Williams

    Several contracts were let in Greenwich, Connecticut, for the installation of a sanitary sewer. The majority of the excavation was in rock and involved numerous challenges due to the following condit

    Jan 1, 2003

  • SME
    Managing The Drill And Blast Process

    By L. W. Berry

    Drill and blast planning is critical to successful mine production, both in timing and in results. However, typical planning, reporting, and information exchange usually involves large quantities of d

    Jan 1, 2011

  • DFI
    Statnamic Load Testing Of Strain Instrumented Large Diameter Bored Shafts - Synopsis

    By Matthew Janes

    Statnamic load testing is becoming widely accepted as a method to quickly and economically determine the load-deflection behaviour and ultimate static resistance of high capacity deep foundations. Str

    Jan 1, 1996

  • SAIMM
    Integrated Optimization Of Underground Mine Design And Scheduling

    By J. Little

    It is common practice for underground mine plans to be created sequentially, where results from one planning process form the input data for another. While this is practical for manual methods, comput

    Oct 1, 2013