Search Documents

  • NIOSH
    OFR-1-76 Noise Abatement In Mining Machinery - 2.0 Introduction

    By Jerome Apt

    This report presents the methods and results performed pursuant to the U. S. Bureau of Mines contract entitled "Noise Abatement in Mining Machinery," Number H0122054. 2.1 Background Until the

    Jan 1, 1975

  • SME
    Probabilistic Approach To Project-Specific Political Risk Analysis For Mineral Projects

    By S. Dessureault, Z. Gavelan

    As globalization continues, sustainability and social responsibility has become essential in foreign mining investment. However this global trend and the increasing acceptability toward the globalizat

    Jan 1, 2004

  • SME
    Amax Coal’s Delta Mine – Medium-Sized, High-Sulfur Operation Survives Markets Challenges

    By Steve Kral

    Amax Coal Industries Inc.'s Delta Mine is a medium-sized. high-sulfur coal producer that has lived up to the challenges posed by nearly six decades of a highly competitive domestic coal market.

    Jan 1, 1993

  • SME
    An Overview Of Surface Coal Mining In China

    By Jerry C. Tien

    In 2009 China mined 2.695 billion metric tones (Gt) of raw coal. It is estimated that only 3-5% or roughly 135 million metric tones (Mt) of these were mined from 300 some surface operations. Except fo

    Jan 1, 2012

  • ISEE
    Automation of Drill and Blast - Measurement Techniques to Develop Standard Procedures

    By Ewan Selers, Gary Cavanough

    Drilling automation technology is well advanced and automated drill rigs are in use at a number of operating mines. This is not the case for the other drill and blast processes due to significant tech

    Jan 1, 2016

  • NIOSH
    RI 8547 A Mixed Kinetics Dump Leaching Model for Ores Containing a Variety of Copper Sulfide Minerals

    By B. W. Madsen

    To help maintain an adequate supply of minerals to meet national economic and strategic needs, the Bureau of Mines developed a mathematical model that describes acidic ferric sulfate leaching of coppe

    Jan 1, 1981

  • SME
    Reducing Emissions Through The Use Of A Fuel Borne Combustion Catalyst

    By R. Curtis

    To achieve compliance with 2015 EPA Tier 4 Final regulations, which permit only around 10% of Tier 3 particulate matter (PM) and NOx emissions, a number of technologies are being implemented. Use of a

    Feb 27, 2013

  • AUSIMM
    Developing Algorithms and a Computer Program to Predict the Peak Particle Velocity After Blasting in Open Pit Mines and Quarries

    Drill blasting is a widely used method for rock fragmentation in mining, quarrying and construction industries. Environmental effects such as air shocks, dust, flying rocks and ground vibration are un

    Dec 6, 2010

  • NIOSH
    OFR-47(1)-83 Ecological Studies On The Revegetation Process Of Surface Coal Mined Areas In North Dakota - 1. Executive Summary

    By Mohan K. Wali

    This report, the first in a series of 13 reports, provides a summary of 11 major topics on which individual reports have been prepared. These major topics are: (a) Nature of coal mine spoils, topsoils

    Jan 1, 1982

  • SAIMM
    Gautrain Tunnels: Surface Vibration And Ground-Borne Noise

    By J. L. van Niekerk

    The proposed Gautrain Rapid Rail Link (GRRL) will require approximately 15 km of double or twin high-speed rail track tunnels located for the greater part beneath the northern suburbs of Johannesburg,

    Jan 1, 2004

  • SME
    Design-Build of the Lake Hodges to Olivenhain Pipeline Tunnel and Shaft

    By Jon Y. Kaneshiro, Sean A. Menge, M. Luis Piek, Brian Barker

    The Lake Hodges to Olivenhain Pipeline project is part of a 40-megawatt pumped storage project linking two reservoirs as part of the San Diego County Water Authority’s $939 million Emergency Storage P

    Jan 1, 2007

  • SAIMM
    The Manganese Ferroalloys Industry In Southern Africa

    By J. D. Steenkamp

    Southern Africa has a history rich in the pyrometallurgical processing of ores. Two of the alloys produced are high-carbon ferromanganese (74?83 per cent Mn) and silicomanganese (59?67 per cent Mn and

    Aug 1, 2013

  • CIM
    Decision Support Programs

    By Hamid Butt

    Information Technology ??Advanced Information Technology is dramatically changing information flow within organizations. This enables employees to have information at their fingertips to make informe

    May 1, 2006

  • CIM
    Catalytic Heap Leaching of Chalcopyrite Ores Using Jetti’s Technology

    By M. Rebolledo, N. Mora, G. Zarate

    For decades, the mining industry has been focussed to find an efficient and economically attractive process for the leaching of chalcopyrite. Jetti Resources has developed a novel hydrometallurgical a

    Jan 1, 2019

  • SME
    Construction of the Pergau Hydroelectric Power Project, Malaysia

    By Patrick J. Doig

    In mid-1991, the design/build contractor set to work on the Pergau HEP in a remote corner of Malaysia, armed with only a slim volume of conceptual drawings. The next five years saw roads, power lines,

    Jan 1, 2001

  • SAIMM
    Phase Transformations And Surface Characterization Of The Platinum-Chromium Coated System - Synopsis

    By N. Hanief

    This research involves the investigation of phase transformations in the platinum-chromium coated system. Single-layer 0.1 µm platinum coatings were deposited via electron beam deposition on 99.98 per

    Jan 1, 2012

  • SAIMM
    Mining Simulation For Room And Pillar Coal Operation - Synopsis

    By S. P. Pereira

    The mechanized mining cycle using loaders and shuttle cars had it speak in terms of usage in the mining industry during 1950 through 1960. In Brazil, this system is still used at underground coal mine

    Jan 1, 2012

  • AUSIMM
    Current Extraction Technology for Free Milling Auriferous Ores

    By D M. Menne

    This paper is intended to give a general review of current gold extraction technology for free-milling or non-refractory auriferous ores. Fundamental process concepts and some of the differences betwe

    Jan 1, 1986

  • ISEE
    Methods of Evaluating and Predicting Fragmentation

    By Claude Cunningham

    The primary reason for blasting is to fragment rock. In production blasting, the fragment sizes produced are known to exercise an overwhelming influence over working costs: handling costs and tonnage

    Jan 1, 1995

  • IOM3
    Electrochemical removal of lead from aluminium using fused salts

    By F. Tailoka, G. Zhao

    Pb is an unwanted impurity in Al for which there is no established method of removal. As it interacts strongly with alkali metals, separation was achieved by adding Na or K to molten Al at 953-1 003 K

    Apr 1, 1995