Computer simulation of diamond-wire cutting of hard and abrasive rockBy R. Ciccu, P. P. Manca, A. Bortolussi, G. Massacci
Tool performance and the unit cost of cutting depend on a number of operational variables (peripheral velocity, pull-back force, water injection rate, angles of the sections of wire outside the rock)
Aug 1, 1994
-
Niagara Tunnel ProjectBy Doug Harding
The Niagara Tunnel Project (NTP) is a 10.4 km (6.5 mi) long, 14.4 m (47.5 ft)bored tunnel that will run under the City of Niagara Falls from the Upper Niagara River to the Sir Adam Beck Power Station.
Jan 1, 2007
-
High Speed Shotcrete Tunneling in Chalk for the Channel Tunnel Rail Link in the United Kingdom (North Downs Tunnel)By Christian Neumann, Josef Arnold, Albin Reinhart
The Channel Tunnel Rail Link (CTRL) is the most significant railway infrastructure development project in the United Kingdom since the construction of the Channel Tunnel between France and England. Th
Jan 1, 2001
-
RI 3548 Activated Carbon From Coal Refuse For Water Purification ? Introduction (455629b1-acef-4cd5-a587-9410cee32919)By S. J. Broderick
[Huge camp heaps coat. in-.n,- ta._ur nd o tons of coal :'efuse are a familiar sight in coa).--:1'_ni`l ; res io The;;' repre£e: t considerable economic loss, are very ~JZ':Si~i,tl
Jan 1, 1941
-
Earnest Advocacy - A Key to Sustainable Minerals Industry Education - A Philippine ExperienceEarnest Advocacy - A Key to Sustainable Minerals Industry Education - A Philippine Experience
Sep 13, 2010
-
Minerals Beneficiation - Production of Self-Fluxing Pellets in the Laboratory and Pilot Plant (Mining Engineering, Mar 1960, pg 266)By K. E. Merklin, F. D. DeVaney
Students of the modern blast furnace seem unanimously agreed that they are observing a major revolution in practice. Rather than changing construction and operation of the furnaces, most of the great
Jan 1, 1961
-
On Rock Failure Criteria for Coal Measure RocksBy Murali Gadde
Design of underground excavations in coal mines involves two major tasks: estimation of stresses and determination of rock mass strength. Owing to the complicated nature of rock mass, progress in its
Jan 1, 2007
-
Direct And Indirect Slag Corrosion Of Oxide And Oxide-C RefractoriesBy W. E. Lee
Penetration and dissolution mechanisms are reviewed for predominantly single-phase oxide, two phase oxide and oxide-carbon composite refractories by liquid silicate slags. Theoretical models of these
Jan 1, 2004
-
Mt. Baker Ridge Tunnel: Construction Of A Large Diameter Soft Ground Tunnel By The Stacked Drift MethodBy John F. MacDonald
This paper describes the driving of a 400 m long by 25 m diameter highway tunnel through sensitive, overconsolidated silts and clays. The design concept requires the construction of the permanent supp
Jan 1, 1985
-
Borehole Geophone Method for Estimating Tunnel Blast Vibration PropagationBy Kyle Ott, Bernard Daly, Syed Haq, Douglas Anderson, Parsons Brinckerhoff
Drill and blast was determined to be the most cost-effective means of excavating the Raw Water Tunnel (RWT) for the Croton Water Treatment Plant in the Bronx, New York City. One of the major issues co
Jan 1, 2012
-
Murrin Murrin CCD1 Rake Mechanism Modification - The Decision and the ResultBy J Belke
Murrin Murrin Operations have not had a successful beginning. Numerous reliability and operability issues, many of which are the result of design decisions, have been addressed through mechanical and
Jan 1, 2004
-
RI 3162 Motor Gasoline Survey, August, 1931 - Part I -Specification Data ? IntroductionBy A. J. Kraemer
The twenty-fourth of a series of semiannual surveys pertaining to motor gasoline marketed in the United States was made by the Bureau of Mines in August, 1931, The first part of a report giving the re
Jan 1, 1932
-
Lowered Expectations: The Impact Of Yield Stress On Sand Transport In Laminar, Non-Newtonian Slurry Flows (db234ae4-9636-4048-baa8-d2e179ef9ec7)By R. G. Gillies
The pipeline transport of paste, backfill or thickened tailings slurries is an important component of the tailings disposal process in many mines around the world. These mixtures contain significant f
Jan 1, 2007
-
Process Mechanisms In Ilmenite SmeltingBy J. H. Zietsman
It has previously been observed that industrial high-titania slags display a compositional invariance, remaining close to stoichio-metric M3O5. The present study focuses on this invariance and the phe
Jan 1, 2004
-
Main fan energy managementSouth Africa?s primary electricity supplier, Eskom, provides incentives to reduce power demand during critical times by granting capital through a Demand Side Management programme. DSM encourages the
Jan 1, 2009
-
Water and Slurry Bulkheads in Underground Coal Mines: Design, Monitoring, and Safety ConcernsBy S. Harteis, D. Dolinar
Many mining operations rely on bulkheads to provide a barrier between impounded water or slurry and active mine workings. However, bulkhead failures could cause and have caused catastrophic flooding
-
Monitoring of Highwall Stability at the Dome Open PitBy John G. Henning
The Porcupine Joint Venture operates the Dome Mine in South Porcupine, Ontario. Dome underground began production in 1910. It is the longest continuous operating gold mine in Canada, producing in exce
May 1, 2004
-
OFR-2(1)-78 Water Management In Oil Shale Mining - Volume 1- Main TextBy A. Brown
This report details work performed and results obtained in a study of the water management aspects of oil shale mining and retorting in the Piceance Creek Basin. Three specific sites were investigated
Jan 1, 1977
-
RI 6010 Pyrometallurgical Beneficiation Of Offgrade Chromite And Production Of Ferrochromium ? SummaryBy Willard L. Hunter
The research described in this Bureau of Minus report was conducted to improve the chromium-iron ratio of offgrade chromite. Two methods were used: (1) Iron was selectively reduced from chromite by ca
Jan 1, 1962
-
Industrial Minerals - Eastern Washington-Idaho Clay BasinBy E. C. Stephens
The eastern Washington— Idaho clay region stretches along the northeast margin of the Columbia basin for 150 mil es. The three better known and developed clay areas are Clayton, Wash., (2 miles north
Jan 1, 1961